CMAX TOPKIT TOWER CRANE TC5516 WITH JIUHE MECHANISMS

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month
  • OKorder Service Pledge
  • Quality Product
  • Order Online Tracking
  • Timely Delivery
  • OKorder Financial Service
  • Credit Rating
  • Credit Services
  • Credit Purchasing

Add to My Favorites

Follow us:

Item specifice

Maximum Lifting Weight:
8
Maximum Lifting Height(M):
200
Rated Loading Capacity:
8
Span:
55
Rated Load Moment:
8

BRIEF INTRODUCTION

After years of continuous improvement and innovation, both heavy industry has already formed the unique style of products, products are divided into:
A. tower crane, tower take type tower crane, flat type tower crane, movable arm type tower crane (basic covering various models);
B. construction lifter: Ⅰ model construction lifter, Ⅱ model construction lifter, Ⅲ model construction lifter, frequency, low speed, medium speed and high speed construction lifter.
Quality is the life of the enterprise, we always pursue "zero fault", product quality and safety performance has been in a leading position in the domestic industry."Brand is famous for its security" enjoys a good reputation the industry inside and outside.First-class service quality, life-long follow-up service, customers of buy and use the rest assured.For both heavy industry have to form large, mature marketing network all over the country, with the agent 288, nearly 30 provinces, cities and autonomous regions nationwide, and exported to India, Singapore, Iran, Russia, Mongolia, South Korea and other dozens of countries and regions, deeply the general customers the high praise.

SPECIFICATION OF CMAX TOPKIT TOWER CRANE TC5516

item

unit

parameter

2Rate 2

4Rate 4

rated hoisting moment

t·m

80

 working radius

m

3.15~5.5

Load capacity at max radius

t

1.6

 Max load capacity

t

8

Rated load capacity

radius

m

R=3.15~27.07

R=3.15~14.83

load capacity

t

4

8

 radius

m

R=27.07~55

R=14.83~55

load capacity

t

4~1.6

8~1.6

Hook height

Independent type

 Traveling type

m

44、45

Anchoraging type

138

70

Working speed

Hoisting mechanism 

m/min

40/80

20/40

Trolleying mechanism

m/min

12/27/53

Slewing mechanism

r.p.m

0.31~0.6

Top-climbing mechanism

m/min

0.5

Mechanism power

Hoisting mechanism

KW

YZRWFc250M-4/8     30/30KW 

Trolleying mechanism 

KW

YZTDE180-4 /8/24 5/3.7/1.1KW   

 

Slewing mechanism

KW

YZR132M2-6   2×3.7KW

Top-climbing mechanism

KW

5.5

cross-section (l×w×h)of standard section 

mm×mm

1600x1600x3000

Weight of the counterweight when the length of jib is 55m

t

14.10

Weight of the counterweight when the length of jib is 49m

t

13.05

Weight of the counterweight when the length of jib is 43m

t

12.00

Max allowed wind in service

20m/s

Max allowed wind when top-climbing

13m/s

Ambient temperature 

-20°C ~ +40°C

The length of jib can be adjusted to 55m, 49m or 43m

IMAGE OF CMAX TOPKIT TOWER CRANE TC5516

CMAX TOPKIT TOWER CRANE TC5516 WITH JIUHE MECHANISMS

 

CMAX TOPKIT TOWER CRANE TC5516 WITH JIUHE MECHANISMS

 

FAQ OF CMAX TOPKIT TOWER CRANE TC5516

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

  

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

 

 

Q:How are those really tall construction cranes assembled ???
I saw one erected once - it was fascinating. They started out with a big mobile crane - then they added piece by piece until they finished it.
Q:Is there a crane big enough to lift Hillary off the yoga matt when she has finished her yoga?
Unfortunatly....
Q:I need to know how Stephen Crane came up with writing the Red Badge of Courage. I need examples of his life experiences that he had and then he put them in the Red Badge of Courage.
In March 1893, while spending hours lounging in his friend Corwin Knapp Linson's studio while having his portrait painted, Crane became fascinated with old Civil War issues of the Century published between 1884 and 1887. Largely devoted to famous battles and military leaders, the writing was dry and lifeless and Crane, frustrated, said to Linson, I wonder that some of those fellows don't tell how they felt in those scraps. They spout enough of what they did, but they're as emotionless as rocks. Crane returned to these magazines during subsequent visits to Linson's studio and eventually the idea of writing a war novel overtook him. He would later state that he had been unconsciously working the detail of the story out through most of his boyhood and had imagined war stories ever since he was out of knickerbockers. This novel, which he believed would make him famous, would ultimately become The Red Badge of Courage. From the beginning, Crane wished to show what it felt like to be in a war by writing a psychological portrayal of fear. Conceiving his story from the point of view of a young private who is at first filled with boyish dreams of the glory of war and then quickly becomes disillusioned by war's reality, Crane borrowed the private's surname, Fleming, from his sister-in-law's maiden name. Crane would later tell Hamlin Garland that the first words and paragraphs came to him with every word in place, every comma, every period fixed.
Q:I don't know what the difference is. :(
an egret is any of several herons and several of which develop milky white plumes during the breeding season,some herons are called egrets. Cranes are a family of large, long-legged and long-necked birds Unlike the similar-looking but unrelated herons, cranes fly with necks outstretched, not pulled back. Cranes’ necks are a shorter than those of heron.Herons curve their necks into an “S” shape and when they are flying they pull them totally back, while cranes necks’ stick straight out. Cranes also have shorter beaks than herons.
Q:About tower crane torque limiter with 4 limit switches, each play a role, thank you
Hook top point control: when the hook to the high limit, limit action, do not continue to hook!Overload control: when the weight exceeds the overload point or amplitude exceeds the maximum amplitude or the loading rate is more than 105% when the output control, prohibit the hook lifting action and prohibit car distance to allow the car to increase the amplitude, amplitude can be damped near.
Q:I've looked on the internet and I haven't found anything so far. The paper on it is due tomorrow...arrrggghhhhh...
Hi, Briisthe! Just go into Google and type - what is the migration route of the whooping crane? Then click on the article - Journey North Whooping Crane Migration Then click on the maps and all will be revealed.
Q:what are the effects of fiction in cranes?
Uh.... Do you mean fRiction? And cranes... as in the machine or the bird..... Try to be specific.....
Q:I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q:what are The performance parameters of tower cranes?
The technical performance of tower crane is expressed in a variety of parameters, the main parameters include the range, starting weight, lifting torque, free height, maximum heightand so on; its general parameters are: a variety of speed, structure, weight, size, tail size and gauge wheelbase, etc.
Q:what are Gantry cranes?
A okorder /

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request