Climbing-Bracket CB240 & CB210 for formwork and scaffolding system

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Climbing Bracket CB240 & CB210


They are framework brackets for supporting large-area wall formwork.

Typical applications for the CB240&CB210 are pier and column/shear wall/core walll/ in the

building.

CB210 has smaller size than CB240, it will be cost effective in some condition.


Characteristics:

◆ High bearing capacity

The high loading capacity of the brackets allow very large scaffold units. This saves the number

anchor points required as well as reducing climbing times.

◆ Simple moving procedure by crane

Through the strong connection of formwork together with the climbing scaffold, both can be moved

as a single climbing unit by crane. Thus valuable time-savings can be achieved.

◆ Fast striking process without a crane

With the retrusive set, large formwork elements can also be retracted quickly and a minimum of

effort.

◆ Safe with work platform

The platforms have assembled firmly with bracket and will be climbing together, without scaffolding

but can work safely in spite of your high location.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:On the problem of precast box girder formwork
It also does a patent content, I think he just give you a map, is estimated to have worried about this patent is people steal it.
Q:What is the 86 series steel formwork
Steel template (also called undismantled Mould Network) can replace the wood template, significantly reduced usually with wood, plywood, steel plate or other traditional sealing template on the pore water pressure and the pressure in the bubble concrete elimination; steel template (undismantled Mould Network) structure of concrete casting, forming an ideal rough interface. Do not need to rough cutting operations can enter the next construction processThe utility model can be placed before installing the reinforcing steel bar, and can also be placed after installing the reinforcing steel bar. If it is installed before the installation of steel, easy installation and easy to install; concrete pouring process can be visually monitored, thereby reducing the risk of the emergence of pores and honeycomb structure and other phenomena.
Q:What are the advantages and disadvantages of the application of the steel formwork and the plywood formwork in the construction?
From the aspect of Construction: the construction speed of the large steel formwork is fast, the quality effect is good; the wood formwork is assembled slowly, and the bulging phenomenon is easy to occur;
Q:PVC building template introduction
PVC building template is also called wood plastic formwork, plastic formwork, plastic formwork.PVC building template is an energy-saving and environment-friendly products, after the wooden template, composite steel formwork, bamboo plywood, all steel template and a new type of product. Can completely replace the steel formwork, formwork, timber, traditional energy saving and environmental protection, low cost amortization.
Q:Are all steel plates used for beam slab prefabrication
If all steel plates are used for precast beam and slab, the shape of prefabricated components should be adopted
Q:Want to ask the difference between the steel template and wooden template
Can use a combination of steel templates can also be used in large format steel formwork
Q:The difference between concrete and steel formwork
At the same time, the steel formwork concrete formwork, the concrete surface is smooth and beautiful, is a good way to die in the process of transport is not easy deformation.
Q:Complete sets of the ballast wall, vertical wall, curtain board design drawings of steel formwork
The design of the steel formwork is 1.5 meters long or the length of 2 meters, so it can save the cost and improve the work efficiency
Q:New building formwork support is all steel
The sun angle is used to connect with the cross beam of the outer wall to ensure the angle of the shear wall. The angle of Yin is used for turning the inner wall and connected with the cross beam to ensure the angle of the shear wall. The pull rod is composed of a ground hook, a rod adjusting screw rod and a buckle. Buckle hook and prefabricated description on the ground to draw connection on the top of the connection with the beam through the adjustment screw, ensure the verticality and location of transverse shear wall [hole hole] bar bar bar need to connect with a hook head bolt fastened through wire rod, ensure the transverse shear wall in the doorway of the width and size requirements. The through wall screw is composed of a screw rod gasket and a nut which are used for fastening the crossbeam and the door card. [] similar to the fan-shaped nut fastener gable wall screws for fixing the bayonet.
Q:What are some of the components of the combined steel template, what role?
Two, the main equipment1, mechanical equipment, drill, grinding wheel cutting machine, according to the circular machine, electric wrenches and welding equipment, etc..2, the main tool hammer, iron ruler, steel ruler, wrench, wire brush, brush. Drums, crowbar, screwdriver, theodolite, level. Tower ruler.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range