CMAX SWDH89A Full Hydraulic Open-pit Drill for Sale on Okorder

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

CMAX SWDH89A Full Hydraulic Open-pit Drill  for Sale on Okorder

CMAX SWDH89A Full Hydraulic Open-pit Drill  for Sale on Okorder

SWDH89A full hydraulic open-pit drill carriage is designed according to the operating conditions of small-medium size quarries and small open pit mines. The drill hole diameter ranges from Φ76 to Φ102mm and the maximum hole depth is 20m. It can be used in quarry, civil engineering, road engineering, open pit mines and hydropower station construction as well as other rock blasting and drilling works. It is mainly used for drilling hard and above medium hard rocks and has strong climbing ability and flexibility. It can carry out drilling operation in complex terrain. And it is low energy consumption with high drilling rate.


MAIN DATAUNITSWDH89A
OPERATION PARAMETER 
Hole rangemm89~115
Drill rod diametermmT45、T51
Drill rod lengthm3.66m×6
Hole depth, maxm20
AIR COMPRESSOR

Model
CF128R
Working pressureMPa0.8
Free air deliverym³/min8.3
ENGINE

Model
QSB6.7-C220
Power/SpeedkW/rpm164/2200
Fuel tank capacityL350
FEED

Length of drillrigmm8000
Feed lengthmm5000
Feed extensionmm1200
Pitch angle°140
Overturn Angle°-20~+90
Feed rate, maxm/s0.8
Feed forcekN25
BOOM

Boom length, totalmm2800
Lifting angle°+45~-30
Swing angle°15(L)~55(R)
TRAVELLING

Travel speedkm/h3.5/2.0
Traction force, maxkN100
Hill climbing ability°25
Track oscillation°±10
Ground clearancemm400
HYDRAULIC ROCK DRILL 
Model
DF600S
Impact powerkW20
Rotary torquerpm1000
Rotary speedN.m90~180
DIAMENSION

Gross weightt15
Transportation state( L×W×H)m11×2.92×3.35
Working state(L×W×H)m8.4×2.92×9.15


Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.

 

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the types of pile drivers? What are the characteristics of each?
According to the hole forming process: the diesel hammer is immersed in the hole, the spiral drilling hole, and the Luoyang shovel holeIn accordance with the general classification of hole forming and compaction type: diesel hammer hole clamping hammer tamping hole; diesel hammer tamping; spiral drilling tamping (DDC); Luoyang shovel hole tamping and spiral drilling concrete pile (CFG). And what you say, pipe pile and fish, hammer, strong rammer are also belong to composite foundation. Among them, the pipe pile is divided into static pressure pile (suitable for static pressure machine into the ground) and diesel hammer pipe pile (diesel hammer directly into the ground).Several of the above are mainly to eliminate collapsibility and increase the composite bearing capacity, which belong to composite foundation. The main load of single pile is the cast-in-place concrete pile with rotary drilling holes.The above is the classification of the process, and how many layers are suitable for the construction.
Q:Rural housing foundation, piling machine generally can play how deep?
3, the use of XCMG power head, multi-stage shock absorption technology to ensure that the overall construction of more stable, power head key bar used in reverse and used to extend its service life.4 、 adopting the lock rod of the XCMG machine and the automatic lowering technique of the mast. The vertical precision of the pile hole is higher, and the construction is more convenient.5, the well-known brand "Yuchai engine," every little hour consumption 40-50 yuan.6, the use of wide, tube rice suitable for medium weathering below rock layer, sediment layer, backfill soil layer and other complex landforms.
Q:How much is a pile driver for a building?
According to the day and each dozen a pile to collect, the price is different from place to place
Q:Is there a pile driver in it?
There's one in the neighborhood. Can find other counterparts to learn, skilled in their own open. However, the piling machine is not stable, but also a team together. And we're going out of town, this month, ten days.
Q:Advantages and disadvantages of pile driving methods
Here are some of the advantages and disadvantages of the above methods:Hammer method:The method is simple in construction, small in investment and convenient in construction, and has been widely used before.But there is a cut that doesn't go around. It's too noisy and doesn't work in hard soil or soft soil. It's being phased out.Static pile:Use the static pressure to press the pile into the ground, no vibration and no noise during construction. Applicable to weak soil and adjacent to the construction of structures that are afraid of vibration.But when there is a sandwich of medium thick sand with thickness greater than 2m, it is not suitable to use the static pressed pile. And there is soil squeezing effect.Vibration method:The vibration hammer is lifted to the top of the pile, pile head is connected with the vibration box pile cap or hydraulic pile clamping device for clamping, the exciting force generated by the vibration hammer pile to soil vibration, friction force between soil particles is greatly reduced, the pile under the action of self weight and mechanical force into the soil.The vibrating pile driving equipment has the advantages of simple structure, convenient operation and high efficiency. Suitable for heavy steel sheet pile, steel pipe pile and the length within the 15m slender reinforced concrete precast pile in the sand in the highest efficiency, poor little clay.
Q:What is the difference between piling and piling?
Often hear of pile and pile, so? Pile has little influence on the site and the surrounding buildings, there are vertical pile pressing machine level to control, at night can also work; piling effect on the site and the surrounding buildings, verticality by bidirectional theodolite or hammer line observation, night can not see, can not work;
Q:What should I pay attention to when purchasing a hydraulic pile driver?
Landlord, you have a wide range of this, piling machine applications are many, and there are many types of models
Q:Code for installation and operation of pile drivers
4. Check whether the voltage of the power supply meets the requirements.5, according to the daily maintenance project to each department lubrication, maintenance.Five, pile driver in the work safety precautions:1, when the piling machine work, there should be special command. The conductor and operator should check each other's signals before they work. Work closely together.2, at the start of the bell signal or other applications, notify the staff around to leave.3, hammer and pile cap, pile cap and column (or pile) plane to pad, a connecting bolt should be tightened, and should always check whether there is loose.4. The starting of the pile driver should be adjusted from low gear to high speed.5, the pile driver in the work should be closely observed on the control panel current, voltage instructions. If abnormal sound or other abnormal conditions are found, stop inspection immediately.6, always check the temperature of the bearing and the bearing cover screws is loosening, should strictly examine the eccentric block coupling screw loosening, prevent the occurrence of accidents.7, sink, column (or pile) prohibited to stand around.8, piling machine with water, mud suction sink, should contact in advance with the relevant personnel, and take care of each other at work.9, long pipe column or pile and the installation of pile cap, the staff must wear safety belts.10 、 in the process of sinking, it is strictly prohibited to do mechanical maintenance work.Six after the stop of the piling machine, the power shall be cut off immediately, and the pile driver and motor shall be inspected and maintained.Seven, piling machine long-term disabled, should be kept in storage, the motor should be good moisture-proof protection, the control panel of the instrument, should be removed, storage, storage.
Q:PV pile driver
The PV pile driver has both wheel and track components. The tracks are divided into generators and full hydraulic ones. Shandong Tengzhou production of this idiot manufacturers have a few, can come to Shandong to look strong, has many years of construction experience in complex terrain. Can prevent landslides and broken stones.
Q:Is the lever of the pile driver fast?
Hello Wylong machinery machine lock rod piling machine for sure rod much faster.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range