Concrete Pump Good Quality 37m Truck-Mounted

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Concrete Pump  Good Quality 37m Truck-Mounted

Product Details

Basic Info.

Model NO.:37m

 

Type:Concrete Pump

Machining Process:Hydraulic

 

Certification:ISO9001: 2000, CE

Condition:New

 

Boom Reach Height:34m

Chassis:HOWO

 

Emission Standard:Euro III,Euro IV

Export Markets:Global

Additional Info.

Trademark:Hongda Tielishi

 

Packing:Nake

Standard:CE, CCC

 

Origin:China

HS Code:870590909

 

Production Capacity:50

Product Description


37m concrete pump with boom –HD5291THB-37/4UnitParameter
Main Technical Parameters in
Service
Theoretical Pumping Capacitym3/h150
Theoretical Pumping PressureMpa8.5
Hopper CapacityL700
Feeding Heightmm1370
Distributing Valve Form
S-pipe valve
Max. Distributing Radiusm33.2
Max. Distributing Heightm37.2
Max. Distributing Depthm24.3
Height of Distributing Boom When Stretchedmm8450
Distance between Front Landing Legsmm6507
Distance between Rear Landing Legsmm6600
Distance between Front and Rear Landing Legsmm7179
Diameter of Conveying Pipemm125
Length of Tail Hosem4
RotaryRangeof Distributing Boom
365°
Number of Boom Sections
4
Rotary Angle of Each Boom Section°92/180180//270
Remote-control Distancem200
Main Technical Parameters in
Traveling Condition
Max. Traveling Speedkm/h90
Min. Turning Radiusmm8800
Brake Distancem7
Approach Angle°16
Departure Angle°11
Chassis Model
 ZZ5307N4647C
Wheel Base between the First and the Second Axlemm4600
Wheel Base between the Second and the Third Axlemm 1350
Front Treadmm 2022
Rear Treadmm1830
Max. Engine Powerkw247, 2200r/min)
Max Engine Torquen.m1350(1100-1600r/min)
Max. Grade Ability%35
Fuel Consumption LimitL/100km34
Overall Dimension (L ×W× H)mm12000×2490×3850
Full-load Total Weightkg29000

Concrete Pump  Good Quality 37m Truck-Mounted

Concrete Pump  Good Quality 37m Truck-Mounted


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the difference between concrete conveyors and concrete conveyors?
The concrete pump is a special machine for conveying concrete. It is equipped with special pipes to transport concrete along the pipeline to the pouring site.
Q:What is the wall thickness of the concrete pump 125?
Another kind of pump body is installed in the car chassis, and then equipped with retractable or inflected cloth rod, and the composition of the pump.
Q:How much concrete pump power
Combining ready-mix concrete production with pump construction, the use of concrete mixing truck for intermediate operation, can achieve continuous pumping and pouring concrete.
Q:What is the cause of concrete pump blockage?
When the above two methods can not rule out the plug, the concrete pump can be removed after the removal of the plugging parts of the pipe, discharge concrete blockage, and then take over the pump.
Q:What is the pumpability of concrete
Under certain pump pressure, the farther or higher the concrete can deliver, the lower the chance of blocking, the better the pumpability of the concrete.
Q:How to achieve the concrete pump pendulum for the change?
Such as the German Shi Weiyin pump is the case, of course, it is given to the hydraulic pilot oil is not an electrical signal.
Q:What are the types of common concrete pumps?
The pump body installed in the car chassis, and then equipped with retractable or inflected cloth rod, the composition of the pump.
Q:90KW concrete pump should be used in the number of generators?
To normal long running 90KW concrete pump, 150KW generator is not enough, because the device to start the current
Q:How to prevent concrete pump blockage
Concrete or mortar segregation: wet water pipes before the pump, from the lowest point of the pipe pipe joints will be released, the remaining water will be let go, or pump water, pump mortar before, put a sponge ball, the mortar and water separated.
Q:When the concrete pump in the transport of concrete before the pipeline should be what lubrication
And then share a coup, tanker to a lot of time, the site to prepare some sugar, if the pouring time is too long, the general 9 square tank you put 1 kg of sugar can be used as a retarder

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range