Product Description:

1. Product Description:                 
Our product was proved as good physical and mechanic performance, high tearing resistance, strong deformation adaptability, puncture

, aging, ultra-violet radiation, oil and salt, alkali and corrosion resistance, good waterproof, drainage, anti-seepage and damp proof effects

1.used in landfill caps

2. base liner applications under roads, railways,

3.They are also used for waterproofing of buildings and other similar structures.

Product  Aplication:

1), Environmental protection, sanitation (such as solid waste landfills, sewage treatment plants, power plants Chi-conditioning, industrial, hospital solid waste, etc.) .

2), Water (such as rivers, lakes and reservoirs of the anti-dam, plugging, reinforcement of the canal seepage, the vertical wall of the heart, slope protection, etc.).

3), Municipal Engineering (subway, on the ground floor of the building, planted roof, the roof garden of anti-seepage, sewage pipes lining, etc.).

4), Petrochemical (chemical plants, oil refineries, gas storage tanks of the anti-chemical reaction tanks, sedimentation tanks of the lining, etc.).
3.Product Specifications:        

1.thickness : 0.1--3.0mm,

2.Length: 50 m -100 m ; width: 4 m -8 m ( according to customer needs )

3.Elongation at break:700%

3.Material: HDPE.

4.Color: Black or as required

4.Reference Picture:


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is it good to use wall decoration film when decorating the house?
In terms of environmental protection, compared to other interior decoration materials, side effects of wallpaper on human health are the minimal. However, as a raw material, the wallpaper is a single product. It should not be forgotten that varnish and wall paper adhesive are painted before the wall paper is laid. At that time, form of the wallpaper has changed a lot. After the wallpaper is paste up, the adhesive is covered behins the wallpaper, making the formaldehyde difficult to volatile, so the release cycle of formaldehyde in wall paper is relatively longer than in wall paint. Wall paint also contains formaldehyde, but construction procedures are relatively fewer than that of wallpaper. In comparison, after the latex paint is brushed, the formaldehydewill be bascially volatile in three days and have no smell left after 15 days.But another type of pollution, mercury and lead, existed in wall paint.After the walls are painted, some children will touch them with the hand or are used to sucking their fingers. In this way, mercury and lead in paint will have an impact on the their body. Europe and other developed countries also considered the paint as the best choice for interior decoration as early as forties and fifties, but the paint is barely used now.It is seen from the above that both wallpaper and wall paint have their own environmental problems.So, on the one hand I do not recommend you to lay wallpaper all over the house; on the other hand, we also have good reason to choose wallpaper as the effect it creats can not be reached by wall paint.
Q:Where are construction geomembrane in ash dam?
Geomembrane and other geotechnical materials are fixed with anchoring ditch in the middle of side slope. There are construction team and welding equipments.
Q:How to measure the loss of geomembrane joints and related specifications?
In general, the construction of the geotechnical membrane is mainly by welding, and the lap width is confined to the requirements of the specification. According to the requirements of "the lap width of the sanitary landfill field seepage systems engineering and technical specifications CJJ113-2007 ", lap width of geomembrane: sweat soldering: 100±20(mm) squeezing welding 75±20(mm). According to our factory's experience, in general, the overlap loss of the geomembrane is between the 5%-8%, that is, for each1000 square meters of geomembrane, the loss is 80 square meters to 50 square meters. Construction site whose environment is relatively simple can calculate the loss according to 5%, complex construction site can calculate the loss according to 8%.
Q:How to deal with oil slick on fish tank?
1. Using the oil slick processor to make the oil slick into the filter, and then using the filtering cotton in the filter to adsorb, at last decomposing bacteria by nitrobacterium. 2.Collect oil slick in the cup slowly and then dump it. 3. Use oil-absorbing sheet to absorb, put an oil-absorbing sheet at the opposite corner(oil-slick aggregated area) of water outlet to absorb oil slick. 4. Install trumpet funnel commingler to absorb oil slick, mix it with water, and it will be decomposed through absorption by filtering cotton. 5. Remove contamination in the filter. 6. Feeding fish which lives on oil such as highfin coralfish or black mollyack, which can reduce the film production.
Q:The difference between the double rough surface soil and the ordinary soil?
Ordinary geomembrane generally refers to both sides is double smooth geomembrane smooth rough texture, the national standard GB GB type, type two and urban construction standard (equivalent to American Standard) of the points, the thickness is generally between 0.2-2.0mm. The double rough surface soil engineering film is a soil film with coarse grain on both sides, and the urban construction standard is only accepted by the national index. General thickness is between 1.0-2.0mm
Q:The repair method and quality inspection of composite geo-membrane construction defects.
It's really hard, first melt the geotextile with iron plate, pay attention to the melting degree, half exposed of PE film is ok. then use a layer of one fabric and one membrane film to connect it, and it's suitable for the film over 0.4, the thin film can only be pasted with PEglue. you can pull up the repair part and put water into it for inspection. you must leave some cloth while construction, otherwise, high pressure will makes the repair parts crack.
Q:How no proceed glass film on non-glued electrostatic membrane?
Non-glued electrostatic membrane has three layers, just like a mobile phone film.Firstly,tear apart the first layer, stick it on the glass and then tear apart the surface film. Keep the middle layer, or only two layers, and tear apart one of them and stick. Then done.
Q:How much does the electrothermal film cost?
Electrothermal film heating costs is electric charge. the power of a square meter is generally about 110W-130W. No matter what temperature you want to set, as long as it is working, the cost is 130W/N hours/square meter. A kilowatt hour, you can calculate on your own. National standard energy-saving is 65%, the heating watt per square meter is 50 to 70 W, 110 to 130W is the standard before 2005.
Q:Which is better, domestic or imported geomembrane?
Although China is now also developing geomembrane, but also it is just at the beginning. Foreign environmental protection course is earlier and more developed than China's. So we have to admit that foreign HDPE geomembrane is more quality than domestic geomembrane. Although domestic geomembrane is cheaper, most of the domestic geomembrane use reused materials, so service life is greatly reduced, which is known to all. While imported HDPE geomembrane, such as geomembrane produced in Canadian Solmax International Inc. do not use reused materials, so the quality is absolutely guaranteed. Moreover, Solmax International Inc. is the world's largest and most professional supplier of HDPE geomembrane. So I think imported geomembrane has higher cost performance ratio!
Q:Is electrothermal film a big consumer of electricity?
Electrothermal film is very energy saving and comfortable.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range