Concrete Pump Truck Best Price of 24-58meters

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Concrete Pump Truck Best Price  of 24-58meters

Product Details

Basic Info.

Model NO.:HTD5180THB-24/3

 

Type:Concrete Pump

Shotcrete Type:Wet

 

Machining Process:Hydraulic

Structure:Rotor Type

 

Productivity:90㎡/h

Feeding Height:1400mm

 

Vibrating Amplitude:1.2mm

Certification:ISO9001: 2000, CE

 

Condition:New

Color:White

 

Export Markets:Global

Additional Info.

Trademark:SINOTRUK

 

Packing:Nude

Standard:SGS, GOST

 

Origin:China

Production Capacity:500, 000 Unit/Year

Product Description


ModelHTD5180THB-24/3Model of chassisSINOTRUK
Weight18460kgDrive mode of chassis4×2/6x4
Max. travel speed92km/hCab with sleeper
Wheelbase5600 mm


Outline
     Overall length13740mm
     Overall width2490mmTreadfront wheel
     Overall height4000mmrear whee

  
Engine
    Model of engineWP10.290   Tire size12.00R20
Min. turning radius
   Braking distance
Output power290PS(213KW)            

B
oom
        Formthree section, folded, full hydraulic
Max. torque1055NMMax. ground clearance23.1m
Emission standardEuroIIIDiameter of conveying pipeDN125
Gearbox model9JS119Length of end hose3m
     displacement97269726MLSection 1 boomLength8220

Drive modeHydraulic typerotation910
×Cylinder diameter ×strokeφ140mm×2000mmSection 2 boomLength5680mm
×Delivery cylinder diameter × strokeφ230mm×2000mmrotation1800
Distributing valve typeSvalveSection3 boomLength5215mm
Displacement in theory160/70m3/hrotation2680



Pumping pressure in theory8/11.8Mpa

Rotating range of placing boomany
Pumping times in theory19/19 times/minMax. placing radius19.1 m
Max. placing height23.1 m
Hydraulic system pressure32MPa
Method of lubricationAutomatic grease lubrication
Hopper capacity0.7M3Oil tank capacity1000L
Feeding height1.40mControl/Manual/ remote control
System oil pressure32MpaMax. water pressure of water pump6MPa
Slump constant14cm~23cmWater tank volume650L
Max. aggregate size40mmCooling method of hydraulic oilAir cooling
Outrigger span4550×2280×6030Cleaning way of concrete pipe/Washing/ dry-cleaning

Concrete Pump Truck Best Price  of 24-58meters

Concrete Pump Truck Best Price  of 24-58meters


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What factors will be taken into account when selecting the pump chassis?
In the fuel prices continue to rise today, pump fuel consumption is also a factor that customers have to consider.
Q:What kind of concrete delivery tank is better
Is a professional production of coagulation tank conveyor enterprises l company's main products: a variety of concrete transmission cylinder, wear-resistant sets, high school low-pressure cylinder.
Q:What is the difference between fine stone concrete pump and tow pump?
Equipment selection of a number of concrete pump of the first technology, is the first domestic fine stone transport equipment.
Q:How much concrete construction is needed for concrete pump construction
The pump body installed in the car chassis, and then equipped with retractable or inflected cloth rod, the composition of the pump.
Q:What are the precautions for the operation of the concrete pump truck?
The minimum amount of cement in the pumped concrete is 300 kg / m3.Pumping concrete sand content should be 38% to 45%.
Q:What is the depreciation period for concrete and concrete carriers and how much net residual value is
The depreciation period for concrete and concrete carriers is 4 years and the net residual value is 2%.
Q:What is the difference between a concrete pump and a valve?
pump and diesel and two major series, to be specific according to your actual situation
Q:What parts are concrete pump parts?
Concrete pump from the hopper, pumping system, hydraulic system, cleaning system, electrical systems, motors, walking chassis and other components.
Q:How to prevent concrete pump blockage
Pipeline connection error: pipe error is also likely to cause plugging, pipe layout should be the shortest distance, least elbow, the maximum elbow principle.
Q:When the concrete pump in the transport of concrete before the pipeline should be what lubrication
If you pouring a long time, you can pouring, as long as the vibration stick to keep up with nothing.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range