• Concrete Cutter GQR400-A System 1
  • Concrete Cutter GQR400-A System 2
  • Concrete Cutter GQR400-A System 3
Concrete Cutter GQR400-A

Concrete Cutter GQR400-A

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

Used for compacting the gravel,soil, asphalt roads, sidewalks, Bridges, car parks, sports venues and the narrow site compaction work. It’s an ideal equipment for highway, municipal departments to build roads, streets, squares.

Easy operation, flexible steering and good welt performance, good shock absorption performance.


Main Product Features:

1. Super-rigid box frame ensures straight cuts while resisting warping and vibration-prolongs saw life, extends blade life

2. Good quality shaft bearings for long service life;

3. Height adjustable handle with comfortable girp handles;

4. Easy crank for raising/lowing cutting depth;

5. Easy remove, never rust plastic water tank provides an flow and volume of water to the blade;

6. Hinged front, lift-up blade guard is designed to provide easy blade replacment;

7. Trottle control as standard part.


Product Specifications:

Model: GQR400-A

Engine Type: Petrol. Honda GX 390

Power: 13HP

Cutting Depth: 160mm

Cutting Speed: 1-3m/min

Width of Cutting Slot: 2-6mm

Water Tank: 40L

Weight: 125KG



FAQ:

Q1: Does the Concrete Cutter use electricity or diesel?

A1: The Concrete Cutter is equipped with famous brand diesel engine.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 20 workdays.

Q4: If we can produce some Concrete Cutter according to customers request?

A4: Yes, we can produce Concrete Cutter according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.





Concrete Cutter GQR400-A

Concrete Cutter GQR400-A

Concrete Cutter GQR400-A





Q:Why should we use the rubber tyred roller in the construction of the asphalt pavement?
At present, the latter two are widely used in construction.The following is a steel wheel roller, which is in front of the paver. The following table shows two rubber tyred rollers. Roller's purpose: 1. to achieve the required density (usually controlled by compaction); 2. press out the smooth surface.General compaction includes initial pressure, re pressure and final pressure. The final pressure is to remove the traces of rollers, the road is kept smooth, generally can not be omitted, and the use of steel wheel roller. If the initial pressure can meet the density requirements, there is no need to re pressure, but generally still maintain these three steps.
Q:Small roller, that house is of good quality
You can come over here and look at the factory and look at some of them. There are many kinds of mini rollers, and what's different is different
Q:What are the classification methods of vibratory rollers?
Double steel roller drive is divided into two driving double vibration, double drive single vibration (walking drive, vibration compaction)There may be other, too. This is a more conventional classification.
Q:Roller roller do large objective
Only two can press the road more tightly, so as to achieve a certain degree of compaction, width is to work efficiency, the greater the area of contact, the pressure will rise faster.
Q:What's in the roller in front of the roller?
Inside is a set of eccentric mechanisms that vibrate by eccentric rotation with frequencies between 25-50HZ.
Q:What's the difference between the German BMW roller and the German BMW? Which is better? Thank you for your advice
BMW is roller imported from the German company BMW; BMW case is the German BMW company in Shanghai China company, BMW roller assembly, in order to distinguish the two different names, the price is also different; BMW Dalian canal Yici engine, some structure also is domestic production; there are great differences between BMW and Germany the quality of! Currently the best brand roller is Sweden Dynapac produced Dynapac roller!
Q:How many tons of rollers are needed for highway engineering?
22 tons. SSR200AC-8 31 roller double amplitude vibration, vibration force, improve the efficiency of 16.7%. The front and rear direction change is simple and convenient, the compacting road surface is smooth, without starting impact and without starting indentation. Large displacement vibration motor with vibration starting time of only 3 seconds.
Q:The rollers are divided into several types
The routine use: single steel wheel used in roadbed, double steel wheel and rubber wheel. But according to the construction in the oil surface different processes and materials, double steel wheel and the rubber wheel will be used in the roadbed.
Q:What is static roller mill and what's the difference between vibratory roller and vibratory roller?
It's the wrong place. The roller compactor is just compacting the road through the weight of the roller.
Q:When the new high-speed road roller is used to press the road surface, it will cause cracks in the surrounding houses. What are the criteria for compensation? How many meters away from the subgrade is the range of compensation?
In this case, the local government can be reflected in the situation, and for the corresponding losses caused by residents, or compensation. The general compensation is calculated according to the area of the residents.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords