CMAX Tower Crane TC5013B with ECE Certificate

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Quick Details

Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 8T

Span: 50m                                             Place of Origin: Human China(Mainland) 

Brand Name: CMAX                              Model Number: TC5013B      

 

Packaging & Delivery

Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Specifications

● Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,

● Reduce future maintenance cost.

 

 

 

 

To Lead The Revoluation of International Trade

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:More than meters of tower cranes must be equipped with red barrier lights at the top
To see the land of tower crane or floating crane... Basically,
Q:Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
Lifting mechanism in tower crane: M5. Luffing mechanism: M4 is the working system
Q:S930 M50 (M125/75) level jib tower crane about how much money
Do you want to see is that, generally is Sishijiwan
Q:How many stops are there in a tower crane? Where are they located in the tower cranes?
The hook has an upper limit on the windlassThe car has front and rear spacing on the trolley hoistSlewing is limited to the slewing gearAnd the torque limit is on the spireWeight limit
Q:How much is a team of 40 tower crane
Tower crane rental generally do not rent pricing, can not count number, not today is installed, removed tomorrow!Usually on a monthly basis, with or without use!
Q:What does "automatic tower crane" mean less than 100 tons per metre?
The crane must not exceed the maximum lifting capacity when working! Otherwise, there will be danger.
Q:What are the qualifications for site installation and acceptance of tower cranes and construction lifts?
and their own preparation program, the use of side with security records, often do this, all know!
Q:How to improve the stability of tower crane
Phosphating coating of steel wire rope, give priority to the use of manganese or zinc manganese phosphating, and smooth steel wire rope production process comparison, just add the last bonderizing process, steel wire, wear resistance and corrosion resistance is greatly improved, the use of the wire without direct phosphating cold twisted steel wire rope.
Q:Calculate the tower crane gantry crane
Is building gantry crane crane, gantry crane is generally used for the port, port crane. Can not be regarded as the tower crane.There are several common types of cranes: overhead cranes, gantry cranes, port cranes, automobile cranes, tower cranes, etc..Gantry crane is a medium and small cantilever crane with simple Longmen.
Q:How much more than m of tower crane jib winch point height should be equipped with anemometer
The use of 4.0.15 tower crane height of more than 30m should be equipped with obstacle lights, jib root hinge height of more than 50m should be equipped with anemometer.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range