CMAX Wheel Loader Brand New and Used ZL30F Machine on Sale

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Rated Loading Capacity: 1 Type: Front Loader

Product Description:

 CMAX Wheel Loader Brand New and Used ZL30F on Sale

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.


Our Services

                                                

1.Reply your inquiry in 24 working hours.
2.Experienced staffs answer all your questions in professional and fluent English.
3.Customized design is available. OEM is welcome.
4.Exclusive and unique solution can be provided to our customer by well-trained and professional engineers and staffs.
5.Special discount and protection of sales area provided to your distributor.
6.Do the best reliable heavy-duty single drum vibratory road roller in China.
7.Warranty period is 1-year or 1500 working hours against Bill of Lading.

Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.

 

FAQ

Advantage & Application

1.Chinese Cummi.ns intercooled&  turbocharged diesel engine; 

2. Integral torque converter and   gearbox(Germany ZF technology);

3. Driving axle with built-in free-wheel anti-slip differential;

4. Heavy-duty roller chains transmission balance box; 

5.Popular swing-arm connecting rod  operating mechanism;

6. Free-maintenance rolling-disc  rotary device;

7. Double cylinders control the balde  cutting angle;

8.Two sets of imported control valve  (HUSCO Brand);

9. Imported hydraulic balancing valve  for the blade lifting;

10. Steering system:center articulated mechanism and tilting front wheels to achieve crab-style movement;

11. Electro-hydraulic control:  instrumentation monitoring &  maintenance-free valta battery;


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the reason that the oil tank in the loader is too high?
The reason that the oil temperature of converter is too high is caused by the following aspects:1, the transmission oil level is too high or too lowCheck the oil quantity of the transmission oil pan and adjust the drive oil to the required position.The correct method of operation is:Park the machine on a horizontal floor, shift the handle in neutral and lock it. Loosen the choke and see if the oil is leaking. If the outflow of oil is too much, should be part of the oil release; if there is no oil flow, then the oil level is too low, should be filled with hydraulic transmission oil to the oil flow.2, variable speed pump damage, oil suction pipe impededThe function of the variable speed pump is to control the high pressure oil produced by the torque converter, and the high-pressure oil is distributed to the 2 shaft assembly through the variable speed distribution valve to realize the advance and retrogression of the forklift. The transmission pump damage will cause the gear supply to be impeded.With the increase of the loader's use time, the wear will be increased, the transmission pump will be discharged, and the transmission pressure and mechanical efficiency can not meet the requirements. Thus causing oil absorption pipeline oil supply is not smooth, the oil can not lubricate all parts of the movement, increased friction, but also cause overheating of the system. It should be noted that the transmission pump suction pipe leakage or obstruction phenomenon, will also cause insufficient flow, resulting in excessive oil temperature.3, hydraulic transmission oil metamorphismThe hydraulic transmission oil in the transmission is deteriorated, and the lubrication effect will not be reached. It will cause excessive wear and tear of the system and cause high temperature of the parts in the generator. It is recommended that the loader change the hydraulic transmission oil every 1500 hours.
Q:What is the difference between a loader dry bridge and a wet bridge?
This problem is very difficult, I guess many loader salesman do not know, and most users rarely ask this question,It is suggested that this problem should not become a problem for loader selection......
Q:The role of Loaders
The role of loaders:The utility model is mainly used for shoveling scattered materials such as soil, sand and gravel, lime, coal, etc., and can also do minor digging work for ores, hard soil and the like. Different auxiliary working equipment can be changed, and the lifting, lifting and other materials such as wood handling can also be carried out. In the road, especially in the construction of high-grade highways, loaders are used for filling and excavating of subgrade engineering, aggregate and loading of asphalt mixture and cement concrete field.
Q:Construction machinery, such as excavators, loaders and so on, belong to special equipment?
Need certificates, engineering machinery operator is a high-risk industry, in the actual work, often encounter unexpected situations, ranging from tilting deformation of heavy excavator, excavator whole machine hand is destroyed, the personal safety are often threatened, and according to the provisions of the "Supreme People's Court on the law applicable to a number of people personal injury compensation case interpretation" of article eleventh, the employee suffers from a personal injury engaged in employment activities, the employer shall be liable for compensation, so the compensation liability for personal injury excavator manipulator is borne by the employer. For many individual users, the excavator is the largest of its property, when the excavator driver accident, injury or even death, is often huge losses and damages without the ability to bear the cause of the accident.The insurance company has the right to refuse compensation for the accident caused by the excavator operator without the operation permit. This situation is very passive for the users and operators of the excavator.Therefore, it is very necessary for the operator to handle the formal operation certificate which is recognized by the state. The following network will give you a brief introduction to the way to obtain the operation permit of the excavator and the matters needing attention:Excavator operation certificate has the following three kinds, these three kinds can be used as the operating documents of the insurance company when the accident is processed.
Q:Which brand is the best for a small loader in Laizhou?
All of the same mould, it is recommended to the Shahe town on-the-spot investigation
Q:Loader shovel skills
A lightWhen loading the loader, place the heel firmly against the floor of the cab, parallel the pedals and the accelerator pedal, and gently press the refueling pedal.Two.The loader always keeps the throttle steady during the operation. General operating conditions, the throttle opening at about 70% is appropriate.From threeIn the loader operation, the baseboard should be separated from the brake pedal, flat on the cab floor, and never step on the brake pedal. Loaders often work on uneven job sites. If the foot is always on the brake pedal, the body is running up and down, causing the driver to step on the brake pedal without interest. In general, control the engine conditions and shift gears by controlling the speed of the throttle. This will avoid frequent braking, resulting in overheating of the braking system, but also for the loader to speed up quickly to bring convenience.Four QinIn loader operation, especially in the operation of digging and digging, the bucket should be filled with material under the condition of stable throttle. The cycle pull of the hoisting and turning control lever is called "diligence"". This process is very important and has a great impact on fuel consumption.Five coordinationCoordination is the combination of lifting and bucket handling. Generally, the backhoe process of the loader is to lay the bucket flat on the ground and smoothly to the material pile. When the bucket is parallel to the hopper, the resistance should first follow the principle of first lifting the arm and then receiving the bucket. It can effectively avoid the bucket bottom resistance, which can give full play to the maximum breakout force.Six strictly prohibitedFirst of all, tires are strictly prohibited. When the loader is working, the door will skid when encountering resistance. This phenomenon is usually caused by improper handling by drivers, increasing fuel consumption and damaging the tires.
Q:Loaders are divided into what vehicles, as well as the model on a few meals (50) what do you mean? Thank you
For example, ZL50 Z said 50 wheeled loader L said that 50 tons load is 5 tons 30 tons 40 tons is 3 is 4 ZL50 and so on is the loader wheel load of 5 tons if ZLC50 C said that if the rollover rollover function ZL50C the C is the model of diesel engine characteristic code according to the actual work needs is common there are some common models and rollover will also have the claw type wharf for loading logs and other objects in belonging to the special vehicle according to the need can do a lot of changes in the actual use of the loader is integrated a lot of things you can do
Q:The depreciation period and depreciation rate of the loader
(3) appliances, tools, furniture and so on related to the production and operation activities, for 5 years;(4) aircraft, trains, ships and other means of transport for 4 years;(5) electronic equipment, for 3 years.2. The depreciation period of the loader shall be 10 years, and the salvage value is 5%.Annual depreciation (= the original value of fixed assets is expected to use the residual value) / estimated lifeThe annual depreciation rate = annual depreciation / fixed assets *100%Monthly depreciation rate = annual depreciation rate /12
Q:The working principle of the loader engine
The working principle of two stroke diesel engineBy two strokes of the piston to complete a working cycle of the engine is called the two stroke diesel engine, oil engine crankshaft in a work cycle of only one round, compared with the four stroke diesel engine, it improves the work ability, there are great differences in the structure and working principle.The basic structure of the two stroke diesel engine is the same as that of the four stroke diesel engine, and the main difference is in the valve train. Two redThe diesel engine has no air intake valve, and some do not have an exhaust valve. Instead, a scavenging port and an exhaust port are arranged at the lower part of the cylinder;A scavenging port and an exhaust valve mechanism are also provided. Specially set up a scavenging pump driven by moving parts and stored pressure airThe utility model simplifies the structure of the diesel engine by matching the piston and the air port to complete the gas distribution.The diagram is the working principle diagram of the two stroke diesel engine. The scavenging pump is attached to one side of the diesel engineThe rotor is driven by a diesel engine. Air is inhaled from the pump, compressed and discharged, stored in a larger volumeScavenge the air box and maintain a certain amount of pressure in it. The work of the two stroke diesel engine is illustrated in this paperPrinciple.
Q:The loader needs to place detailed details of the butter
Now, the new machine also has a sticker showing the details of the butter and the filling timeAnd the maintenance manual is a more detailed introduction

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range