• Concrete Pump Truck Competive Price (45m) System 1
  • Concrete Pump Truck Competive Price (45m) System 2
Concrete Pump Truck Competive Price (45m)

Concrete Pump Truck Competive Price (45m)

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Concrete Pump Truck Competive Price (45m)

Product Details

Basic Info.

Model NO.:HDT5401THB-45/5

 

Type:Concrete Pump

Shotcrete Type:Wet

 

Machining Process:Hydraulic

Structure:Rotor Type

 

Productivity:90㎡/h

Feeding Height:1400mm

 

Vibrating Amplitude:1.2mm

Certification:ISO9001: 2000, CE

 

Condition:New

Color:White

 

Export Markets:Global

Additional Info.

Trademark:SINOTRUK

 

Packing:Nude

Standard:SGS, GOST

 

Origin:China

Production Capacity:500, 000 Unit/Year

Product Description


    ModelHDT5401THB-45/5
Model of chassis
HOWO  ZZ5437S4667C
    Weight40×103kgDrive mode of chassis8×4

Max. travel speed
80km/h,
Cab with air-condition and sleeper

Wheelbase
1-2 / 2-3 /  3-4Wheelbase(mm)1800 / 4600 / 1350

Overall height
     
Overall length
13300mm
     
Overall width
2500mmTreadfront wheel2022mm
     
Overall height
4000mmrear wheel1830mm

 Engine
  Engine
Four stroke in-line six cylinder water-cooled EFI diesel engine
   Tire size12.00-20,1200R20

Min. turning radius
12m

Model of engine
WD615.95   
Braking distance
10m/30km/h

Output power
273KW(371PS)2200rpm            
Boom
        Form
Five section, folded, full hydraulic
Max. torque1600KW/2200r/min
Max. ground clearance
44.7m
Emission standardIIIEUROIII
Diameter of conveying pipe
DN125

Gearbox model
RT-11509C
Length of end hose
3m
     Displacement9726mlSection 1 boomLength9650
Pumping systemDrive modeHydraulic typerotation910
×Cylinder diameter ×strokeφ140mm×2000mmSection 2 boomLength8600mm
×Delivery cylinder diameter × strokeφ230mm×2000mmrotation1800
Valve typeSValve typeSection 3 boomLength8600mm
Displacement in theory125m3/hrotation1800
Section 4 boomLength8450mm
Pumping pressure in theory8.5 Mparotation1800
Section 5 boomLength8400mm
rotation2700
Rotating range of placing boom3650
Pumping times in theory26/
26 times/min.

Max. placing radius
40.7m

Max. placing height
44.7
Hydraulic system pressure32MPa

Lubricating method
Automatic grease lubrication

Hopper capacity
0.6M3
Oil tank capacity
900L

Feeding height
1.40mControl/
Manual/ remote control

System oil pressure
32Mpa
Max. water pressure of water pump
4MPa

Slump constant
14cm~23cm
Water tank volume
560L

Max. aggregate size
40mmCooling method of hydraulic oilAir cooling

High and low pressure pumping switch
ManualCleaning way of concrete pipe/
Washing/ dry-cleaning

Concrete Pump Truck Competive Price (45m)

Concrete Pump Truck Competive Price (45m)


Q:How does the concrete pump operate?
The suction and discharge process of the concrete is: When the main hydraulic pump drives the concrete piston retracts, the concrete poured into the hopper is sucked into the conveying cylinder through the suction port of the hopper, driven by the stirring blade. When the main hydraulic cylinder moves forward,
Q:How high concrete pouring concrete pump can be poured how high?
Currently used in the car pump, arm length of 30 meters to more than 40 meters up to a small arm length of more than 50 meters to 70 meters.
Q:What kind of driver's license does the concrete pump need?
According to the "People's Republic of China Road Traffic Safety Law" Chapter II, Article XI: driving motor vehicles on the road, should be hanging motor vehicle number plate, placed inspection signs, insurance signs, and the vehicle to carry motor vehicle driving permit.
Q:What is the difference between the construction of a concrete pump and a concrete distributor?
Pumps require concrete and easy to work, concrete admixture to add pumping agent.
Q:How to install concrete pump
At the top dead center of the cylinder, check whether the S valve is operating at normal speed and position.
Q:How to choose concrete pump concrete pump
Concrete pouring element concrete pump truck selection should be based on the concrete engineering object, characteristics, the required maximum transport distance, concrete construction plan, concrete pump form and the specific conditions of the line to consider 2. Building type and structure of concrete pump performance Random type
Q:What is the difference between a concrete pump and a concrete pump?
Concrete pump, also known as concrete pump, composed of pump and pipe.
Q:What is the difference between fine stone concrete pump and tow pump?
Equipment selection of a number of concrete pump of the first technology, is the first domestic fine stone transport equipment.
Q:What is the meaning of cast - in - place concrete secondary grouting?
Recycled concrete secondary grouting refers to the concrete pouring after solidification; with grouting equipment will be designed slurry (usually cement slurry, water, highway for a certain ratio of cement, sand) into the concrete due to solidification and shrink
Q:How much concrete construction is needed for concrete pump construction
The concrete pump uses the pressure to transport the concrete along the pipe continuously.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords