Concrete Pump Truck Hot Sale (45m)

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Concrete Pump Truck Hot Sale  (45m)

Product Details

Basic Info.

Model NO.:45m

 

Type:Concrete Pump

Shotcrete Type:Wet

 

Machining Process:Hydraulic

Structure:Rotor Type

 

Productivity:90㎡/h

Feeding Height:1400mm

 

Vibrating Amplitude:1.2mm

Certification:ISO9001: 2000, CE

 

Condition:New

Color:White

 

Export Markets:Global

Additional Info.

Trademark:SINOTRUK

 

Packing:Nude

Standard:SGS, GOST

 

Origin:China

Production Capacity:500, 000 Unit/Year

Product Description


    ModelHDT5401THB-45/5
Model of chassis
HOWO  ZZ5437S4667C
    Weight40×103kgDrive mode of chassis8×4

Max. travel speed
80km/h,
Cab with air-condition and sleeper

Wheelbase
1-2 / 2-3 /  3-4Wheelbase(mm)1800 / 4600 / 1350

Overall height
     
Overall length
13300mm
     
Overall width
2500mmTreadfront wheel2022mm
     
Overall height
4000mmrear wheel1830mm

 Engine
  Engine
Four stroke in-line six cylinder water-cooled EFI diesel engine
   Tire size12.00-20,1200R20

Min. turning radius
12m

Model of engine
WD615.95   
Braking distance
10m/30km/h

Output power
273KW(371PS)2200rpm            
Boom
        Form
Five section, folded, full hydraulic
Max. torque1600KW/2200r/min
Max. ground clearance
44.7m
Emission standardIIIEUROIII
Diameter of conveying pipe
DN125

Gearbox model
RT-11509C
Length of end hose
3m
     Displacement9726mlSection 1 boomLength9650
Pumping systemDrive modeHydraulic typerotation910
×Cylinder diameter ×strokeφ140mm×2000mmSection 2 boomLength8600mm
×Delivery cylinder diameter × strokeφ230mm×2000mmrotation1800
Valve typeSValve typeSection 3 boomLength8600mm
Displacement in theory125m3/hrotation1800
Section 4 boomLength8450mm
Pumping pressure in theory8.5 Mparotation1800
Section 5 boomLength8400mm
rotation2700
Rotating range of placing boom3650
Pumping times in theory26/
26 times/min.

Max. placing radius
40.7m

Max. placing height
44.7
Hydraulic system pressure32MPa

Lubricating method
Automatic grease lubrication

Hopper capacity
0.6M3
Oil tank capacity
900L

Feeding height
1.40mControl/
Manual/ remote control

System oil pressure
32Mpa
Max. water pressure of water pump
4MPa

Slump constant
14cm~23cm
Water tank volume
560L

Max. aggregate size
40mmCooling method of hydraulic oilAir cooling

High and low pressure pumping switch
ManualCleaning way of concrete pipe/
Washing/ dry-cleaning

Concrete Pump Truck Hot Sale  (45m)

Concrete Pump Truck Hot Sale  (45m)


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the difference between concrete conveyors and concrete conveyors?
The parameters of the main pump are used to determine the speed and transport height of the pump. The horizontal distance is determined by the length of the cloth rod. It is suitable for pouring concrete in fixed mode and can ensure the uniformity of concrete and increase the compactness.
Q:What is the difference between a concrete pump and a concrete pump?
Concrete pump "and" concrete pump "are concrete transport machinery, the same use, but the former need to use the car dragging transport and the need for additional stent pipeline, while the latter is the locomotive body, a free stretch of the boom, no pipe
Q:Why does the concrete pump main cylinder check valve damage cause the cylinder stroke to be short and the pumping is weak?
Type of pipe area, the rod cavity of the oil through the rodless chamber check valve back to the main hydraulic system (the one-way valve on the oil cooling and piston buffer function), you must extend through the just
Q:How to operate concrete pump
(10) after the operation, the hopper and the pipeline must be all the concrete output, and then the pump, hopper, pipe cleaning.
Q:What is the performance characteristics of concrete pump
9all parts of the national standard, interchangeability is better
Q:90KW concrete pump should be used in the number of generators?
say it is not just a concrete pump, there are additional water equipment, so that all the equipment starting current together
Q:How to prevent concrete pump blockage
Pipeline connection error: pipe error is also likely to cause plugging, pipe layout should be the shortest distance, least elbow, the maximum elbow principle.
Q:Is it easy to use fine stone concrete pump?
, High-efficiency construction equipment; fine stone concrete transport equipment for construction, roads, mines and other works of fine stone concrete or mortar delivery, installation of jet accessories do spray pump for concrete, mortar, refractory materials and landscaping soil spray throwing.
Q:What is the introduction of fine stone concrete pump
It has the capability of long-distance high-level pumping and can arrange the pipeline flexibly,
Q:Why does concrete pump truck need pipe?
The concrete pipe is used to replace the concrete slurry before the concrete is pumped. It can be quickly dissolved in water at room temperature to form a lubricating film with countless micro-anions so that the surface of the pipe wall is sufficiently lubricated.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range