Concrete Pump Parts 45Mn2 Delivery Boom Pipe

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20 pc
Supply Capability:
2000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Concrete Pump Parts 45Mn2 Delivery Boom Pipe


1.   Concrete Pump Parts 45Mn2 Delivery Boom Pipe:

 

St52 Weld Pipe: Main use for Trailer-mounted pump, thickness has 4.0mm, 4.5mm, 5mm. Compare with for Truck-mounted pump. Weld pipe has cheaper price, so it is popular in Saudi, Pakistan, India, etc. Unit Price is about 30USD-33USD.

 

St52 Seamless Pipe: Now More People like use this kind for Truck Pump and Trailer Pump because of the quality is better and it is seamless kind, so this kind pipe is most popular in Middle East Price About 34USD-37USD.

 

Wear Resistant Pipe: Use for Truck Pump, Wear Resistant Layer is 2.5mm.Through heat treatment way make this pipe more strong (HRC60-62), Using Life: 25,000m³-35,000m³ Price about 65USD-68USD.

 

Two Wall Pipe: This pipe thickness (2mm+2.5mm), Using Life about 50,000m³-60,000m³

 

 2.   Main Features of Concrete Pump Parts 45Mn2 Delivery Boom Pipe:

 

• High Wear-resistant, long service life, lower cost

• In case of quality problem the company provide free replacement.

• Our company passed the ISO9000 certification, the product through 3C certification in full compliance with national standards

 

3.  Concrete Pump Parts 45Mn2 Delivery Boom Pipe Images:

 

Concrete Pump Parts 45Mn2 Delivery Boom Pipe

Concrete Pump Parts 45Mn2 Delivery Boom Pipe

Concrete Pump Parts 45Mn2 Delivery Boom Pipe


4.  Concrete Pump Parts 45Mn2 Delivery Boom Pipe Specification:

 

Name

Data

Material

45MN2/20#/16MN/Q345

Thickness

According to customer requirements

Color

red, white , etc.

Using life

20.000m³-80.000m³

Weight

43kg,48kg,69kg

Length

1-6m,  according to customer requirements

Model

DN125,DN150

Flange

SK/ ZX /FM flange

Painting

Electrostatic Spraying Epoxy Paint

Welding

Smooth welding between straight pipes and flanges

Process

High temperature quenching

HRC

65

 

 

5. FAQ:

 

We have organized several common questions for our clients, may help you sincerely:

①Is your products exported a lot?

We have exported to many, many countries. Every year we ship more than 30 containers of these spare parts. Our main market is in Middle-east, Asia & Africa.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

③How long can we receive the product after purchase?

In the purchase of product within three working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 15 working days can be served.

 

6. Why choose us:

 

•  We are a comprehensive manufacturing and trading company.

•  We are famous for our superior quality, competitive prices, first-class craftworks, safe package and prompt delivery.

•  We have been supplying concrete pump parts for SCHWING, PUTZMEISTER, SANY, CIFA, KYOKUTO, ZOOMLION for 10 years, so we can promise you the quality and best price.

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Are there any standards or specifications for the design of parts list in mechanical design?
Each company's specifications are not the same, but the general processing parts must have part name, parts drawing number, quantity, material / heat treatment methods (surface treatment methods), remarks, etc.. If purchased, it includes name, model, brand, requirement, remark and so on
Q:I am engaged in the mechanical design work, asks the three-dimensional mechanical component model to download the website.
To Cadenas partcommunity download, under their own Baidu search, there are hundreds of manufacturers above the product model, the standard parts of all countries, free of charge, just register. Choose the format you want. The format is common.
Q:Mechanical design is to draw the general plan or draw a part diagram first?
First draw a diagram, determine the location of each part, then draw the parts drawing, and finally the general drawing
Q:Mechanical design, manufacture and automation, 60
The interests of postgraduate exams in the machinery industry are not very greatTo PubMed, it is best to change the professionI graduated from mechanical design,I graduated from graduate school for 1 years. I graduated four years agoTheir wages are not as high as mineThe reason is simple1, the machinery industry, experience is more important, more than three years of experience is often more important than academic qualifications2, starting point and pressure pointThe current stall in the machinery industry is undergraduate 3K, salary 3 years of 6K, 10 years is less than 10KGraduate 4K, work within 10 years is less than 10KThe starting point is a little different, one is higher than a high 1K, but you have to consider people of the same ageWhen you graduate with three years of work experience, the study pays less than your peers, but after years of work, the salary is basically the same
Q:How to design the power assisted robot, mechanical structure and pneumatic part, please point out, thank you!
Professional production, you can go to understand, draw on for reference
Q:What is the principle of selecting materials for machine parts in mechanical design?
Cost considerations should be taken into account in mechanical design. If the material used in the design is too good, resulting in the overall cost is too high, it will make the loss of enterprises. The 45 steel is a slightly higher quality carbon structural steel, only in some major components or shaft parts only use 45 steel, and more use of lower strength Q235 and other carbon structural steel.
Q:Mechanical manufacturing technology.
Learn tyrants thing in the community are not practical, in the factory to consider a lot of factors, not necessarily good! Encouraging a pa! Or go to the society to study well!
Q:Does the SolidWorks mechanical design engineer paint parts individually or draw parts in an assembly?
There are two ways, corresponding to "bottom up" and "top down" two design methods.
Q:Mechanical design, hardness of the workpiece, how to determine, for example, in the drawings, technical requirements of the hardness value how to get?
If you are engaged in a kind of graduation design, go to the library and borrow some of the heavy tools for your design manual, mechanical, can get the corresponding information in the manual, manual information can be used as the basis,
Q:At the time of mechanical design.
The drawing code is the design code. For example, abc-00.00.01, abc-00.00.02, etc., the company should have the principle of numbering and compiling according to the drawing code in the assembly drawing.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range