china formwork steel cuplock scaffolding

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

aterial:

Q235,Q345

Surface treatment:

Painting, zinc plate, or Hot-Dip Galvanized

Certificate:

SGS,BV,CE,ISO9001:2000

Standard:

BS EN10025,JIS G3444-2006,GB/T 3091-2001, ASTM A106-2006, API 5L

Thickness:

12-18mm

Inspection:

With Hydraulic Testing, Eddy Current , Infrared Test

Brand:


Delivery time:

Within 25 days

Packaging:

Pallet

Packaging & Delivery

Packaging Detail:Pallet package or in bulk according to your requirements.
Delivery Detail:Within 15-20 days after receiving your deposit

Specifications

1. formwork steel cuplock scaffolding 
2.Professional manufacturer 
3.Certified by SGS,BV,ISO 
4.Timely delivery

Specifications

 

Ringlock component

Specification (mm)

Weigtht (kg)

Material

Standards with Spigot

500

3.09

Q235/Q345

1000

5.49

1500

7.90

2000

10.30

3000

15.11

3500

17.51

Ledgers

750

3.20

Q235

1000

4.07

1065

4.31

1200

4.78

1500

5.88

2000

7.56

2200

8.30

2500

9.35

3000

11.13

Ladder

3000

17.80

Q235

Braces

750x2000

9.18

Q235

1000x2000

9.47

1500x2000

10.31

2000x2000

11.40

2500x2000

12.67

3000x2000

14.06

 

H frame & L frame scaffolding

 1)Size 1219X1700mm or 1219*1930mm,1350*2000mm,1350*2500mm,

      1350*3000mm

 2)Material Q235 or Q345

 3)Finished painted or galvanized ,powder coated

 4)Tube size 42mm*2.0mm and 25.4mm*1.8mm

 5)Weight 18.5kg. 13KG

 6)4 feet x 6 feet or other size can be done also.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:in the scarlet letter, what events happen at the scaffold during the night??
On the Scaffold Dimmesdale is really starting to go crazy. the guilt in his heart about loving hester is eating him up. he goes onto the scaffold thinking no one will see him. he is punishing himself. he yells out and thinks that it will be the end of his secrect but no one hears him. they just think he is the cry in the night. then reverend wilson comes along. but he doesnt see dimmesdale. then hester and pearl walk by they notice them. they come up on the scaffold. Pearl asked dimmesdale if he would stand with hester and her at noon the next day but of he says no that he will only stand with them on Judgement Day. then they see the scarlet letter in the sky and the town people thought that it was just an a for angel because the gov passed away. they next day wilson finds dimmesdale's glove on the scarrold but he thought that the devil put it there. i cant remember what chapter it is in but it is toward the middle good luck with the book i loved it
Q:Painters on a scaffold physics help!!?
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:How to maintain the scaffold after use
Tool type scaffolding (such as door frame, bridge frame, hanging basket, receiving table) in the removal of the need to stop the maintenance and timely maintenance, and supporting storage.
Q:Could someone please tell me a very simple scaffold on writing commentary?
To know about College and university! log on to alumne.net/
Q:Hello! How much does a scaffold piercing cost... on average?
I paid around $55 +tip for mine but it varies from place to place...just call the place you plan on going to and ask them how much they charge.
Q:Can anyone give me a detailed design of a simple scaffolding?
can't draw here, but it's just an x with a flat board on top in 3 dimensions.
Q:how can i prevent my scaffold piercing from getting keloids/infected?
regularly clean it with salty lukewarm water and cover it up with tape
Q:21M high full scaffold erection scheme
dismantle4.1 the accurate preparation before dismantling the scaffold shall comply with the following requirements:1 should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system is in line with the requirements of the structure;
Q:A painter is standing on a scaffold raising at a constant speed. He pushes a can over at 15.00 meters.?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt² 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s²)(3.25 s)² vo = +20.5 m/s
Q:How to calculate the vertical force of scaffolding
The calculation of steel tubular scaffold with reference to "construction safety code for steel tubular scaffold with couplers" (JGJ130-2001). Need to calculate the following eight aspects:

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range