CNBM Tons of Potassium Sulfate(SOP) Project made in China
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tons of Potassium Sulfate Project
Process flow diagram (see table)
Forty thousand tons of potassium sulfate equipment list
No | Name | Specification | Quantity | Remark |
8、burning system | ||||
1 | combustor | GLQZ-I | 8 sets | According to the custom order conditions |
2 | blower | 9-19 5.6A wind pressure 7109Pa, blast capacity 3619M3/h | 4 sets | According to the custom order conditions |
Motor | 11KW | 4 sets | According to the custom order conditions | |
3 | Induced draft fan | Y8-24-8D | 4 sets | According to the custom order conditions |
Motor | 7.5KW | 4 sets | According to the custom order conditions | |
4 | Heat exchanger | Φ800×4000 | 4 sets | According to the drawing |
5 | flue gas chimney | DN300×18000 | 4 sets | Flue gas discharge |
9.Control system | ||||
1 | centralized control system | 4sets | ||
2 | main engine Start ark | 4sets | ||
10. wire and cable | ||||
11 carbon steel pipe valves | ||||
12. FRP, reinforced PP, PVC pipe valve | ||||
13. technology costs | ||||
14 Analysis of laboratory instruments and equipment | ||||
15 Absorb and washing tower frame | ||||
16 Spare parts | ||||
1 | Sulfuric acid pump | 2sets | ||
2 | With sulfuric acid pump mechanical seal | 10 pieces | ||
3 | Hydrochloric acid pump | FRP 2sets | ||
4 | With hydrochloric acid pump mechanical seal | 20 pieces | ||
5 | Hydrochloric acid pump bearing | 20 pieces |
4、 Sulfuric acid storage tank (carbon steel material) 200 m3 / set, 1 set (this equipment produced by the owner at the scene ) The expense assumed by the consumer, the supplier provide drawing.
5、Environmental protection index
No waste water, waste, radioactive substances and heavy metals pollutant emissions. Exhaust hydrogen chloride emissions in line with the GB16297-1996 "of air pollutants for integrated emission standard II period two types of standards: hydrogen chloride, the maximum allowable emission concentration: 100mg / m³, tissue concentration limit of 0.20mg / m³. The highest emission rate of 2.0kg / h (35 m exhaust Funnel);
6.The factory equipment arrangement(After Validate Contract)
7.Scope of supply for the third item of equipment in the list of all items, freight, packing charge is provided by you. Our company is responsible for providing the design of the main workshop reference, all equipment foundation design information, responsible for the manufacture of equipment and organize delivery, to send to the owner's site to guide installation, commissioning and drive; Responsible for training the operator for the owners; Equipment warranty period is one year, and long-term to provide after-sales service. Wages is provided by your company to send technicians , a round trip ticket, eat, live is provided by your company;
Pictures
Engineering case
No. | Case | Date |
1 | The project of SOP in Iran for 40,000 MTPA | In 2017 Year |
2 | The project of SOP granulation in Philippines for 10,000 MTPA | In 2015 Year |
3 | The project of SOP in Egypt for 100,000 MTPA | |
4 | The project of SOP in Egypt for 60,000 MTPA | |
5 | The project of SOP granulation in Egypt for 20,000 MTPA | |
6 | The project of SOP in Egypt for 20,000 MTPA | In 2013 Year |
7 | Technical consultant of Sop in Saudi for 20,000 MTPA | |
8 | Overhaul the furnace in Indonesia | In 2011 Year |
9 | The project of Calcium Chloride in Egypt for 30,000 MTPA | |
10 | The contractor of SOP in Philippines for 20,000MTPA | In 2008 Year |
11 | Overhaul the furnace in Indonesia | In 2007 Year |
12 | The contractor of SOP in Philippines for 10,000MTPA | In 2006 Year |
13 | The equipment supplier of SOP in Indonesia for 10,000MTPA | In 2004 Year |
14 | The contractor of SOP in Philippines for 10,000MTPA |
- Q:A recent study has shown that the most effective way for most firms to improve worker productivity is to increase expenditures on machinery and equipment.true?
- dunno babes
- Q:I'm vacationing in Hong Kong and would love to bring home Japanese snack machineries such as Taiyaki makers, Takoyaki makers, Dorayaki makers, etc. It would be so nice to know if Hong Kong has vendors for these products. Thanks a lot!
- Hi, there'e NO Japanese snack food machine in Hong Kong. This machines applies in Japan only. The reason the japanese has these machines is to reduce the crowd of puchasing food, save time, save manpower, for people who need to line up at the restaurant or a take out food. This is a smart way of doing doing business. It also save time for ordering your food. No cashier needed right? But who knows, someday most countries will follow this way. Thanks for asking. Arigato gozaimasu.
- Q:During 2010 a corporation purchased machinery costing $450,000. This is the only acquisitions of depreciable p?
- Sorry, but your question cuts off in mid-sentence and is hence unanswerable. You'll need to add more info in the 'Additional Details' area of your question screen if you desire an answer.
- Q:Do all hydraulic systems use oil? Or do only some? Please give a list. Thanks.
- If it's hydraulic, it uses oil of some kind, usually, and not surprisingly: hydraulic fluid.
- Q:All the chocolate recipes I've seen require some form of fancy machinery. Is there any way of making chocolate without them? Because I want to make chocolate but I don't want to buy anything expensive.
- Making okorder /
- Q:Examples being, Caterpillar bulldozers, skid steer loaders, front end loaders, steamrollers, etc.If so, what's the process of getting a license to do so?
- NO, you do not there are schools though that offer training as well as companies that provide on the job training. But there are not any licenses even for on the job trucks where you do not leave the job site.}{
- Q:Looking specifically for Farm Construction Machinery Industry's sales and net income for 2006, 2007, 2008, 2009, 2010. If you can access it through some paid research website or whatever I normally should have access to it because i'm a purdue student
- i do no longer think of there is any distinction between being efficient and consumptive. Oil won't final continuously, yet timber are renewable, and the genuine source of potential on the planet is the solar which we are only beginning to faucet. Oil particularly can get replaced as an potential source, and it could be. as quickly as a threat.
- Q:One flew over the cuckoos nest pg 41-77Characterize Pete Bancini with regards to the theme of Machinery. Please give examplesThanks!
- Bancini worked on the rail road for a long time he sees things in the world like a machine.
- Q:Location: USA - I get 120v on all 3 legs of 3 phase system but check 208v between any 2 legs. Can I step it up to 240v without a transformer? My machinery specifies 240v
- Most houses are supplied with only two of the three phases available in the USA. The circuit breaker box divides the two phases into two sets of 110 volts (each phase to ground) and also has circuit breakers for 220 volts (across the two phases) for clothes dryers and electric stoves, etc. Most factories are supplied with all three phases and certain motors can be connected (by licensed electricians) across all three phases to obtain 440 volts using a motor controller. Local codes and insurance requirements are two good reasons to hire a licensed electrician to safely connect the motor. A transformer may be required to obtain 220 volts and three phase current. Also check the name plate data to determine the required frequency (60 Hz) in the USA.
- Q:Is factory machinery repairs and maintenance a period or product cost?
- Repairs are when something breaks and are never period. Period maintenance is to keep repairs from happening.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
CNBM Tons of Potassium Sulfate(SOP) Project made in China
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords