Concrete Pump Trailer Pump Diesel Engine HBTS90

Ref Price:
Loading Port:
Lianyungang
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

It is commonly referred to as a line pump or trailer-mounted concrete pump. This pump requires steel or flexible concrete placinghoses to be manually attached to the outlet of the machine. Those hoses are linked together and lead to wherever the concrete needs to be placed. Line pumps normally pump concrete at lower volumes than boom pumps and are used for smaller volume concrete placing applications such as swimming pools,sidewalks, and single family home concrete slabs and most ground slabs.



Main Product Features:

1. Powerful machine adopts DERTZ diesel engine (made in China). 
2. Import generator is optional. 
3. The high quality hydraulic valves and oil pump use Germen KAWASAKI products. 
4. The valve for change-over from high pressure to lower pressure is designed to be easily controlled, which can adjust the condition of the pump easily in accordance with the requirement of job site. Dismantle the tube is not necessary so that it can avoid the pollution.



Product Specifications:

Parameter/ unit

HBT90    

Max theory Output(m3/h)

90

Max Pumping   Pressure(MPa)

18

Hydraulic system type

Open

Power mode

Diesel engine

Speed(r/min)

2200

Power(kw)

176

Valve type

S

Diameter of oil cylinder(mm)

150

Cylinder diameter(mm)

200

High- lowe pressure switching

Yes

Hydraulic oil tank capacity(L)

580

Hopper capacity(m3)

0.8

Hopper jeight(mm)

1380

Total mass(kg)

6800

Dimension: L*W*H(mm)

7100/2200/2800


Our Advantages:

1.Training Solutions – we develop our people through high impact training. We increase the connective intelligence potential of individuals and teams through practical, solution-focused programs in areas such as innovation, team collaboration, management development, strategic thinking and decision making.


2. Coaching Solutions - we increase leadership potential with performance coaching. We increase the connective intelligence potential of our managers and key contributors,    assessing and developing both their cognitive and emotional intelligence's (capabilities) as the latest research, and practical experience, indicates that both are needed to drive sustained performance.


3. Reward Solutions – We reward our deserving people based on performance (we ensure equitable treatment of employees because appraisals are based on result of performance) by providing the necessary incentives. Its components can be a combination of bonuses, a range of appropriate benefits such as International trips, commissions and Stock option incentive plan for management & senior workers.



FAQ:

Q1: How do we guarantee the quality of our products?

A1: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.


Q2: How soon can we receive the product after purchase?

A2: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 30 to 60 workdays.


Q3: If we can produce some Trailer Pump according to customers request?

A3: Yes, we can produce Trailer Pump according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.


Q4: How to make a quick resolution for after service?

A4: OKorder and our manufacture both have overseas branches all-around of world, if necessary, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.


Concrete Pump Trailer Pump Diesel Engine HBTS90

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What kind of driver's license does the concrete pump need?
According to the "People's Republic of China Road Traffic Safety Law" Chapter II, Article XI: driving motor vehicles on the road, should be hanging motor vehicle number plate, placed inspection signs, insurance signs, and the vehicle to carry motor vehicle driving permit.
Q:What is the price of concrete pump truck?
If you want to do the rural market, then it is recommended to buy a small, width of 2 meters 3 or so wheelbase 4700, very suitable for rural markets, and rural housing does not owed money, finished to give money, small pump market is more chaotic,
Q:What is high and low pressure switching and hydraulic gear ratio on concrete pumps?
Concrete pump on the high and low voltage switch and hydraulic transmission ratio means:
Q:What is the performance of the 60-type concrete pump?
Distribution valve type S pipe valve (integral casting)Concrete cylinderBore × travel mm 200 × 1650 specifications:
Q:What is the depreciation period for concrete and concrete carriers and how much net residual value is
The net residual value of fixed assets is between 3% and 5% of the original value of fixed assets.
Q:What is the pumpability of concrete
Pumpability' is a qualitative argument that the pumpable concrete slump is generally greater than 160mm, the mortar content can not be too low, the maximum aggregate size does not exceed one-third of the diameter of the pump,
Q:What parts are concrete pump parts?
Concrete pump from the hopper, pumping system, hydraulic system, cleaning system, electrical systems, motors, walking chassis and other components.
Q:What is the fuel consumption per vehicle per kilometer and the fuel consumption per pump when pumping?
Mercedes-Benz chassis than the Isuzu expensive, the quality is also considered excellent, but fuel consumption than the bells more!
Q:How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
More stupid, and if the replacement of more than an hour, it may be very unskilled.
Q:How is the mortar in concrete pumping concrete coexisting and distinguishing in a pump?
The body should maintain a slow rotation, before discharge, the simplified speed should be accelerated to 20 ~ 30s before discharge.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range