CMAX SWDL800 Augered Pile Rig for Sale on Okorder.com

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

CMAX series spiral pile drill rig is a new type of simple drilling equipment with independent innovation, ideal for pile construction in solar panels, billboards, street lamp, fences, flagpoles, traffic signs, isolation net and simple houses, giving strong stratum adaptability and high efficiency.

◆ The rig is equipped with a large torque rotary head for strong power, which provides strong adaptability in stratum.

The hydraulic system adjusts rotation and feed to the stratum conditions accurately, which ensures high drilling efficiency.

The rig is equipped with a pile guide device to guarantee pile verticality and quality.

The rig can be equipped with various pile connecting devices according to the pile structure and size, which makes pile insertion flexible and efficient.

◆ In different stratum condition, the rig can be equipped with down-the-hole percussion, cutting, short spiral and other tools to achieve full stratum drilling.


MAIN DATAUNITSWDL800
OPERATION PARAMETER 
Pile diametermm76~200
Pile depthm4
CHASSIS

Track basemm2745
Gaugemm2312
Crawler widthmm350
Ground clearancemm460
Blade lengthmm/
ENGINE

Model
4BT3.9
DisplacementL3.9
Power/SpeedkW/rpm75/2200
Fuel tank capacityL300
FEED

Length of drillrigmm6920
Feed lengthmm4500
Feed speedm/min4
Feed forcekN75
TRAVELLING

Travel speedkm/h3.2/2.0
Traction force, maxkN100
Hill climbing ability°25
ROTARY

Rotary speed, maxrpm40
Rotary torque, maxNm6000
ENSION

Gross weightt16
Diamension(L×W×H)m9.04×2.95×3.4


Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.

 

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.



 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What brand of pile driver is good 10?
Qingyuan Xin Feng Machinery Factory production of 2 Taiwan good ~ we are the brand ~ I just listen to my father said that the specific amount should be 200 thousand ~ a ~ details of your advice of high manager soldiers accounted for ~ should Baidu can be found in the.
Q:In what type of terrain can the survival machine be used to strike minerals?
Any terrain. As long as you dare to go down
Q:Which brand is good for a pile driver / pile driver?
Pile driver has multiple types of wheeled and tracked, allowing users to have more choices, but in terms of pricing is reasonable, domestic brands in the relatively high cost of sales in the top brands, many brands.
Q:Can a pile driver hit a rock?
In a spiral track Matlock advantage:1 、 simple operation, one hole forming,2, fast, 3-5 minutes can become holes 5 meters3, the maximum diameter of the hole 800mm, the maximum hole depth of 10m, suitable for housing construction, highway, high-speed rail slope protection and other pile foundation construction4, special, mobile convenient, 360 degrees of free rotation5, firewood and electricity dual-use, reduce cost expensesA Hui Omron caterpillar rotary drilling rig advantage:1, the fastest 20 minutes, you can dig 5-8 meters of earth drilling2, drilling can break strong weathering rock layer3, the well-known brand of the engine, "Yuchai, Weichai, fuel consumption 40-50 yuan per hour.4 、 selection of multi-functional parts, such as: Clay bit, sand fishing drill, bottom drill bit, easy to change, practical.
Q:I have two pile drivers, followed by engineering piling, what qualifications do you need?
Hang on it, for qualification trouble. You can contact me if you need to buy piling equipment.
Q:The impact of drilling pile driver how much money
See how big you want to play, I want to hit a big pile on your point
Q:What is the difference between piling and piling?
the center of the city, hammer smoke and noise nuisance, environmental protection is generally not let the surrounding residents also opposed. From the environmental point of view, low environmental impact pile, and the impact on the surrounding pile is much smaller than the pile.
Q:What should I pay attention to when purchasing a hydraulic pile driver?
Landlord, you have a wide range of this, piling machine applications are many, and there are many types of models
Q:A screw driver pile diameter 400mm depth of not less than 12 meters, 24 hours a day non-stop, how much can be hit?
A screw driver pile diameter 400mm depth of not less than 12 meters, 24 hours a day non-stop, how much can be hit?
Q:How many hours will it take for the 200 piles and the 1 pile drivers?
Because there is a piling process: measurement line - out pile connection - send pile inspection -- moving pile pile machine in place -- the original check -- prefabricated pile precast pile lifting pile stabilizing pile -- -- --.It depends on what kind of pile, the diameter of the pile, the geological condition, the construction site, the construction organization and so on.Taking prestressed pipe pile of 18M as an exampleAbout 20 per day, about 10 hours / day, and that is exactly every half an hour. This refers to the "stability, pressure, connection and delivery" critical progress, because other schedules can be arranged in parallel. While not completely parallel arrangement, the efficiency drops by half, that is, it takes 1 hours to hit a pile.So it takes a lot of skilled workers to finish the job faster.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range