Concrete Pump Trailer Pump Diesel Engine HBTS45

Ref Price:
Loading Port:
Lianyungang
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

It is commonly referred to as a line pump or trailer-mounted concrete pump. This pump requires steel or flexible concrete placinghoses to be manually attached to the outlet of the machine. Those hoses are linked together and lead to wherever the concrete needs to be placed. Line pumps normally pump concrete at lower volumes than boom pumps and are used for smaller volume concrete placing applications such as swimming pools,sidewalks, and single family home concrete slabs and most ground slabs.



Main Product Features:

1. Powerful machine adopts DERTZ diesel engine (made in China). 
2. Import generator is optional. 
3. The high quality hydraulic valves and oil pump use Germen KAWASAKI products. 
4. The valve for change-over from high pressure to lower pressure is designed to be easily controlled, which can adjust the condition of the pump easily in accordance with the requirement of job site. Dismantle the tube is not necessary so that it can avoid the pollution.



Product Specifications:

Parameter/ unit

HBT50    

Max theory Output(m3/h)

55

Max Pumping   Pressure(MPa)

10

Hydraulic system type

Open

Power mode

Diesel engine

Speed(r/min)

1800

Power(kw)

86

Valve type

S

Diameter of oil cylinder(mm)

180


High- lowe pressure switching

Yes

Hydraulic oil tank capacity(L)

115

Hopper capacity(m3)

0.4

Hopper jeight(mm)

1320

Total mass(kg)

4500

Dimension: L*W*H(mm)

5400/1860/1900


Our Advantages:

1.Training Solutions – we develop our people through high impact training. We increase the connective intelligence potential of individuals and teams through practical, solution-focused programs in areas such as innovation, team collaboration, management development, strategic thinking and decision making.


2. Coaching Solutions - we increase leadership potential with performance coaching. We increase the connective intelligence potential of our managers and key contributors,    assessing and developing both their cognitive and emotional intelligence's (capabilities) as the latest research, and practical experience, indicates that both are needed to drive sustained performance.


3. Reward Solutions – We reward our deserving people based on performance (we ensure equitable treatment of employees because appraisals are based on result of performance) by providing the necessary incentives. Its components can be a combination of bonuses, a range of appropriate benefits such as International trips, commissions and Stock option incentive plan for management & senior workers.



FAQ:

Q1: How do we guarantee the quality of our products?

A1: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.


Q2: How soon can we receive the product after purchase?

A2: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 30 to 60 workdays.


Q3: If we can produce some Trailer Pump according to customers request?

A3: Yes, we can produce Trailer Pump according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.


Q4: How to make a quick resolution for after service?

A4: OKorder and our manufacture both have overseas branches all-around of world, if necessary, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.


Concrete Pump Trailer Pump Diesel Engine HBTS45

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to cooperate with concrete mixers and concrete pump trucks
Concrete mixer is to pull the concrete, the pump is playing concrete, the mixer to pull the material to the site
Q:What is the meaning of cast - in - place concrete secondary grouting?
Recycled concrete secondary grouting refers to the concrete pouring after solidification; with grouting equipment will be designed slurry (usually cement slurry, water, highway for a certain ratio of cement, sand) into the concrete due to solidification and shrink
Q:What is the difference between a concrete pump and a concrete pump
The parameters of the main pump are used to determine the speed and transport height of the pump. The horizontal distance is determined by the length of the cloth rod. It is suitable for pouring concrete in fixed mode and can ensure the uniformity of concrete and increase the compactness.
Q:What is the depreciation period for concrete and concrete carriers and how much net residual value is
The depreciation period for concrete and concrete carriers is 4 years and the net residual value is 2%.
Q:Why does the concrete pump main cylinder check valve damage cause the cylinder stroke to be short and the pumping is weak?
The main cylinder discharge, long run will lead to shorter travel, when the main cylinder of the smaller volume, through the pressure (closed off the valve) can also be achieved by the preset pressure, it can not be pressed to determine whether the master cylinder seal damage;
Q:What is the difference between a concrete pump and a valve?
pump and diesel and two major series, to be specific according to your actual situation
Q:What is the lubrication of the concrete pump before it is transported to the concrete?
Concrete pump to transport concrete before the pipeline lubrication
Q:What are the precautions for the operation of the concrete pump truck?
The minimum amount of cement in the pumped concrete is 300 kg / m3.Pumping concrete sand content should be 38% to 45%.
Q:What are the standards for the use of concrete pumps?
The operator (the pump of the concrete pump) shall record the operation of the concrete pump as required.
Q:What is the maintenance method of concrete pump?
Vertical pipe should be no less than 10m with a check valve of the horizontal tube, is strictly prohibited vertical tube directly connected to the concrete pump output.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range