Concrete Pump Trailer Pump Diesel Engine HBTS60

Ref Price:
Loading Port:
Lianyungang
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

It is commonly referred to as a line pump or trailer-mounted concrete pump. This pump requires steel or flexible concrete placinghoses to be manually attached to the outlet of the machine. Those hoses are linked together and lead to wherever the concrete needs to be placed. Line pumps normally pump concrete at lower volumes than boom pumps and are used for smaller volume concrete placing applications such as swimming pools,sidewalks, and single family home concrete slabs and most ground slabs.



Main Product Features:

1. Powerful machine adopts DERTZ diesel engine (made in China). 
2. Import generator is optional. 
3. The high quality hydraulic valves and oil pump use Germen KAWASAKI products. 
4. The valve for change-over from high pressure to lower pressure is designed to be easily controlled, which can adjust the condition of the pump easily in accordance with the requirement of job site. Dismantle the tube is not necessary so that it can avoid the pollution.



Product Specifications:

Parameter/ unit

HBT60    

Max theory Output(m3/h)

85

Max Pumping   Pressure(MPa)

13

Hydraulic system type

Open

Power mode

Diesel engine

Speed(r/min)

2200

Power(kw)

130

Valve type

S

Diameter of oil cylinder(mm)

140

Cylinder diameter(mm)

200

High- lowe pressure switching

Yes

Hydraulic oil tank capacity(L)

580

Hopper capacity(m3)

0.8

Hopper jeight(mm)

1380

Total mass(kg)

6780

Dimension: L*W*H(mm)

7200/2000/2600


Our Advantages:

1.Training Solutions – we develop our people through high impact training. We increase the connective intelligence potential of individuals and teams through practical, solution-focused programs in areas such as innovation, team collaboration, management development, strategic thinking and decision making.


2. Coaching Solutions - we increase leadership potential with performance coaching. We increase the connective intelligence potential of our managers and key contributors,    assessing and developing both their cognitive and emotional intelligence's (capabilities) as the latest research, and practical experience, indicates that both are needed to drive sustained performance.


3. Reward Solutions – We reward our deserving people based on performance (we ensure equitable treatment of employees because appraisals are based on result of performance) by providing the necessary incentives. Its components can be a combination of bonuses, a range of appropriate benefits such as International trips, commissions and Stock option incentive plan for management & senior workers.



FAQ:

Q1: How do we guarantee the quality of our products?

A1: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.


Q2: How soon can we receive the product after purchase?

A2: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 30 to 60 workdays.


Q3: If we can produce some Trailer Pump according to customers request?

A3: Yes, we can produce Trailer Pump according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.


Q4: How to make a quick resolution for after service?

A4: OKorder and our manufacture both have overseas branches all-around of world, if necessary, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.


Concrete Pump Trailer Pump Diesel Engine HBTS60

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What kind of driver's license does the concrete pump need?
Driver's license to use B2 card, qualification certificate can be transported with ordinary goods, no need to use special vehicle qualification certificate.
Q:How much concrete construction is needed for concrete pump construction
The concrete pump uses the pressure to transport the concrete along the pipe continuously.
Q:How much concrete pump power
The concrete pump power is from 75kW to 130kW.
Q:What is the method of washing the concrete pump?
If the cutting ring and eye plate wear is not serious, cutting ring and eye plate spacing <0.1mm, and no more than 1mm between the groove scratches, available direct water method.
Q:How to choose concrete pump concrete pump
The length of the boom is 28 ~ 36m concrete pump is a large amount of products on the market, accounting for about 75%. Long-arm concrete pump will become the main model of construction.
Q:What is the pressure of a support leg when the concrete pump is operating?
I read the information about the pump, usually the maximum weight of each leg to bear the quality of the vehicle with almost the same.
Q:How to cooperate with concrete mixers and concrete pump trucks
Concrete mixer is to pull the concrete, the pump is playing concrete, the mixer to pull the material to the site
Q:What is the difference between the construction of a concrete pump and a concrete distributor?
Pumping sub-trailer pump and car pump, drag pump delivery range is relatively large, then take the tube in the past can (in the case of pumping pressure allowed), the drawback is relatively bulky, pouring concrete need to arrange people to install pipe,
Q:How high concrete pouring concrete pump can be poured how high?
The longer the arm of the car pump, the more it needs to pass the road, stop the pump position is greater, so there are many sites can not use more than 60 meters of the pump (usually 60 meters of the car pump, the pump and the legs of the position width
Q:What measures should be taken in the construction of the underground garage
1. In the middle of the garage between the two beams with a sleepers into the channel for the pump on the top of the passage.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range