• CNC Gantry machining center Modle:GQ1500 System 1
  • CNC Gantry machining center Modle:GQ1500 System 2
CNC Gantry machining center Modle:GQ1500

CNC Gantry machining center Modle:GQ1500

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
Model No.GQ700GQ800GQ900GQ1300GQ1500
Travels cnc gantry type milling machine
X axis travel/mm11001300110013001600
Y axis travel/mm70080090013001500
Z axis travel/mm600600600600600
Spindle nose to worktable/mm150-750150-750150-750150-750150-750
Worktable
Table size(L*W)1100*7001300*8001000*8001300x13001500x1500
Max load on the table/kgs9001000100015001800
Spindle
Spindle speed/rpm160-8000
Spindle taper7/24 Taper BT50
Spindle motor/kw11/15
Feedrate
X,Y axis rapid traverse(M/min)20
Z axis rapid traverse(M/min)15
Max cutting feedrate(mm/min)10-10000
A.T.C
Toolmagazine capacity(opt)/pcsArm type 24
Max exterior tool diameter/mmφ150(80)
Max tool length/mm300
Max tool weight/kgs8
Tool change time/sec(T-T)4.5(Arm Tpye)
Motor
Z axis Spindle motor/kw7.5/11
X axis AC servo motor/kw3.5
Y Z axis AC Servo motor/kw3.5
ShieldFull cover
ColorStandard
Control systemFANUC-0i mate MD


Main machine configuration

 cnc gantry type 

milling machine

1.Control system: FANUC-0imate MD (full set)
3.axis servo motor: FANUC from Japan
2.Arm type A.T.C with 16 tools,
3.10000rpm high speed 7/24 Taper No.50Spindle
4.Spindle bearing
5.Crew type chip removal system
6.heat exchanger
7.heavy-load linear guide rails on X/Y axis
8.automacti lubrication system
9.work and alarm lamps
10. releasing tool device
11.coolant system
12.fully enclosed splash guard
13.rigid tapping
14.standard accessories

Main parts supplier

 cnc gantry type milling machine

1.controller: FANUC 0i mate MD from Japan
2.spindle motor: Fanuc from Japan
3. 3 axis servo motor: Fanuc AC servo motor from Japan
4. spindle bearing: NSK/FAG(P4 grade) from Japan
5. x/y/z axis bearing: NSK/FAG (P4 grade) from Japan
6.x/y/z ball screw: HIWIN(C3 grade) from China Taiwan
7.spindle unit: KENTURN from China Taiwan
8. A.T.C system: from China Taiwan
9.lubricator system: from Japan
10.heat exchanger: from China Taiwan
11.electrical components: from China Taiwan

 

Q:The school was like 3 months. And he says he has an offer to go to Alberta, Canada for 6 months and they'll pay him $140,000. Is this realistic, has anyone ever heard of people making that much money in 6 months?
UNLIKELY BUT POSSIBLE...MAYBE WORKING AT THE DEBEERS DIAMOND PITS...OF COURSE ONCE YOU ARE THERE YOU ARE THERE FOR THE WHOLE SIX MONTHS..THERE IS NOWHERE TO GO
Q:Capital resources include buildings and machinery. true or false?
True and false, depends on your business and what you need to perform business. If you have a farm your capital resources would be your barn, silo and thresher. These same resources would not be same for a trucker whose resources would be a truck, trucker log and fuel. It really depends on what you need to do business.
Q:High oil costs makes the consumers cry,....low oil prices makes the refineries cry too...who suffers most?
even the cars that use alternate fuel use oil how else are the parts gonna get lubricated? so it wont be that bad for them
Q:I want to start export machinery spares parts from India. I don't know how to start? I did some research sent some email to foreign company but nobody replied..?? Please guide me step by step process. 1. How to approach foreign traders/foreign importers?2. How do I market my company?3. What are the legal procedure to export from India?4. What is market position for exporting machinery spare parts from India?
ship it as an exotic food.
Q:Me and my friend installed a 64-bit OS on his 32-bit machinery that's bought in 2004 it's a athlon xp 2.8GHZ and 2.0GB ram and it works preety fine execpt that it's very slow at times and it's very incompatable. Can we actually do that becasue when we were installing it it just warned us that oyur processor is not 64-bit capable do still want to procced we clicked yes and it worked fine. honestly this is not a lie I am telling the truth.
It is possible, but why would you do it? They give you different Processer Architectures for a reason
Q:English is not my first language, and i looked into dictionaries, but it was not clear .. it has something to do with moving or transporting .. but i can't understand what is meant by it exactly ... help me native speakers of English!thanks :)
itinerary n., pl., -ies. 1.A route or proposed route of a journey. 2.An account or record of a journey. 3.A guidebook for travelers. adj. 1.Of or relating to a journey or route. 2.Traveling from place to place; itinerant.
Q:eps machinerywhat it is who know it?
i okorder
Q:Whats the biggest piece machinery you ever drove?
Semi truck pulling 3 - 53 foot trailers at one time
Q:How much do you think it will cost if you buy 157 of agricultural machinery? And i know there are many types so just share all the info! ;) Thanks
Given the over broad nature of the question, anywhere between US$157 and US$15,700,000 or more, It really depends on what you are buying; ratchets or combine harvesters.
Q:I'm assuming I'll need to remove the back fence. But I'm trying to determine whether I'll need to also remove a couple trees as well. Anyone have a rough idea of how much space pool machinery is going to need?
Depending on if there is access from a side street or something, many companies will actually remove the fence or block wall to save time and use larger equipment. However, you can dig a pool using a skidsteer loader. You will need at least 5-6 feet of clearance for a skid steer. A backhoe will need closer to 9-10 feet. It will probably be more cost efficient to lose and replant a tree, and maybe redo a fence as well. While you got the tree out, make sure you choose a tree that will be pool friendly. A good euipment operator and pool company will suggest the quickest way to get this done; time is money. The sooner they get done with your pool, the quicker they move on to the next job.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords