• Compound Metal Air-Conditioning Outlet From Factory System 1
  • Compound Metal Air-Conditioning Outlet From Factory System 2
  • Compound Metal Air-Conditioning Outlet From Factory System 3
  • Compound Metal Air-Conditioning Outlet From Factory System 4
Compound Metal Air-Conditioning Outlet From Factory

Compound Metal Air-Conditioning Outlet From Factory

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50000 pc
Supply Capability:
100000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

description:

  • Frame: High quality extruded aluminum alloy(A6063) profile with 30mm flange as standard.

  • Blades: Aerofoil blades in 45° from aluminum profile

  • Blades spacing: 25mm as standard

  • Support pipe: 8mm diameter aluminum pipe

  • Round shape

feature:

  • The frame & blades are high quality extruded aluminum profiled construction with advantages of corrosion resistance and rigidity.

  • The blades is fixed to the frame by rivets and support pipe, which assure the quite, smooth and rattle free operation.

  • Blades are set at angle of 45° with 25mm spacing, and fixed to the frame.

specification:

  • Any size available

  • Overall face size = Neck size + 55mm

Item

Neck size (mm)

Face size (mm)

SG-LR-100

D100

D160

SG-LR-150

D150

D210

SG-LR-200

D200

D260

SG-LR-250

D250

D310

SG-LR-300

D300

D360

SG-LR-350

D350

D410

SG-LR-400

D400

D460

Compound Metal Air-Conditioning Outlet From Factory

Compound Metal Air-Conditioning Outlet From Factory

Compound Metal Air-Conditioning Outlet From Factory

Compound Metal Air-Conditioning Outlet From Factory


Q:I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
Common points are all sandwich panels, with a hard protective layer, the difference is the middle of the different materials, such as polystyrene board, polyurethane board. Polystyrene board which is the most common, because the price is cheap, easy to use so the use of more, but if the temperature is more than the requirements of the chicken inertia glycosylation moxibustion slim faint words, polystyrene board is not satisfied , So there is a polyurethane sandwich panels, polyurethane thermal conductivity of less than 0.. in the existing insulation materials, large quantities of processing, be the best. But because of its process is more complex, and the cost is relatively high, so with less, the common combination of cold storage and the like, I believe that with the economic and technological development, polyurethane sandwich board market share will be more and more High
Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
Q:In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
Normal heat absorption is also due to poor ventilation (dirty) and air humidity so icing
Q:Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
Q:Air conditioning ventilation when the sound is a big reason
According to my specific circumstances, in the following seven major hazards include the division, sub-project focus on control
Q:Air conditioning machine work when the sound is too much reason
This is based on the density of benzene board decision, not what you said, know it buddy.
Q:External wall insulation method of operation There are several combinations of materials
Seeking the existing building construction specifications Daquan! The The @
Q:If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
After learning that feel boring, to diverted it, brush point repair it. Architectural design institute will need to design equipment (that is, plumbing) design talent, that is, will generally participate in architectural design, the wages should be
Q:What is the whole heat exchange fresh air ventilator?
(GJG130 - Fan Jutang Duanjie Daojie Juejiao 2001) will be replaced by (GJG130-2011) is expected to begin the implementation of the construction of this year, the construction of fastener steel scaffolding safety technical specifications (GJG130), the construction of fastening steel pipe scaffolding safety technical specifications (GJG130- -2011)
Q:Air to water heater host and air conditioning host is not the same
Issued a test report, Detection can be used to pass, failed to use!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords