CMAX 800B Series Hydraulic Static Pile Driver for Sale

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

CMAX Series Hydraulic Static Pile Driver for Sale

ZYJ series hydraulic static pile driver is the product for building pile foundation construction under the independent research and development of our company and with more than 10 national patented technologies. It is a novel environmentally friendly construction equipment characterized by no pollution, no noise, no vibration, fast pressing of pile as well as high pile quality, and represents the development direction of piling machinery. Since mass production, its domestic market share has been firmly first, and our company has become a professional enterprise with research and development, production and sales of domestic pile machine taking the lead. The product won the second prize of the State Scientific and Technological Progress Award in 2003, becoming the famous-brand product of Hunan. Our company participated in drafting the Hydraulic Pile Driver industrial standard (JB/T11674 2013), which greatly promotes the development and progress of technology of static pile driver and pipe pile industry in China. Our company completed the upgrading of product design in 2013 to comprehensively improve the configuration, performance and quality, and the products are well welcomed and praised by the customers since it was put on the market.

 

Feature:

1. High-efficiency and energy-saving piling system with quasi constant power

2. Humanized driver cab and concise and clear control console

3. Piling oil cylinder and motor pump set with scientific and reasonable matching

4. Patented technology - fast return of piling oil cylinder

5. Clear and simple hydraulic piping layout

6. Patented technology - multipoint pressure-equalizing gripper mechanism

7. Unique "side piling and angle piling" device

8. Steel H-shaped pile can be pressed into the trapezoidal and triangular piles according to customer requirements.

9. Simple structure and easy transport

10. New hydraulic walking chassis

11. New patent – side piling device

 ParameterZYJ800B
Dimension Length mm 14100
 Width mm 8680
 Height mm 3125
tf Max.piling force802
m/min Max.piling speed5.3
Travel CapacityLengthwise m 3.6
Widthwise m0.7
Angel °
Standard crane modelQY16C
Grounding Pressure(Kpa)Long ship137
(Kpa)Short ship190.5
Side pile distance mm670
Comer pile distance mm1430
Max round pile mm6016/Y60F45
Max square pile mm6036/Y60F60

Cases


FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What's the difference between a amd bulldozer and a pile driver?
Pile driver fx4300 83506300Bulldozer fx4100 61008300The fx4300 specifications are weaker than 4100 (three slow), but benefit from the architecture process instruction set improvement. The performance is similar to that of, and the fx4100 performance is similar to 640.
Q:Can the piling machine be built at night?
In residential areas, generally do not allow night construction! Hello, I am a driver of piling machine, buy machines, contact me with workers!
Q:Highway guardrail, piling machine, drilling, piling price
Look at what the ground looks like, 0635-5454-588
Q:What is the maximum CPU of a pile driver? What about the performance of graphics will be piling machine CPU?
Independent graphics card is better than integrated graphics card, and now the core is equivalent to the most low-end independent graphics card performance.
Q:How many meters per day can a foundation shovel in Luoyang be 80 centimeters in diameter? Is it easy to damage?
About 8 meters per hour, durable, bad, are spare parts, such as wire rope, brake, triangle belt, but do more work, it will earn!
Q:Requirements of waveform guardrail column piling skills training program and training program.
B, anti blocking blocks, wave beam, end installation(a) after installing the upright column, the bracket (block block) can be installed. The bracket (stop block) is fixed between the wave beam and the upright post through the connecting bolt. The bracket (block) shall be adjusted to make it in place before tightening the connecting bolts.(b) the wave beam is spliced with each other by a splicing bolt and is fixed by a connecting bolt bracket (an anti blocking block), and the direction of the overlap of the roadbed guardrail and the corrugated beam is the key of the installation, and the installation is carried out in strict accordance with the drawing. The direction of overlap shall be consistent with the driving direction. The wave beam should be adjusted continuously during the installation. Therefore, the connecting bolts and the splicing bolts should not be tightened too early so that the long holes in the corrugated beam can be adjusted in time during the installation process so as to form a smooth alignment and avoid local irregularities. When the alignment of the guardrail is considered satisfactory, the bolt can be screwed at last. The connecting bolt between the bracket (stop block) and the wave beam should not be screwed too tight, so that the temperature stress can be adjusted by using a long round hole.(c) the end beam is spliced with standard section guard bars through splicing bolts. The construction method of the end beam is basically the same as that of the wave beam.
Q:How do I maintain the hydraulic pile driver I bought?
the workload of the project; the geographical environment of the project; and the price the boss expects.
Q:Will the crawler auger / pile driver dig out the soil and put it aside or can it be removed far away?
According to the length of the pole of the pile driver, the distance is different.
Q:How does a cement pile driver work?
It's like the principle that we hammer a nail. Use gravity to press down.
Q:How many working surfaces are left in the long spiral pile driver?
General 50-80, the best drill pipe can be connected, but the construction capacity of pile driver is limited, generally there are more than 20 meters, more than thirty meters, high rack will be able to play deeper.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range