Concrete Pump Reducer Reducing pipe from DN150 to DN 125 Length 1330mm 1600mm

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
5 pc
Supply Capability:
5000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications

Concrete Pump Reducer
Specialized manufacturer
High wear-resisting,high security and highly pressurized
Timely delivery

Technical date:

 

Name

Concrete Pump Reducer

Size

6-5 x 1600              4-3 x 1200           3-2.5 x 28''

6-5 x 1200              4-3 x 900            2.5-2 x 36''

6-5 x 900               4-3 x 500            2.5-2 x 28''

6-5 x 600               3-2 x 1200           4-3.5 x 12''

5-4 x 1200              3-2 x 900            4-2.5 x 36''

5-4 x 900               3-2 x 600            4-2 x 36''

5-4 x 600               3-2.5 x 36''           2-1.5 x 12''

Other sizes and types upon customers requirement

Material

Harden and non-harden, or according to clients requirement

Technical

Frequence heated

Application

Used in Concrete pump outlet in Construction work

Serving brands

Schwing, PM, CIFA , Kyokuto, Sany, Zoomlion, and so on

  

Our product range is as follows;

1. pipe line(wear-resistant seamless or welded tube)

 

material:45Mn2,high quality alloy steel pipe,st52,20#steel,etc

 

size:DN 125mm or DN 150mm

 

Wall thickness:4.1-7.1mm

 

length:3meters is standard length,other length as to your requirement. 

 

 

2. elbow/bend and reducer elbow 

 

material:Hi-Mn13,20#steel,st52,etc

 

size:DN 125mm or DN 150mm (R275,R225,R315,etc)

 

degree:90, 60,45,30,15 

 

 

3. concrete pump coupling/clamp

 

material:Hi-Mn13,20#steel,etc

 

size:from 2 to 6inch,DN125mm and  DN 150mm is the common size,other sizes like DN80,DN100,DN175 are  upon to your request  

 

 

4. Reducer

 

  Material:45Mn2,st52

 

  Length:1.2M,1.6m,all size as to your request 

 

 

5. sponge cleaning ball

 

  Material:natural rubber

 

  Size:DN100,DN125,DN150,according to your request 

 

 

6. rubber items( adopt natural rubber)

 

  rubber hose:DN 125mm and DN 150mm ,3 or 4 meters,other sizes upon your request

 

  rubber piston/gasket:DN 125mm and DN 150mm,DN180,fitting to schwing,PM,etc

 

  rubber sponge balls:for all kinds of concrete pump pipefittings 

 

 

7. wear plate and cutting ring 

 

  Fitting to schwing,PM,SANY,Zoomlion,etc

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do the welding parts in the welding drawings of the machine parts indicate the technical requirements of the drawings?
The whole circle of the triangle is welded as an angle weld, and the other is the outer circle with the same diameter as the two, so the butt joint is better to open the groove. Welding, for V type welding seam, and, technical requirements are generally, welding firm, no defects, welding smooth grinding, cleaning welding slag splash
Q:What are the mixing arms of the concrete mixer?
Mixing arm concrete mixer is a component of the mixing arm itself and divided into lateral mixing arm (positive and negative points), stirring arm (also have positive and negative points), stirring arm below is the bearing seat connected, connected with 4 sets of high strength bolts with stirring arm. The top is equipped with wear-resistant mixing blades, connecting with mixing blades, high-strength bolts 2 sets. In addition, some manufacturers have designed mixing side bonded shaft swivel, is installed in the interval between the stirring arm fixed and rotated in two ways.
Q:What are the principles, performances and uses of the commonly used construction machinery equipment?
3. excavator principle: Excavator through the hydraulic pump to the power of the engine to hydraulic motors, hydraulic cylinders and other executive components, to promote the operation of the device, so as to complete all kinds of operations. Performance: new Isuzu engine, euro II emission, international standards, more into power for you, lower fuel consumption; with high torque rotary mechanism, improve the starting torque of rotary and rotary reducing drift; with a new high efficiency, low noise, large displacement of the main pump, provided high efficiency machine to deal with the bad working conditions; and to strengthen the work of device according to the quarry condition, increase its reliability; strengthen the lengthened crawler frame, while reducing the ground pressure, improve the performance of the fault diagnosis system; new, prolong the overhaul cycle, reduce maintenance cost. Use: 1) building and building foundation excavation; (2) mining soil, stripping mining field covering layer; (3) the quarry, tunnel, underground powerhouse and heap loading operation in the field of material; 4) excavation channel, canal and waterway dredging; (5) replacement of the devices can be pouring lifting and installation, piling, rammed earth etc..
Q:What is the use of spare parts prices in Chinese market by foreign companies?
You might be gathering information for him. You have no data for one person, if there are several people? They can analyze a lot of things through big data. You can't find out, you're OK. Once you find out, your whole life is over.
Q:What type of industry does the machinery and building accessories processing belong to?
There are only three tax categories in our country: 1 consumption tax, 2 VAT, 3 special tax (agriculture). Therefore, as long as the manufacturing or processing of industrial value added tax on enterprises. It has nothing to do with the economic nature, classification and categories of an enterprise.
Q:Building materials, equipment, components and fittings products must have "three certificates" is what cards?
Product quality certification, also known as product certification, internationally known as qualified certification. According to the 1991 implementation of the "people's Republic of China Quality Certification Management Regulations", the product quality certification is based on the product standard and relevant technical requirements, the certification institution confirmed by the certification and certification marks to prove that a particular product is in conformity with the relevant standards and technical requirements of the corresponding activities.
Q:How are buildings, installations and materials divided?
Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.
Q:What is a door rack for a construction site? How high is it generally?
Door scaffolding has not yet unified design and product standards, the products of different specifications, quality is inconsistent. Not only for construction units to use and management of great difficulties, is not conducive to the promotion of applications, but also to the construction safety risks. Therefore, it is necessary to organize and issue a unified standard for door scaffolding
Q:Construction Engineering, moving equipment and stationary equipment, respectively
2. Static equipment: reaction equipment (code R). Such as reactor, reaction kettle, decomposition pot, polymerizer, autoclave, converter, digester, steam ball, sulfonation pot, gas producer and so on. Heat exchange equipment (code H). Such as tubular waste heat boiler, heat exchanger, evaporator, condenser, cooler, heater, sterilization pot, water jacket, etc. for dyeing dryer, steamer, cooker, gas preheating. Separation equipment (code S)
Q:Construction machinery production need to deal with what documents?
Construction machinery production needs for documents are: first, the construction enterprise safety production license application form 1, form three copies; 2, fill in the application form for details of the "instructions" application form "; 3, the legal representative of the enterprise statement" column should be the legal representative signature, enterprise official seal;

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range