Concrete Pump Truck 6X4 Heavy Duty (TP37R4U)

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Concrete Pump Truck 6X4 Heavy Duty (TP37R4U)

Product Details

Basic Info.

Model NO.:VL5281THB

 

Certification:ISO9000, CCC

Transmission Type:Manual

 

Emission Standard:Euro 4

Displacement:8

 

Engine Type:4 Stroke

Payload:30T

 

Fuel:Diesel

Drive Mode:6x4

 

Maximum Horsepower:300-400hp

Condition:New

 

Height:42 Meters

Horse Power:336HP

 

Chassis:Sinotruk HOWO

Name:Concrete Pump Truck

 

Export Markets:South America, Southeast Asia, Africa, Mid East

Additional Info.

Trademark:VELDLION

 

Packing:in Bulk or in Container, Wax Polished

Standard:CE, ISO9001: 2000

 

Origin:China

HS Code:8706002200

 

Production Capacity:300 PCS Per Month

Product Description

37 meters and 42 meters: 336hp and 371hp;
Good quality and reasonable price.

MODELHDT5281THBchassis modelSinotruk HOWO 
BRANDWELDLIONtypeConcrete Pump Truck
Rated weight
Gross weight 28,000kg
Kerb weight27,870kgFUELdiesel
emission standardEURO IIIAXLE3
wheel base4595+1310axle load6200/21800
Number of Leaf Springs8/10Number of TYRE10
TYRE295/80R22.5Approach/departure angle:16/11
Overhang F/R:1400/3500front gauge2065
track rear1850/1850

length12000Width2490
height3800

maximum speed85Passengers2
Max. traveling speedkm/h90
Min. turning radiusmm8800
Brake distancem7
Approach angle°16
Departure angle°11
Chassis model
HOWO ZZ5307N4647C (336HP, EURO III)
Max. engine powerkw247(2200r/min)
Max. engine torquen.m1350(1100-1600r/min)
Max. grade ability%35
Fuel consumptionL/100km34
Overall dimension(L×W×H)mm12000×2490×3850
Total weightkg29000

Concrete Pump Truck 6X4 Heavy Duty (TP37R4U)

Concrete Pump Truck 6X4 Heavy Duty (TP37R4U)


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
Some poor concrete, stop half an hour afraid of blocking the pump, some four hours are all right.The past is relatively poor concrete, stop the pump to block the pump
Q:Why concrete pump down to play always block the tube
In addition to pay attention to pipeline laying, there are also in the concrete pouring process should also pay attention to a certain amount of concrete slump can not be too large, 120-140mm on it
Q:What is the performance of the 60-type concrete pump?
Maximum theoretical vertical distance m 270Maximum theoretical level of transport distance m 1200
Q:What is the main composition of concrete pump
Concrete large transport equipment, for high-rise, high-speed, overpass and other large concrete concrete concrete work.
Q:What factors will be taken into account when selecting the pump chassis?
Pumps special use of the environment on the after-sales service requirements are very high, after-sales service is timely and even decide whether the user contract construction contract can be successfully completed.
Q:What are the requirements of the concrete pump?
8, the transfer of concrete pump should pay attention to safety requirements, should be consistent with product specifications and the relevant provisions of the standard.
Q:What is the pressure of a support leg when the concrete pump is operating?
I read the information about the pump, usually the maximum weight of each leg to bear the quality of the vehicle with almost the same.
Q:What is the difference between the concrete pump and the concrete pump?
The use of pressure to transport the concrete along the pipeline. By the pump and the composition of the pipeline. According to the structure is divided into piston type,
Q:What is the method of washing the concrete pump?
S pipe valve concrete pump commonly used water washing methods are three, introduced as follows.
Q:What is the maintenance method of concrete pump?
Vertical pipe should be no less than 10m with a check valve of the horizontal tube, is strictly prohibited vertical tube directly connected to the concrete pump output.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range