Circular Column Formwork Outrigger for Scaffolding

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 set
Supply Capability:
50000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Circular Column Formwork Outrigger For Scaffolding

Developing with new technology materials, steel formworks is no longer a must in construction concrete process. More and more buildings are established with plastic formworks. And workers love this new formworks much more.

The advantages of plastic formworks:

1.First of all--light

Yes it is the first advantage of plastic formwork. It wins the great praise of both contractors and workers.

The biggest panel is 120×1500px,weights 10.5kg only. It can be lift and set up by one person easily, which means there is no need for cranes on site.Saves a lot of cost and time.

2.Easy set up

Different size of panels can firmly locked by simply turn the special handles to 90 degree. The Panels has rib on the back, which makes the system need not traditional wood blocks and nails. The panels have holes to fit tie rod, guarantee the strength of the whole system.

4.Strength

The handles are made by high strength Nilon, each panel locked by at least 4 handles, which makes the whole system strong enough to pour 1000px walls.

5.Environment friendly

The system needs no cut and nail due to the variety size. Also it needs nearly no wood. The material can be recycled after broken, so it will not pollute the environment.

6.Consequent

Concrete does not stick to plastic formwork, thus the panels need no oil before using, and can be cleaned simply by water. The surface of the wall which build by modular formwork is smooth and without rework.


Circular Column Formwork Outrigger for Scaffolding

Circular Column Formwork Outrigger for Scaffolding

Advantage

* Good loading capacity

* Easy to assemble and dismantle

* Stable and durable thanks to its structual design & automatic welding quality

* Customized solution helps you work safe, save cost and convenient

* Excellent quality for formwork & scaffolding

 

Packing

in bulk or in bundle, or as requested

Shipping

   15-20 Days.

Normally small orders, it needs just 15-20 business days to the port.

 

Other scaffolding & formwork products:

(1)   Scaffolding System:

Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Kwikstage Scaffolding System and accessories; Haki Scaffolding System and accessories;

(2)   Scaffolding Frame & Accessories:

Including Walk Through Frame Scaffolding; Ladder Frame Scaffolding; Accessories; we also can make scaffolding according to your samples or drawings.

(3)   Scaffolding Couplers/Clamps:

We can produce all kinds of forged and pressed couplers, including British type couplers, American type couplers, German type couplers, Italian type couplers ,fence couplers, BRC coplers and so on. We also can produce according to your drawings or samples.

(4)   Formwork System Scaffolding & Accessories:

Light Duty Shoring prop and Heavy Duty Shoring Prop; Wing nuts and Tie rods; RASTO clamp and so on.


FAQ 

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Stone curtain wall steel frame in the 90 degree angle of the horizontal frame connection
And then set the angle of the vertical keel on the corner of the intersection.
Q:Cross stitch mounting, with steel frame or wooden frame
With the expansion tube, self tapping screws into the first, tapping screws do not fully drill into the back of the exposed 0.5cm,
Q:The role of building templates
11, composite plastic building template12, the structure of the combined structure of the template13, tempered glass combination template14, reinforced concrete component forming combination template15, steel frame plywood formwork16, the construction of light body template17, chemical building template production process and chemical formula18, the use of the heat preservation of the wet form
Q:Frame structure calculation of the material, the template area, and how to calculate the square
(two) the construction of the deployment of 1 construction organization, according to the characteristics of this project, the company decided to set up a clever and capable project manager, construction team during the fight in the diversion project construction, and key projects included in the company's 2003 annual, as the focus to ensure in human, financial and material. The tree image, a brand, and always will be the quality, schedule, safety thread throughout the construction process, to ensure the realization of the goal. (1) the project decision-making level, composed of the project manager, deputy manager, technical director of the project exercise, organization, coordination, control, supervision and command functions. The project manager shall be entrusted by the legal representative, and shall be responsible for the execution and completion of the contents of the contract agreement signed by the company and the owner, in charge of the financial and personnel arrangements
Q:Channel steel frame does not bear the external load is how to place
Channel steel frame do not bear the external load, how to place according to the use of function to determine
Q:Who used, how not universal.
This product is a kind of engineering plastics, which is made of polypropylene, which is made of GF fiber and anti aging agent. It is a new generation of building formwork with plastic instead of steel (bamboo, wood). The product has the following characteristics:
Q:How much is the glass door with a frame
Aluminum alloy frame tempered glass (8 mm glass), 320 yuan / square meter, artificial 60 yuan / square meter
Q:The following is a two storey steel frame to be done on the top of the door 9 meters high
The steel frame can be directly input into the portal frame
Q:100 tons of light steel frame steel structure connecting plate
In that they have a fixed partner, the same material and different people to buy in the price also has the advantage, to buy their own words to what they do the construction cost will be very high risk, and to buy their own materials, then there might be the pit, they eat a thankless, suggestions all out
Q:How to define the structural system of the upper part of the bottom steel frame
Modeling method: it is recommended to use the "portal frame three-dimensional design" model, the model established in the face of each frame, the lower frame can be set up directly by the grid or mezzanine. After the completion of the building will be built into the tie rod (vertical frame beam can be tied to the input), the longitudinal beam is not built. Roof horizontal support, inter column support can be modeled in this.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range