COKE BREEZE of 3 to 6 MM

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Our company began to export coke when China cancelled 40% of coke export tariffsand quotas on January 1, 2013.

We export many kinds of coke, such as metallurgicalcoke (met coke) of 30-80mm, the NUT coke of 10 to 30 mm, coke breeze of 3 to 6 mm,and so on.

Parameters

Ash(DB)

Moisture

(ARB)

Volatile Matter

(DB)

Fix Carbon

(DB)

Size 3-6mm

+6mm

-3mm

Guarantee

12.5%max

15%max

1.5%max

83%min

90%min

5%max

5%max

Atpresent, the main customers are NOBLE GROUP, IMR and so on. Our main overseasmarkets are Japan, India, Brazil, Iran, Vietnam, and so on.

Shouldany of these items be of interest to you, please let us know. We will behappy to give you a quotation upon receipt of your detailed requirements.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Coke boiler belongs to coal-fired boiler
In addition, the utility model is characterized in that the utility model is used for heating and catering industry. Generally speaking, coke boiler belongs to coal fired boiler. Reason is that coke is a coal and fat coal for coke production.
Q:What is the difference between coking plant and coke plant
Production equipment and production processes are complex.Coke plant, generally only the coal into coke on it, so simple.
Q:Who knows the proportion of pig iron and coke used in Cupola
There is doubt: the export rate is lower than the standard exception.4, blank blank processing: according to customer requirements of different direct sales, some need to continue processing after the sale, the ordinary rough machined after a blank rate of about more than 70%, about 30% (excluding scrap scrap), dryer enterprises after after machining yield is about 25% ~ 30% (including waste scrap and iron, basically use recycled material, material waste accounted for ratio of 30% ~ 40%). To 1.5M x 2M cylinder, for example, rough weight of about 5.8 tons ~ ~ 6 tons (standard cylinder, including the cylinder head) cylinder head rough weight of about 1.7 tons ~ ~ 1.8 tons, cylinder weight of about about 4.2 tons. After processing, the cylinder head weighs about 0.5 tons to 0.6 tons, accounting for the proportion of about 65% to 70% head (excluding scrap, scrap accounted for about 10%, blank cylinder head and iron) accounted for about 30% ~ 35% blank cylinder head, accounted for the proportion is about 40% recycled waste, scrap iron accounted for under foot material proportion 60%, enterprises can not return direct sales (currently, only production enterprises can use recycled scrap iron). Total iron blank ratio is about 15% ~ 18%.
Q:What is the essential difference between coal and coke?
[coal]Coal is a kind of solid combustible mineral which is buried in the underground plants and has been formed by the complex biochemical and physicochemical changes. Coal is a kind of solid combustible organic rock, which is mainly formed by the chemical reaction of the remains of plants.
Q:Coke belongs to the coal industry
11 other mining industry 28 chemical fiber manufacturing 58 warehousing industryC manufacturing 29 rubber products 59 postal industry13 agricultural and sideline products processing industry 30 plastic products G information transmission, computer services and software industry31 grain grinding of non metallic products 60 telecommunications and other information transmission services 13101320 feed 311 cement, lime and gypsum manufacturing 601 Telecommunications133 vegetable oil 312 cement and gypsum products manufacturing 6020 Internet information1340 sugar 313 brick, stone and other building materials 603 broadcast television transmission135 slaughter and meat 314 glass and glass products 604 satellite transmission136 aquatic products 315 ceramic products 61 computer services
Q:Effect of coke powder ratio on the index
Evaluation of coke quality1, coke: sulfur sulfur is a harmful impurity, pig iron smelting, which makes it one of the iron quality. In steel and iron sulfur content greater than 0.07%, is a waste. From the 11% blast furnace of sulfur ore; 3.5% limestone; 82.5% from coke, so coke is the main source of sulfur. The charge directly affects the coke into blast furnace of sulfur when the sulfur content of coke production. For more than 1.6%, 0.1% sulfur, each additional 1.8%, increase the amount of coke, an increase of 3.7%, ore blast volume added limestone to reduce the yield by 0.3%, sulfur content of 1.5 - 2% metallurgical coke requirements do not exceed 1% 0.7%., the sulfur content of metallurgical coke is less than - 0.4 large and medium sized blast furnace
Q:Why does Coke provide heat during ironmaking?
Generate CO2;Of course, high temperature will produce CO, but not many;Please ask questions
Q:What is the main purpose of the use of coke
(3) column frame.The density of coke in blast furnace burden is the smallest, and the coke volume accounts for 35% ~ ~ ~ of the total volume of blast furnace burden. Coke is relatively strong, and in the tuyere area has always been to maintain the block, so it is the skeleton of the blast furnace column, from the loose material column, to ensure that the column has a good gas permeability of the role of the furnace is an important factor.
Q:The difference between coal and coke
The production of coke products in general is mainly based on high temperature carbonization, and the carbonization temperature usually needs about 1000 degrees celsius. After years of development, the current large-scale coke furnace equipment and technology is relatively mature, have equipment to improve the yield so as to achieve large-scale production conditions, coke furnace built in recent years, each with a yield of about 500 thousand tons, the highest can be even more than 1 million tons / year, such as the recent launch of mine international coking plant two chamber coke oven 7.63 m, each with a yield of 1 million 100 thousand tons per year.
Q:Coke is how to make it? What is the use?
Improving the coal preparation process is the way to expand the coking coal source and improve the quality of coke. At present, most of the coking plants in China adopt the mixed grinding process. This process can not be treated according to the different hardness of coal, so it is only suitable for the coking coal with good caking property and uniform coal quality. A new coal preparation process has three kinds: single comminution process is various, coal crushing alone first, and then according to the provisions of the proportion, then mixing; the first group grinding process, hardness of similar kinds of coal, according to the proportion of each group, were sent to the respective crushing requirements the particle size, then mixing the crushing process; is crushed to a certain degree of coal sieving, the coarse grain group screened were crushed again, so that the coarse grain group cohesiveness, inert material with high content of ground fine, avoid good bonding facies excessive grinding components.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range