commercial light steel and wood holiday house

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
20000㎡ m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

This product belongs to Steel and wood composite structure.

This structure is  developed by light steel structure and wooden envelope, connected and fixed by different metal connections and tenon joints method.

Advantages:

1. Flexible combination
2. Easy transportation
3. Fast construction
4. Cost saving
5. Removable & recycle

6. Thermal Insulation
7. Seismic and wind resistance
8. Roof Load-bearing

Packing:

light steel packing: light gauge steel in bulk, decorate panel material in pallet, other fittings all in boxes, loaded into 40' GP and 20' GP on container.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the differences between aluminum oxide curtain wall materials and oxidation doors and windows?
Popular terms: curtain wall aluminum alloy profiles and doors and windows aluminum alloy surface oxide film thickness is the same, but the strength used by different aluminum alloy thickness is not the same.
Q:What does the floor level mean?
1) Solid wood flooring ABC grade is called commercial terms, "solid wood flooring national standard" is divided into "excellent goods", "first class", "qualified"; A) "excellent" is equivalent to A ; B) "first-class goods" equivalent to B-class board; C) "qualified products" equivalent to C-class board. 2) E1, E0 level is the European countries based on the content of free formaldehyde in wood-based panels to divide, but also China's domestic industry in the production of artificial plate standards. A) E0 is: less than or equal to 0.5 mg / l of formaldehyde emission; B) E1 means: less than or equal to 9.0mg / 100g formaldehyde emission; C) E2 means: less than or equal to 30.0mg / 100g formaldehyde emission The E0 grade sheet is not only environmentally friendly and standard higher, but because it does not contain green moisture-proof agent and adhesive, its toughness and moisture resistance is relatively low, generally used as furniture substrate, and not suitable for use in the kitchen humid environment.
Q:How to remove the plastic film on ceramic tiles?
1) The plastic film can be teared off gradually by hand, wiped by steel wool gently or teared off after heated by air heater. 2) anti-fouling agent packaging film can be wiped by towel with white cement. 3) Wax packaging film can be wiped by dry towel, banana oil, or talcum powder with white cement.
Q:How would i make a bonfire on cement/concrete without scorching the ground and making it safe?
You would probably have to bring a couple dump truck loads of dirt and build up the dirt layer to about one foot thick and then have the fire on top of the dirt.
Q:can I change a bathroom faucet myself?
You can change it yourself. I will suggest buying a Basin Wrench. Getting to, and turning the nuts behind the sink is a pain. A basin wrench has a rod with a hinged head so you can reach up between the sink and wall to loosen or tighten the nuts. If the sink is marble, do not use plumbers putty on the faucet bottom as a seal. The putty and marble will react and stain the marble.
Q:OUTDOOR TRASH CAN CEMENTED INTO GROUND.?
Hello It depends on its location the 50's not all areas had proper drainage or water supplies so maybe a well for water supply or a soak away for drainage as regards removal if want to remove intact you will need to break up the surrounding cement best way to do this to avoid damage would be to hire or borrow a Kango style demolition Hammer SDS Plus, they are relatively light weight and with the high vibration impacting movement you are less likely to damage the stone artifact, once surrounding cement removed you can try levering up with some scaffold poles or set up an A frame over the top and use a block and tackle to lift out, if however you want to just break up and remove take a 14 lb sledge hammer to it and cement over. Good Luck Regards Alan
Q:cutting hardiebacker 1/2 cement board?
This Site Might Help You. RE: cutting hardiebacker 1/2 cement board? Can anyone suggest a good way to cut small pieces (i.e. 2-4) of Hardiebacker and make it break cleanly? I can't seem to get it to break off easily unless it's bigger piece... and I was told not to use a power tool (i.e. circular saw) as it would create a ton of dust, which...
Q:How does the plumbing towel rack bleed?
The top of the eye with the screws loose
Q:Outside the high-level windowsill board air conditioning board calculation of the building area?
Not count According to the "construction project construction area calculation specification" 3.0.24 The following items should not be calculated Area: 1 building access (arcade, the ground floor of the street). 2 equipment within the building pipe sandwich. 3 Building separated by a single room, the stage and the background hanging curtains, set the flyover, pick Taiwan and so on. 4 roof water tank, flower rack, arbor, terrace, open air swimming pool.
Q:Plastic door switch door when the door is getting bigger and bigger how to do?
This is the plastic door of the disease, because the weight of the door with the hinge of the poor quality, resulting in hinge damage, change the page to solve.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Premium Related Products