CONCRETE DELIVERY ELBOW PM TYPE 90DEG R275 DN125 WITH EXT.110MM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

concrete pump elbow table

 


Wear-resistant Single or Double Concrete Pump Elbow

Type 

Singe Elbow 

Double Elbow 

Model

DN125

DN150

DN175

DN125

Material

Casting Steel ,ST52

Inside 

 40Cr

Outside 

Size

R275*90°

R275*90°+110

36°

F2000

R275*90°

R275*90°+110

R275*45°

R275*90°+211

R400*30°

A3000

R275*45°

R275*90°+211

R275*25°

R275*90°+411

R400*45°

471B

R275*25°

R275*90°+411

R275*20°

R275*90°+424

R400*30°

571B

R275*20°

R275*90°+424

R275*15°

R275*45°+170

R488*90°

A1000

R275*15°

R275*45°+170

R180*90°

R275*45°+310

R500*90

C1000

R180*90°

R275*45°+310

R232*60°

R275*45°+310

R280*90°

B2000

R232*60°

R275*45°+310

R240*36°

20°Lengthen 



R240*36°

20°Lengthen 

R240*30°

25°+740



R240*30°

25°+740

R240*15°

40°Zoomlion



R240*15°

40°Zoomlion

R385*29°




R385*29°


R315*33°




R315*33°


Technic

Forged


Average life

25,000cubic

50,000cubic

Appliciation

Used in concrete transport in construction work



1.product profile:The double layer concrete pump elbow is developed by ourselves through new

technology and process.


2.characteristic:the inner layer of this concrete pump elbow undergoes heat treatment,and then the rigitiry can reach 62-65HRC.


3.characteristic:the outer layer of the concrete pump elbow possess good toughness properties

to protect the inner layer,so the security of the elbow is improved. 


4.life:the experiment done abroad shows that the life of our concrete pump elbow can reach 35000-50000cbm,got the customers' praise


5.Beside the double layer concrete pump elbow,we produce all kinds of concrete pump parts,

straight pipe hose flange coupling and so on. 



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to operate the concrete pump?
Pumping equipment parking brake and lock brake should be used at the same time, the tire should be wedge tight, water supply should be normal, and the tank should be filled with clean water, the hopper should be no debris, the lubrication points should be lubricated properly
Q:What do these types of concrete pumps mean?
HBT represents the ground pump (tow pump). 80 represents the theoretical throughput per hour, and 16 is the maximum outlet pressure of 16 MPa
Q:How to deal with the blockage in the outlet of the distributing valve of the concrete pump?
Pour the grout into the hopper, turn the pump in and out again and again, forcing the passage to open
Q:How to diagnose the blockage in the inlet of concrete pump?
The feed port is blocked and the pump operation and hydraulic system are normal, with no abnormal sound and vibration. The hopper has larger aggregate or agglomerates and is stuck or arched at the feed port
Q:What are the types, classifications and specifications of concrete pump?
According to the maximum hourly transport rate, there are 20-100m3 range, and most of the concrete pump can achieve two variable displacement or stepless variable
Q:What are the precautions for gas washing of concrete pump?
During gas cleaning, the personnel shall not be close to the outlet of the discharge pipe, the pipe is turned sharply (if 90 bends) and the compressed air pipe is connected
Q:What are the specifications for concrete delivery pumps?
In the hot season construction, concrete pump to prevent the oil temperature is too high. When the temperature reaches 70 degrees, stop running or take other measures to cool down;
Q:How does the concrete pump work?
After position, the pump shall show stop light to avoid collision
Q:What are the types of concrete pumps?
According to the power type is divided into electric concrete pump and diesel power concrete pump
Q:What are the causes of pipe blockage in concrete pump?
Therefore, in the JGJ/T10-95 "concrete pumping construction technical regulations," stipulated that the sand through the 0.315mm sieve shall not be less than 15%.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range