CMAX 's Tower Crane H5510 TC5510 high quality 6ton

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
2 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Quick Details

  • Feature: Tower Crane

  • Condition: New

  • Application: construction

  • Rated Lifting Moment: 63MT

  • Max. Lifting Load: 6T

  • Max. Lifting Height: 140M

  • Span: 55M

  • Place of Origin: China (Mainland)

  • Brand Name: CNBM

  • Model Number: H5510

Packaging & Delivery

Packaging Details:In Nude/40'HQ/ Wooden case
Delivery Detail:30

 

 

 

 

 

ModelH5510
Jib length(m)55
Max. load capacity(t)6
Tip load(t)1
Base typestationary/under carriage/travelling
Hoisting height(m)Free standing(m)40
Anchoring(m)140
Mast section(m*m*m)1.6*1.6*2.8
Electric power(kw)31.7
Working speedFall24
Hoisting capacity(t)31.563
Hositing speed(m/min)0~400~800~200~40
Slewing speed(r/min)0~0.65
Trolleying speed(m/min)0~58

 

 

Tower Crane Series

H5015, H5510, H5810, H6010, H5515, H5515B, H6015, H6015B, H6024, H7030, H7030B, H7050

 

Topless Crane Series

T6010, T6015, T6015B, T6022, T7527, T7527B, T8040, T8040B

 

Luffing Crane Series

Tower Crane Series

 

H5015, H5510, H5810, H6010, H5515, H5515B, H6015, H6015B, H6024, H7030, H7030B, H7050

 

Packaging & Shipping
All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.
 
 

 

Our Services
 

 Our Service
1.We can make special sample according to the customer’s requirement.
2. We have more than 60 professional technical team, provide best after-sales service
3. Fast delivery time
4. We have CE, ISO9001 and GS certification.

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Wall mounted tower crane
The construction of tower crane installation, operation and dismantling safety technical regulations "(JGJ196-2010) design provisions in article 3.3 attachment device of tower crane: when the tower crane attachment for use, attachment device settings and free height should comply with the provisions of the instructions; when the attachment level distance, attachment spacing does not meet the the instructions to.
Q:How did the tower crane rise on the construction site? Fifteen
It's not a cable, it's a steel bar! Scaffolding
Q:How many meters of cranes should be in accordance with the anemometer?
The state specifies the installation of wind speed meters for outdoor cranes!AskMore than how many meters need to be installed, or as long as it's outdoor, it needs installationChasing the answerThe provisions of the People's Republic of China national standard GB 6067.1--2010:9.6.1.1 high speed cranes for outdoor work shall be equipped with an anemometer. The anemometer shall be installed on the windward side of the crane.9.6.1.2 high speed cranes for outdoor work should be equipped with an air speed alarm that displays instantaneous wind speed, and when the wind speed is greater than the working wind speed setting value, the alarm signal should be sent out.
Q:How much should the verticality of a tower crane be controlled? Thank you
No, the wind speed is not more than 3m/s, the independent state tower (or attached state highest attachment point above the tower axis) lateral verticality tolerance is 4/1000, the highest tower axis perpendicularity allowed attachment line below the point of difference is 2/1000.
Q:What are the four major moving mechanisms of a tower crane?
Four big bodies of tower crane: lifting, slewing, luffing and walking.
Q:What does "slewing up" and "under rotating" in the slewing form of a tower crane mean?
In short, when the tower rotates in the form of a tower, the tower is stationary (ie does not follow the rotation), and the form of the lower turn is the tower will rotate.
Q:Protective earthing resistance of tower crane
Q:What are the safety devices in a tower crane?
(1) lift height limit position limiterFor cranes with variable boom angles, the lifting motion must be stopped immediately when the top of the lifting device rises to the 8OOmm at the lower end of the boom.For luffing cranes, lift the top of the hook to the lower end of the frame 500mm. The lifting movement must be stopped immediately.(2) lifting moment limiter and maximum lift limiter;When the lifting torque reaches 90% of its rated value, the lifting torque limiter shall be able to issue an acoustic or red light to indicate the alarm. When the lifting torque exceeds its rated value and reaches 108% of the rated value, the lifting direction and outward direction shall be stopped.If the weight and amplitude indicator are set, the numerical value should be correct, clear and eye-catching. The digital error shall not exceed 5% of the indicated value.When the lifting weight exceeds the maximum weight, maximum lifting weight limiter should emit light or sound alarm, when the load exceeds the maximum weight of 6%, should stop to enhance the direction of movement, but to allow institutions towards the down direction.(3) amplitude limiting deviceA crane shall be equipped with a minimum amplitude limiter and a device for preventing the boom from rebounding backward. The trolley must be equipped with a trolley switch and a terminal buffer.(4) rail clamping device and walking spacing deviceTrack type tower cranes must be equipped with rail clamps. A walking limit device shall be installed at the same time.(5) anemometer;For cranes with a hinge height of more than 50m at the root of the boom, a anemometer shall be installed at the top.(6) lightning protection and anti electromagnetic wave induction device;For the crane whose hinge height is over 50m, the lightning arrester shall be installed according to the actual situation and the electromagnetic interference shall be taken.(7) tower crane shall install limit torque coupling in order to prevent slewing overload.
Q:How many meters does the tower crane installation height require expert proof?
The installation, disassembly and jacking of tower cranes must be carried out by experts
Q:What is the minimum radius of a tower crane?
Luffing jib crane luffing mechanism to control the lifting radius, which is lifting and landing boom.At the minimum radius, the boom is angled to the vertical. The higher the rise, the larger the angle, the smaller the radius.I wonder if it's this angle? Hope to be of help to you,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range