Concrete Pump Truck 80km/H 37m in German

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Concrete Pump Truck 80km/H 37m in German

Product Details

Basic Info.

Model NO.:SY5271THB 370C-8

 

Type:Concrete Pump

Machining Process:Welded Molding Machine

 

Structure:Cylinder Type

Feeding Height:as Required

 

Certification:ISO9001: 2000, CE, BV SGS etc

Condition:New

 

Model:Sy5271thb 370c-8

Vertical Reach:37.0m

 

Horizontal Reach:33.0m

Reach Depth:21.3m

 

Unfolding Reach:8.3m

Emission Standard:National III

 

Engine Power:265kw

Max. Speed:80km/H

 

Concrete Theoretical Output:Lowe Pressure 140 M3/H

High Pressure:100 M3/H

 

Export Markets:Global

Additional Info.

Trademark:YU JIE

 

Packing:Nude Packing

Standard:CE, ISO, SGS, BV

 

Origin:Henan, China (Mainland)

HS Code:8413400000

 

Production Capacity:500 Sets / Year

Product Description


ModelSYG5230THB 28SYG5230THB 28

 
 
Vehicle Parameters
Length10716mm10497mm
Width2500mm2490mm
Height3672mm3641mm
Dead Weight22000kg
Boom & OutriggerVertical Reach27.7m
Horizontal Reach24.0m
Reach Depth13.0m
Unfolding Reach6.5m
1st Section   Length7100mm
Articulation90°
2nd Section     Length5523mm
Articulation180°
3rd Section   Length5500mm
Articulation245°
4th Section   Length5699mm
Articulation248°
Turntable Rotation Angle±360°
Outrigger Spread Width -- Front6100mm
Outrigger Spread Width -- Rear2663mm
Pumping SystemConcrete Theoretical Output      Lowe Pressure120m3 /h
High Pressure70m3/h
Theoretical Pumping Pressure      Lowe Pressure6.5MPa
High Pressure12MPa
Max. Strokes Per Min          Lowe Pressure23 times/min
High Pressure13 times/min
Delivery Cylinder Diameter230mm
Delivery Cylinder Strokes2000mm
Hydraulic SystemOpen Loop
Hydraulic System Oil Pressure32 MPa
Oil Tank Capacity650L
Water Tank Capacity400L
Pipeline Size125mm
End Hose Length3m
End Hose Diameter 125mm
ChassisChassis ModelISUZU CYZ51Q 6 x 4 (Euro III)  BENZ Actros 3341
Engine TypeISUZU 6WF1A (Euro III) OM501LA. III /17
Engine Power265kW/1800rpm   300kW/180rpm
Emission StandardEuro III
Capacity of Fuel Tank380L  400L
Displacement14.526L 11.946L
Max. Speed80km/h
Brake Distance≤10m/30km/h

Concrete Pump Truck 80km/H 37m in German

Concrete Pump Truck 80km/H 37m in German


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What factors will be taken into account when selecting the pump chassis?
In the fuel prices continue to rise today, pump fuel consumption is also a factor that customers have to consider.
Q:What is the difference between concrete conveyors and concrete conveyors?
The parameters of the main pump are used to determine the speed and transport height of the pump. The horizontal distance is determined by the length of the cloth rod. It is suitable for pouring concrete in fixed mode and can ensure the uniformity of concrete and increase the compactness.
Q:What is the meaning of cast - in - place concrete secondary grouting?
Recycled concrete secondary grouting refers to the concrete pouring after solidification; with grouting equipment will be designed slurry (usually cement slurry, water, highway for a certain ratio of cement, sand) into the concrete due to solidification and shrink
Q:How much concrete construction is needed for concrete pump construction
The concrete pump uses the pressure to transport the concrete along the pipe continuously.
Q:Concrete pump truck hydraulic system open and closed the advantages and disadvantages of what
Closed system does not need too much fuel tank, the momentary impact is smaller, variable control is convenient, less pollution, suitable for large flow system.
Q:How to achieve the concrete pump pendulum for the change?
2. Proximity switch or stroke switch is a commutation signal to the sequence valve, and then the first valve to give a commutation signal to the main cylinder to a commutation signal.
Q:Why is my concrete pump often appear plugging phenomenon?
Pumping, the speed of the choice is critical, the operator can not blindly map fast, sometimes haste makes waste.
Q:What are the advantages of concrete pump gate valve and S pipe valve?
Simple structure, smooth flow channel, low flow resistance of concrete; high pumping pressure; hopper from the ground height is low, easy to mix concrete truck to the hopper discharge; for the speed of fast, low noise.
Q:What is a concrete pump?
Concrete pump, also known as concrete pump, composed of pump and pipe.
Q:How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
Some poor concrete, stop half an hour afraid of blocking the pump, some four hours are all right.The past is relatively poor concrete, stop the pump to block the pump

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range