CMAX TTC8018-12FLAT TYPE TOWER CRANE WITH MODULAR DESIGN

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 12 Maximum Lifting Height(M): 40 Rated Loading Capacity: 12
Span: 80 Rated Load Moment: 12

Product Description:

BRIEF INTRODUCTION

CNBM is China's well-known trademark enterprise, the center of science and technology enterprises in China, the company has issued by the state administration of quality supervision, inspection and quarantine qualification grade A of special equipment production, the production of large hoisting machinery, tower crane, construction elevator construction machinery such as the national fixed-point enterprise, but also in north China's largest construction machinery and equipment production base.
After years of continuous improvement and innovation, both heavy industry has already formed the unique style of products, products are divided into:
A. tower crane, tower take type tower crane, flat type tower crane, movable arm type tower crane (basic covering various models);
B. construction lifter: Ⅰ model construction lifter, Ⅱ model construction lifter, Ⅲ model construction lifter, frequency, low speed, medium speed and high speed construction lifter.

 

SPECIFICATION OF TTC8018-12FLAT TYPE TOWER CRANE  

Technical parameters and performance:
1. TTC8018 lifting beam frame is composed of section 11, the total length of 81.4 m;
2. Balance arm consists of 3 section, total length of 22.8 m.
3. The transition of the tower design make the arm on the turntable and balance, jib join together, its biggest is 80 m, the largest lifting weight of 12 t.
4. The lifting beam frame combination is rich, balance arm more small turning radius.
5. The unique shape of the beautiful, the stress of the reasonable design and efficient electronic devices

CORE TECHNOLOGY AND INNOVATION:

1,boom with fast connecting special way, to ensure that the installation and disassembly sections between the flexible and convenient;

2, modular design, realizes the application of arm in the same series of different types of tower crane;

3, the use of variable cross-section design concept, the use of high-strength structural steel, the maximum reduction of the weight of the boom, improve the effective weight;

4, the arm rod design, can realize the air arm variable and self disassembly, expand the scope of application of tower crane.

5, the standard section uses the chip structure, each piece uses the high strength hinge bolt joint, the effective enhances transportation efficiency and the assembly precision;

6, selection industry advanced driving scheme, effectively reduce the energy consumption and improve the stability of the tower crane, to ensure the reliable operation of the tower crane; hoisting,

The variable amplitude mechanism is fast, and the speed regulation is good, and the work is stable and reliable..Stepless speed adjustment of the rotary mechanism, stable, no impact;

7, electrical control system: the use of PLC control, improve the reliability and security; the main components of the domestic and foreign well-known brands, Schneider,

OMRON, etc., less trouble, maintenance simple, reliable work;

8, safety control technology using the multi - functional tower crane safety control system of the national invention patents, improve the safe operation of the equipment.

IMAGE OF TTC8018-12FLAT TYPE TOWER CRANE 

CMAX TTC8018-12FLAT TYPE TOWER CRANE  WITH MODULAR DESIGN

CMAX TTC8018-12FLAT TYPE TOWER CRANE  WITH MODULAR DESIGN

FAQ OF TTC8018-12FLAT TYPE TOWER CRANE  

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

Providing all-embraced warranty of products quality, worksite installation guidance

Providing ample spare parts and training of operation and maintenance

Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:when a skyscraper is done being built, how does the crane come down?
In pieces, section by section, and then the base is taken out by Helicopter. Or at least that is how I would do it.
Q:What is the maximum weight an industrial crane can lift?
Last okorder.com/
Q:Why does Crane deliberately place the dinghy's crew in sight of land in the story?
The Open Boat is a true story - Crane was sent to Cuba as a war correspondent in 1897, and he boarded a vessel named the Commodore. The vessel sank off New Smyrna Beach, Florida in heavy weather, and the survivors made their way to shore in the open boat described. The wreck of the Commodore is in 90 feet of water, fourteen miles out and is currently under an Admiralty salvage claim.
Q:How is a Crane built upwards and how is it dismanteled ?
A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
Q:Breifly explain the brake system in the lifting devices ex. Over head crane?
Cranes work using hydraulics and cables. The cables are wrapped around pulleys and the pulley is turned using hydraulic power. The brake system is simply stopping the pulley from turning by reducing power. The hydraulic system typically will turn a series of gears which in turn spins the pulley that the cable is wrapped around. It's different than a brake system say on a car where when you hit the brakes, pads squeeze on the interior of the wheel rim slowing it down. Cranes you just reduce power and stop the pulley from turning. They also have emergency stops. Older cranes have wedges that would be released onto the cable and then the wedges would grab the cable and slip into a ring. The narrow end of the wedges would slip into the ring first and then as the wedges increased in diameter the grip on the cable would get tighter and then stop the cable from moving. They also have systems on the pulleys to stop the pulley from spinning. They essentially work the same way as a car break. When the emergency brake is triggered, pads will squeeze on the rim of the pulley to stop it. These mechanisms work by friction. They could also have holes around the pulley and a steel pin would be pushed into one of the holes to stop it from spinning. Of course if the force of the weight exceeded the strength of the pin, it would shear.
Q:Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
Lifting mechanism in tower crane: M5. Luffing mechanism: M4 is the working system
Q:What is your favorite poem by Hart Crane?
How about my favorite poem about Hart Crane? AT HART CRANE’S TOMB by Glenn Robert Swetman In his mind’s dark, he spoke a frivolous age where marriage of the like was spring, where vitelline worlds of virgin instinct were crushed in the obscene cleanliness of a raccoon’s paw. Did he imagine that his great sun could come trailing yellow handkerchiefs of light, like a queer comet? No, there is something out there that commands, and not worlds of perfect clipping will turn these rotund hedges into maypoles—and live. That’s why the green expands as it reaches. He must have seen this finally. His leap Into the green sea was, aesthetically, clean.
Q:How high the tower crane needs to be installed with the wall pole. How is it stipulated in the national standard?
The construction of tower crane installation, operation and dismantling safety technical regulations "(JGJ196-2010) design provisions in article 3.3 attachment device of tower crane: when the tower crane attachment for use, attachment device settings and free height should comply with the provisions of the instructions; when the attachment level distance, attachment spacing does not meet the the instructions should be carried out, design calculation and drawing the map produced and written instructions; the attachment device and embedded parts shall be the original component manufacturer or made with the corresponding ability of the enterprise; the attached device design, the main structure of the building to support the checking.The regulations on the supervision and administration of the safety of building cranes (Ministry of Construction No. 166th) states: "it is prohibited to install the standard sections and attachments of non original manufacturing plants on the free construction lifting machinery.".The independent height of the tower crane is determined by the manufacturer's manual. The independent height of the tower cranes of different manufacturers and different types is different. The installation of the tower crane needs to be installed with a wall rod. The specifications are stipulated in the instruction. The national standard requires the instruction of the manufacturer's manual.
Q:i have a knife with either 2 flamingos or cranes on the blade does anyone know the maker?
Sounds of the Asian descent,
Q:How to fix the cable on the tower of QTZ125 type tower crane?
The main purpose is to prevent the main cable fixed tower crane tower crane cable weight lead cable pulled bad (insulation damage, core pulling) etc.,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range