Climbing Frame Water power scaffolding for construction

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 m.t.
Supply Capability:
5000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

The leading boiler scaffolding manufacturer in China which possess of national patent of boiler scaffolding (Patent No: ZL 01 218702X).

With 15-year experience and latest computer aided design technology, we can make special design and products according to the boiler’s specification and requirement.

    Our boiler scaffolding systems are widely applied to many power stations and get good reputation with fast, safe and efficient features.

 

Competitive Advantages:

 

>Complies with International Safety Standards of BSEN 1004:2004  

>Lightweight and high tensile aluminum alloy tubs and castings weighing as little as one   fifth of an equivalent steel system  

>With simple interlock system ensuring trouble-free Installation with no welding or tools required  

>With the foldable units module ensuring fast erection, e.g.: about 25 hours for the boiler installation of a 500MW  

>With the diversified foldable units making sure of functional uses  

>Significant revenue savings with less down-time and lower fixed costs  

  For instance, for a 600 MW power plant, if it costs RMB 0.18 per degree of  electricity in China, and it can save about 40 hours downtime with Kangde Aluminum Scaffolding , so a power plant can save cost in a overhaul work as the following :
   40 hours* 600MW/h*0.18RMB/degree=RMB4.23million =USD630,000

>High durability and stability with no maintenance required  

>Technical support throughout the project stage from design to installation  

>With 15-year experience in design, production, sales and technical support as well as after-sale service. 

>With recorded experience in the design, production, sales and technical support as well as after-sale service for more than two hundred boiler access systems. 

>With the high tensile unique tube specially for cold-formed joint system ensuring 20-year longevity Warranty

Parts of Performance list for Electric Power Station Boiler Aluminum Scaffolding

Draft tube scaffolding for Pengshui Hydropower Station of Datang International Group
Draft tube scaffolding for Chang River Electric Power Limited Company
Boiler scaffolding for Fengzhen Power Station in Inner Mongolian
Boiler scaffolding for Jiujiang Power Station in Jiangxi

Boiler scaffolding for Erdusi Power Station in Inner Mongolian
Boiler scaffolding for Datang Tuokrtuo Power station in inner Mongolian
Boiler rush maintenance scaffolding for Daihai Power sastion in inner  Mongolian
Boiler scaffolding for Panshan Power station

Boiler scaffolding for Haerbin Third power station
Boiler scaffolding for Huaneneg Qinbei Power Station

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Erection of scaffolding accessories
When the scaffolding height of more than 20m, should be in the scaffolding outside every 4 steps to set a level of reinforcement bar, and even walls should be in a horizontal layer set pieces; set of longitudinal reinforcement bars should be continuous, and the formation of the level of closed loop; on the bottom step lower door frame scaffolding should be sealed in the mouth bar, door frame and should be located on both sides of long rod should adopt sweeping bar; fastener rack pole fastened by. Construction should pay attention to the door frame and accessories should not be mixed with the same hand rack.
Q:How to calculate the fastener type steel pipe scaffold
1 "Uniform provisions" on the scaffolding structure design calculation method?1.1 requirements for design methods and design requirements1.1.1 stipulates that the scaffolding structure will be based on the probability theory based on the limit state design method (referred to as the probability limit state design method, that is currently China's engineering structure design method) for design.
Q:Bracket cast in situ beam bracket must use bowl buckle scaffold
No mandatory provisions.JGJ1622008 construction formwork safety technical specifications, is the latest specification
Q:The construction scheme of high rise and external cantilever scaffold!
Quality standard for 3 foot hand frame fittings(1) steel pipe: steel pipe is generally used outside the 48mm, the wall thickness of 3.5mm steel welded pipe No. 3,The chemical composition and mechanical properties can meet the national standard "carbon structural steel" (GB / T700). The vertical rod, longitudinal rod (rod) tube length is 4~6m, horizontal bar (small bar) is generally 1.2.3m. steel pipe should be coated with anti rust paint.
Q:What are the requirements for the construction of the scaffolding structure?
The invention also provides an anchoring device for anchoring a scaffold structure to a building. Arm with longitudinal axis. The anchoring device further comprises an anchoring device which is fixed to the building by the anchoring device and the scaffold structure.
Q:How Long Will My Scaffolding/Industrial Piercing Take To Stop Being Sore?
No, actually, it takes 8-12 MONTHS to heal, by your 8-12 weeks I'm going to guess you went to the mall? Well, first of all, the gun uses blunt force trauma and a dull stud to rip a hole through your ear, plus that 'cleaning solution' is crap and will delay healing. There's a good chance it shattered your cartilage, so you could be in pain for months like I was (2 months of extreme almost constant pain, another 3 of dull aches with extreme pain when ever something brushed it and a final 6 of pain just when something touched it). So, yeah...get ready for the long haul.
Q:Latch type disc scaffolding accessories are national patent products?
Disk lock scaffolding called socket type Pankou scaffold.Pankou scaffolding is a new scaffold, the products imported from Europe in the last century in 80s, is the product after bowl-scaffold upgrade
Q:scaffold piercings? what do you think?
sounds hott!! XD take alot of advile or novacain before you get it done, trust me it works!
Q:Can anybody provide me the formula for calculating scaffold volume on circular tank?
Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
Q:How much more painful is the scaffold/industrial piercing opposed to a normal cartilage piercing?
its like 37 million times worst! its really painful [Pro-Sarcasm™]

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range