CMAX TC 6014 Tower Crane Construction Machine

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 8t Maximum Lifting Height(M): 200m Rated Loading Capacity: 8t
Span: 60m Rated Load Moment: 8t

Product Description:

CMAX TC 6014 Tower Crane Construction Machine

Product Description:

Descriptions of our tower crane:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our tower crane:


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2,It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.




FAQ;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period. 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What does the lifting mechanism mean in a tower crane?
Magnification, in simple terms, refers to several ropes through the hookIf it is one in and out of two wire rope, that is two magnificationSimilarly, two into two out is four magnification
Q:what is the proper way to fold a paper crane?
I would go to a library or a book store and find a book on origami.
Q:how would you describe crane-man? Use specific examples from the novel to support your answer?
Crane-man is a kindly old man with a crippled and useless leg. Crane-man takes care of Tree-ear and loves him very much. Crane-man can only walk around with crutches, but he still had the upper body strength of a young man. Sadly, at the end of the story, Crane-man dies of a heart attack when he falls into the river next to the bridge and the freezing water kills him. Crane-man outlived all of his family and friends, and unable to work, he was forced to sell all of his possessions, and eventually he ran out of money and came to live under the bridge. A crane, besides standing on one leg, is also a symbol of long life, and this is how Crane-man got his name. Throughout the story, Crane-man displays his generosity and kindness towards Tree-ear, Min, Min’s wife, and other villagers. the link below provides a full synopsis of the book
Q:What is the present status of large Boom Tower Crane?
Large boom crane arm depicts one and another new history. New York's World Trade Center towers is the skyscraper that is the highest and has the most floor in New York City .Its main building is steel and concrete composite structures,using steel 78 thousand tons.The Building started in 1966 and lasted seven years, with 110 layers, 411 meter in height as a giant skyscraper it is writed in history. During in Construction
Q:how do they get cranes off of skyscrapers when there done?
bigger cranes
Q:In Stephen Crane's novel The Red Badge of Courage, why is the war itself not even named?
There are references in the book to events during the Civil War. In addition, the time of publication by this American author left no doubt in any American's mind which war it referred to. The Spanish American war happened after publication and the primary war on everyone's minds was still the Civil War.
Q:Operation points of tower crane (tower crane)?
Slewing bearing: tower crane is one of the most critical components, mainly to bear overturning moment and vertical load. After the failure, the demolition and replacement is extremely difficult, loss of large, so you have to check carefully to do maintenance, each 200H must be a senior grease lubrication from the rotary bearing surface, until now exudation. Slewing bearing adopts high strength bolt connection, if the pretension is not enough, or long-term operation, do not check, not fastening, will cause loose. If the individual bolts loose, will cause the remaining bolts overload, the consequences will be disastrous. The luffing mechanism only moves horizontally, the load is light and the line speed is not high, so it should be easy to master and operate. However, the amplitude involves the change of the lifting torque, and if there is no stopping in time, there will be the possibility of over torque. Therefore, the main requirement of variable amplitude operation is stationary parking and accurate positioning. The tower crane is of great height and the hanger is hung longer, so it is easy to swing the hanger when it is running. This is an objective phenomenon. What is called stabilization hook operation is how to make the swinging hook stop quickly, or how to make the hook move with the movement of the crane as soon as possible, and minimize the operation of the swing. The operation of stabilization hook is the skill that the driver should master.
Q:How do you calculate ground bearing pressure for cranes?
You use statics. You get the specs for the crane and what it is lifting and determine from the site the pick angles and where the outriggers are going to be placed. Then you do the 3-D calcs to determine the reactions necessay and determine the soil's allowable bearing pressure, then design temporary footing based on that.
Q:What do you know about Cranes (not the construction equipment, or the paper, the birds!)?
There okorder.com/.. The crane is a symbol of long life, prosperity, and good health, according to Japanese culture.
Q:ichabod crane?
Maybe he drank a lot of absinthe and smoked a lot of opium!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range