China Factory High Quality 7W PC Plastic SMD Chip 85V-264V LED Globe Bulb Lamp
- Loading Port:
- Shenzhen
- Payment Terms:
- TT
- Min Order Qty:
- 50 Pcs pc
- Supply Capability:
- 100000 Pcs Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
General Introduction
Very long lifespan, LED light bulbs offer a simple way to save money and beautify your home, No UV and IR radiation minimizing discoloration and fading of materials. We promise 2-year-warranty for all the bulbs we manufacture. Universal standard E27 lamp base for easy installation.
Specifications
SMD LED solution, excellent heat dissipation performance.
Energy saving perfect replacement for incandescent bulb and cfl, low energy consumption.
High luminous efficiency as high as 90-110lm/w.
Particularly designed constant current driver for open or short-circuit protection.
Green, No UV and IR radiation.
Environment friendly, no mercury, lead or hazardous materials.
Easy to install, E27 or E26 available. Anti-Vibration, convenient for transportation.
Certificate: CE, RoHs.
Warranty period: 2 years
Usage/Applications
Widely used to replace traditional incandescent bulb, fluorescent light and CFL.
Suitable lighting options for shopping mall, hotel, restaurant, museums, art galleries, cosmetic counters, show window etc.
Customized options
OEM/ODM available;
You can customize the bulbs for large quantity.
Packing & Delivery
Packing:
1 x Bulb
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
By Air | 3-10 business days |
By Sea | 30-40 business days |
3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
"Business days" means Monday-Friday, excluding holidays.
DHL and UPS cannot ship to military or P.O. boxes address
The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
Factory
- Q:In a bulb, the ambient temperature of the LED is LED, the temperature of the air in the bulb, or the temperature of the aluminum substrate
- The heat sink temperature and the temperature of the radiator is not the same, the heat sink through thermal grease or other heat conducting medium to heat to the radiator, the temperature will not coincide. And the temperature inside and outside the radiator is also different.
- Q:Want to buy a few LED bulb, do not know how to identify the quality of good or bad, ask for solution ~!
- See brightness, whether the luminous uniformity, the back of the heat is good?
- Q:What's the reason for the LED bulb strobe?
- Currently on the market with single stage PFC driver circuit, there will be strobe, causing the flash because the ripple is too large. Single stage pFC circuits are not possible
- Q:How did the trademark on the LED bulb go up?
- Laser printing equipment is generally printed up, so that the ridge up color is not so deep, but also can not wipe off
- Q:Can the bulb's true life reach 30000~50000 by LED?
- The theory of the life of LED is one hundred thousand hours, this is not true; but the LED life is far less than one hundred thousand hours, only ten thousand hours, which is currently the most industrialized production of long life; because the quality of the LED part of the core - epitaxial wafer has not reached the ideal state, there are many problems to be solved, such as reducing the dislocation the density of epitaxial film, high quality P GaN preparation etc.
- Q:LED bulb lamp drive power electrical connection, will delay a few seconds before the lamp light, and power creaks, who know what it is!
- How many seconds delay? It won't take so long. How many bulbs do you usually soak in 0.5 seconds? A squeaky noise is usually a transformer or inductance whistle, and at least it shows a poor manufacturing process.
- Q:LED what is the glue between the aluminum base of the bulb and the cooling aluminum?
- It is best not to direct contact with glue, glue because the thermal conductivity of aluminum than a lot of difference, even a thin layer will reduce the heat out of the speed of the screw can be used to aluminum plate and aluminum fastening together, the contact surface is smooth, when necessary, can use some conductive silicone grease amount
- Q:Led what's the flash of the bulb?
- So, this is the power overheating protection at work. It will not be the case if the outer shell is enlarged or the room is ventilated and the heat should be cooled.
- Q:Led the bulb is flashing. What's wrong with it? How do you fix it?
- There are several cases of flashing lights:There is one to three flashes when the switch is switched off. This is due to an incomplete discharge of the electrolyte in the power supply.The power supply is flashing fast. This is the quality of the power supply problems, there are many specific reasons.It is found that the design of the power supply is related to the structural design of the lamp due to the insufficient margin of the power supply and the increase of temperature!
- Q:What does "A19" mean in LED A19 bulb?
- I'm studying too! There's a problem for everyone to discuss
1. Manufacturer Overview |
|
---|---|
Location | Shenzhen,China |
Year Established | 2013 |
Annual Output Value | |
Main Markets | China; Mid East;Western Europe |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Shenzhen |
Export Percentage | |
No.of Employees in Trade Department | 20 People |
Language Spoken: | Chinese |
b)Factory Information | |
Factory Size: | Above 2,000 square meters |
No. of Production Lines | About 3 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Cheap |
Send your message to us
China Factory High Quality 7W PC Plastic SMD Chip 85V-264V LED Globe Bulb Lamp
- Loading Port:
- Shenzhen
- Payment Terms:
- TT
- Min Order Qty:
- 50 Pcs pc
- Supply Capability:
- 100000 Pcs Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products