CNBM Tons of Potassium Sulfate(SOP) Project Equipment
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tons of Potassium Sulfate Project
Economic and technical indexes:
⑤Site area:
main factory: about 2000m2
Storage tank area:about 300m2
warehouse:about 3000m2
⑥operator assignment:
workshop foreman 1person/team total 3
main operator 4person/team total 12
Viceoperator 2person/team total 6
Maintenance Worker 2person/team total 6
laboratory technician 1person/team Total 4 (monitor work days)
Acid-making worker 1person/team total 3
electrician 1person/team total 3
total: 43 persons
Process flow diagram (see table)
Forty thousand tons of potassium sulfate equipment list
No | Name | Specification | Quantity | Remark |
1. Material system | ||||
1 | Potassium chloride bucket | TD250 | 1 set | According to the custom order conditions |
2 | Potassium chloride scraping machine | MS20-35 | 1 set | According to the custom order conditions |
3 | Potassium chloride feed bin | ∅ 1700×2570 | 4 sets | According to the drawing |
4 | KCL Spiral feeder | 1400r/min | 4 sets | According to the custom order conditions |
Motor | 1.5KW | 4 sets | According to the custom order conditions | |
reductor | 1/43 | 4 sets | According to the custom order conditions | |
5 | H2SO4 elevated tank | ∅1020×1540 | 2 sets | According to the drawing |
6 | H2SO4 pump | IH50-32-125 | 4 sets | According to the custom order conditions |
Motor | 3KW 2880r/min | 4 sets | According to the custom order conditions | |
7 | H2SO4 flowmeter | LZB40F | 4 sets | According to the custom order conditions |
2. reaction system | ||||
1 | Furnace | ∅7230×4000 | 4 sets | combustion chamber, reaction chamber and flue |
Reactor bracket and the furnace plate | assort | 4 sets | According to the drawing | |
2 | Big gear / small gear | 4 sets | Mannheim furnace | |
spindle | Mannheim furnace | |||
Turn the rake arm | Mannheim furnace | |||
Tine/cases/ retaine | Mannheim furnace | |||
KCL charging machine/ charging machine sulfate | 4 sets of each | Mannheim furnace | ||
Bottom base | 4 sets | Mannheim furnace | ||
Furnace door/discharging mouth | 8 sets | Mannheim furnace | ||
Center tube, wind water cones | Mannheim furnace | |||
HCL Furnace door | 4 sets | Mannheim furnace | ||
3.Discharging System | ||||
1 | Cooling pusher | L6380×D1000 | 8sets | According to the drawing |
motor | 7.5KW | 8sets | According to the custom order conditions | |
reducer | JZQ400 | 8sets | According to the custom order conditions | |
Big gear and small gear | 8sets for each | According to the custom order conditions | ||
2 | Air seal screw conveyor | L1630×D200 | 8sets | According to the drawing |
motor | 1.5KW | 8sets | According to the custom order conditions | |
reducer | 8sets | According to the custom order conditions | ||
3 | belt conveyer | D400 | 1 set | According to the drawing |
motor | 4KW | 1 set | According to the custom order conditions | |
reduce | 1 set | According to the custom order conditions | ||
magnet | 1 set | According to the custom order conditions | ||
4 | Main motor | 15Kw | 4 sets | According to the custom order conditions |
5 | The main reducer | JYQ360 | 4 sets | According to the custom order conditions |
6 | oil pump motor | 4 sets | The main reducer | |
7 | Main motor, main reducer size belt pulley | 4 sets | According to the drawing | |
4.Crush and packing system | ||||
1 | Hoisting machine | TD250 | 1 set | According to the custom order conditions |
motor | 1 set | According to the custom order conditions | ||
reducer | 1 set | According to the custom order conditions | ||
2 | Rotary vibration sieve with motor | 1 set | According to the custom order conditions | |
3 | disintegrator | JF600 | 1 set | According to the custom order conditions |
motor | 1 set | According to the custom order conditions | ||
4 | Screw conveyor | Under the mill | 1 set | According to the drawing |
motor | 1 set | According to the custom order conditions | ||
reducer | 1 set | According to the custom order conditions | ||
5 | Bucket elevator | TD250 | 1 set | According to the custom order conditions |
motor | 1 set | According to the custom order conditions | ||
reducer | 1 set | According to the custom order conditions | ||
6 | Screw conveyor | D200×6613 | 1 set | According to the custom order conditions |
motor | 1 set | According to the custom order conditions | ||
reducer | 1 set | According to the custom order conditions | ||
7 | limestone powder feeder | ∅89×1400 | 1 set | According to the drawing |
motor | 1 set | According to the custom order conditions | ||
reducer | 1 set | According to the custom order conditions | ||
8 | finished products store | ∅ 2600×4700 | 2 sets | According to the drawing |
9 | Pelleting machine | DG450 2-2.5T/h | 1 set | According to the custom order conditions |
10 | Pulse bag dust removal machine | MC96 | 1 set | According to the custom order conditions |
distributor | 1 set | According to the custom order conditions | ||
Vibration motor | 1 set | According to the custom order conditions | ||
reducer | 1 set | According to the custom order conditions | ||
11 | dedusting fan | 4-72 | 1 set | According to the custom order conditions |
motor | 1 set | According to the custom order conditions | ||
compressors | 1 set | According to the custom order conditions | ||
5. Water system | ||||
1 | back water bucket | 600×1200×940 | 3 sets | According to the drawing |
2 | cooling tower | FRP GBNL3-350 | 1 set | According to the custom order conditions |
fan motor | 1 set | According to the custom order conditions | ||
water sprinkler | 1 set | According to the custom order conditions | ||
3 | cool water pump | 100m3/h | 4 sets | According to the custom order conditions |
4 | elevated water tank | FRP 40 m3 | 2 sets | According to the drawing |
5 | hot water pump | 100m3/h | 3 sets | According to the custom order conditions |
6 | water distribution device | 4 sets | According to the drawing | |
6.Hydrochloric acid absorption system | ||||
1 | gas chimney | FRP DN300×28000 | 2 sets | According to the drawing |
2 | scrubber | FRP Φ1600×10750 | 2 sets | According to the drawing One set of packing separator |
3 | first absorbing tower | FRP+graphite Φ700×4040 | 8 sets | According to the drawing |
4 | secondary absorbing tower | FRP Φ700×1310 | 8 sets | According to the drawing |
5 | HCL exhaust scrubbing tower | FRP Φ1600×10750 | 10 sets | According to the drawing |
6 | hydrochloric acid pump | S65×50-20 | 10 sets | According to the custom order conditions |
Motor | 3KW | 10 sets | According to the custom order conditions | |
7 | Acid elevated tank | FRP Φ1200×1600 | 2sets | According to the drawing |
8 | water flowmetre | DN25 | 8 sets | According to the custom order conditions |
9 | intermediate cell of hydrochloric acid | FRP Φ2000×3500 | 2 sets | According to the drawing |
10 | HCL suction fan | FRP 9-19-7D | 4 sets | According to the custom order conditions |
Motor | 4 sets | According to the custom order conditions | ||
11 | Graphite heat exchange system | 18M² | 4 set | According to the drawing |
12 | Hydrochloric acid storage tank | 100mª | 12 sets | According to the drawing |
13 | Absorption tower, washing tower packing | According to the custom order conditions | ||
7. oven door environmental protection system (oven gas absorption, washing) | ||||
1 | gas-collecting hood | FRP 1560×1260×1420 | 4 sets | According to the drawing |
2 | scrubbing tower | FRP∅1600×10750 | 2 sets | According to the drawing |
3 | induced fan | FRP 4-72-6D | 1 set | According to the custom order conditions |
4 | hydrochloric acid pump | S65×50-20 | 2 sets | According to the custom order conditions |
Motor | 3KW | 2 sets | According to the custom order conditions |
Images of productions:
- Q:elaborate please. and if you have any sites that would help me please list them..thanks
- Perhaps the quantities of farmers in developed countries. Advanced machinery requires far less labor than do primitive methods. My great grandfather harvested corn by hand with a corn knife and bushel baskets. A modern corn picker probably outperforms his efforts ten thousand-fold.
- Q:i.e lawn mower, snow blower
- Almost every city now has metal recyclers that come to you and pick up your metal. Look in your phone book under recycling, or your local paper for ads.
- Q:as for cars, the battery is recharge when the engine is running, but when fully charged, it automatically shut off. Where are the excess electricity going?we used to have frequent power interruptions here in our locality. So, whenever there is electric power.We connect some car batteries to a power regulator/dynamo installed to an industrial machine that should operate constantly. But having the electric power back on normal operation, the owner didn't bother harnessing this energy bcuz they say it was inconvenient.Is that typical of humans?
- Burning the extra gas creates jobs somewhere.
- Q:Hi so I was just curious if I could get a good strength training workout without the machines like where you push with your legs or the machine where you pull the bar down and it pulls the weights up, I want to know if I can get a good daily workout with just my dumbbells and my bench, Detailed answers are greatly appreciated, any links to websites maybe? In advance I greatly appreciate helpful answers, thank you!
- Yes. I always prefer free weights to machines. That's not to say machines can be of benefit though... The machine where you 'pull down' isn't necessary. As an alternative, you could just do weighted chin-ups. The leg press machine is also replaceable with squats, lunges, etc. Machine exercises can be useful, but you can get by without them. *I'd highly recommend investing in a weight rack. It'll help with squats, shoulder presses, and other things.
- Q:It seems additive layer manufacturing comes in laser to metal format,if so, acquring just one of these machines (although I realize at a ridiculously high price) covers all the functionalities of many variations of CNC machines. (like mills, lathes, routers etc, of which I assume there are limitations on angular production)Will this not cut the learning curve and rapid prototyping time significantly?Or is there limitations in these type of rapid prototyping machines as well do you think?I just think, learning and using many different machines these days on manufacturing is quickly becoming obsolete. What do you think? Is CNC still a must?
- 3D printing is a great technology getting better all the time. While the 3D printer can make all of those shapes within a certain precision (they lay down thin sheets of plastic on top of each other) there are many limitations of the process, such as size, materials, precision, and manufacturing throughput that make it not the best choice in all cases. I designed a part recently out of aluminum that thermally connected a tank to a cold plate heat exchanger. It was made on a CNC mill and could not have been made with 3D printing. Because of the size of it, even if there was a material available, 3D printing would likely have been at least 10X more expensive than CNC milling was. More processes gives engineers more design freedom to come up with better stuff.
- Q:I wanna know why is machinery production more effective than labor?
- Machines work everyday putting out the same quality of product. Humans can vary everyday with there mood and they could have 3 different shifts come in doing different quality too. Plus when holidays come the humans are off work when the machines are sometimes still running with a skeleton crew operating them. Humans are also more expensive because of wages and benefits and lawsuits when things dont go well for them.
- Q:Hello. I have spent a long time on this one question? Can anyone please help? Thanks.The following accounts and corresponding balances were drawn from Winston Company’s 2012 and 2011 year-end balance sheets. Account Title: Machinery 2011: $425,000 2012: $520,000 Old machinery with a book value of $5,000 (cost of $25,000 minus accumulated depreciation of $20,000) was sold. The income statement showed a gain on the sale of machinery of $4,000.The cost of machinery purchased is______
- Beg Balance 425,000 less cost of machinery sold 25,000 plus cost of new machinery 120,000 = End Balance of 520,000 A gain on sale of 4,000, with a book value 5,000, means cash proceeds were 9,000. DR Cash 9,000 DR Accum deprec 20,000 CR Machinery 25,000 CR gain on sale 4,000
- Q:A heavy piece of machinery is raised by sliding it a distance d = 12.5 m along a plank oriented at angle θ = 20.0° to the horizontal, as shown below.(a) How high above its original position is it raised? m(b) How far is it moved horizontally? m
- The trigonometry of a right-angled triangle .. (a) Height = 12.50.sin20 .. .. .. ?h = 4.28 m (b) Horiz.distance (triangle base) = 12.50 s20 .. .. ?11.75 m
- Q:My dad likes machines, has been a machinist for pretty much forever.He works VERY hard-( on his feet most of the time.No air-conditioner.Long hours.etc ).
- No, but the love of mechanical things and how they work is what keeps us going.
- Q:What's the difference between an automatic watch and a mechanical watch?
- There is also a "automatic" appearance and ordinary mechanical watches are very similar, but thinner than the ordinary mechanical watches can be very small, it is actually a combination of mechanical and electronic form, it is the power source by button battery or solar battery powered quartz oscillator, this kind of table travel time is very accurate if, generally with the button batteries a year for a change, if the solar cells do not change, now most of the table.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
CNBM Tons of Potassium Sulfate(SOP) Project Equipment
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords