• CMAX  DOUBLE MAST ALUMINIUM AERIAL WORK PLATFORM System 1
  • CMAX  DOUBLE MAST ALUMINIUM AERIAL WORK PLATFORM System 2
  • CMAX  DOUBLE MAST ALUMINIUM AERIAL WORK PLATFORM System 3
CMAX  DOUBLE MAST ALUMINIUM AERIAL WORK PLATFORM

CMAX DOUBLE MAST ALUMINIUM AERIAL WORK PLATFORM

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
2000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


CMAX  DOUBLE MAST ALUMINIUM AERIAL WORK PLATFORM






FAQ

1.      why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period. 


Q:Construction basket for hanging basket
Hoist is a power component of suspension platform, and electric climbing structure is adopted. Hoist driven by electromagnetic braking three-phase asynchronous motor, drives the wire rope conveyor structure make the elevator work along the wire rope up and down movement of the worm and a pair of gear, thereby driving up or down suspension platform.
Q:What is the power of the zlp630 electric basket?
At present, the use of electric basket has gradually become a trend, in the high-rise building construction, installation, maintenance and construction of curtain wall insulation cleaning exterior wall has been widely recognized by higher operation, and can be used for large tanks, bridges and dams and other operations.
Q:What are the lifting modes of the electric gondola?
Lifting machines have different lifting methods and different installation positions, so the two hoists have two different mounting processes. Hoist hoist is installed at the top of the building lift, give up the arm instead of pulley operation, all lifting is controlled by the roof of the control personnel
Q:In architecture, more than 100 are not allowed to use a 7.5 meter gondola, aren't they?
If the Ordinance is to be taken as the basis, the answer is really not. According to the Ministry of housing "construction tool Scaffolding Safety Technical Specifications" 5.5.14 hanging basket height 60m and below, should use no more than 7.5m long bottom basket hanging height at 100m and below, should choose the long side of not more than 5.5m a platform; hanging height above 100m, should use no more than 2.5m a platform.
Q:What are the structural components of an electric gondola?
The force exerted on the building or structure by the suspension mechanism shall be in accordance with the carrying requirements of the building structure. Figure two, 2, 1 before the beam front bracket 3, inserted rod 4, 5, 6, beam beam connection sleeve 7, 8, 9, the support weight on pillar 10, strengthened steel wire rope 11, rigging screw. The suspension mechanism comprises a front beam, the middle beam and the back beam, a front bracket, on balance, strengthen the pillar, steel wire rope, plug rod, connecting sleeve and other components, before and after inserted in the beam, flexible regulation. In order to meet the requirements of work environment, by adjusting the inserting rod height to height adjusting beam before and after adjusting the height of 1.15 ~ 1.75m, front and rear bracket with roller, can be used to move the suspension mechanism, the weight of the quantity according to the corresponding model configuration.
Q:Electric basket acceptance should pay attention to what problems?
The installation and disassembly of the basket (including the two shift) is carried out by the property right unit. Basket installation and disassembly (including the two shift) before, should develop the installation and disassembly program, and reported to the general contractor units and supervision units for the record, while the installation of workers to carry out safety technical disclosure. The general contractor shall ensure that the installation conditions are met at the site. The installation and disassembly of the basket (except the Porter) shall be valid for the construction operation qualification certificate of special construction operation. It is forbidden to install or disassemble the gondola without permission.
Q:Construction; basket; detection proportion
However, the supervision of different places is different, because the height of the operation basket is not long, and some areas do not attach importance to the detection of the hanging basket at high altitude, and have not received the inspection and acceptance in time. From the provisions and personal safety considerations, should be timely organization, testing and acceptance. There are testing units for mechanical testing, qualified to put into use, and reduce security risks. Simply put, after testing and then put into use, in case of accidents, supervision units and construction units will be much smaller responsibility.
Q:Who has a good way to clean the basket and the basket?
2, the timely removal of electric basket safety lock surface and the safety rope on the debris, pay attention to safety protective measures to avoid debris into the lock, causing safety lock failure and failure. Avoid collision safety lock operation, operation good protection, prevent rain, snow and other debris into the safety lock in
Q:How much money one day rental basket
Look at the duration of the tenant, half a year would be 50 yuan, a month on the expensive, at least 70, the cost must be tenant out.
Q:Construction basket use, need to the quality supervision department for the record?
The basket providing unit (the rental unit and the unit for the purchase of the basket) is responsible for the quality of the basket provided. Each unit should provide a basket number (stamp should be permanently marked with numbers), management records set up special basket installation, use and maintenance etc., establish the safety management system and operating rules; equipped with effective protection, limit and other safety facilities and equipment, safety compliance national, industry and the requirements of the relevant standards.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords