Ceramic flooring for Floor Heating System

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 m²
Supply Capability:
3000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description:

Ceramic tile for floor heating system.


Specification:


Surfaceglazed, micro crystal 
MaterialPorcelain
Water Absorption<0.09%< span="">
MOQ500 SQMS
Packing Detail600x600mm: 4pcs/ctn 800x800mm: 8pcs/ctn
Colorsblue, brown, white, yellow, black, beige, etc


Features:

1. All products are top grade of ceramic Tile 

2. CE certificate, ISO9001

3. Special size available according to request.

4. Best Quality with best price, strictly quality control.

5. Delivery on time

6. Best after sale service, customer can follow their order situation any time, no matter on product line, warehouse or shipment.

7. Small order accepted.

8. Feature: no fading


Photo:

Ceramic flooring for Floor Heating System

FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:To warm the construction, structure and filler selection and how to coil?
To warm is actually a more complex system engineering, only concerned about the quality of the product is not enough. Do the floor insulation system should be laid before the construction of civil walls have been completed, and done the basic leveling, the venue no other types of construction in the construction. The temperature of the construction room should be in accordance with the required temperature of the pipe used, because the ambient temperature and the bending radius of the pipe are closely related. Cleaning the ground and the wall, the use of level ruler on the ground flatness, within 1 meter height difference is less than or equal to 5 mm. Wall or ground protruding part of the shovel with the shovel, filled with concrete pits on the ground. Bathroom and the bottom of the villa should do a good waterproof layer or laying moisture film.
Q:Components of solar water heaters
Components of solar water heaters...
Q:What are the equipment for the recirculating aquaculture system and which ones have their own design and production capacity?
Many of the environmental protection has its own design and production capacity
Q:What is the difference between a single-fired stove and a dual-purpose stove for a gas-fired boiler?
Single heating can only heat the heating plate or to warm with the use of heating and living can be provided hot water boiler are built-in expansion tank. You have to ensure that near water pressure, at least 0.2MPa. Difference: First, the structure is different: 1.1, warm, bath dual-use machine at the bottom of the machine pipe number 5, respectively: heating outlet, heating outlet, sanitation Water, water and gas inlet; 1.2, the number of single-walled furnace at the bottom of the three, respectively: heating outlet, heating outlet and gas inlet. 2, the plate-type heating bath dual-purpose furnace is generally more than a single furnace to increase the plate, electric tee and other components, casing warm bath dual-purpose furnace heat exchanger structure than a single heating furnace complex. Second, the function is different: warm bath dual-use furnace can provide hot water (shower or living with hot water), a single heating generally do not have this feature (except for special models).
Q:Carbon crystal wall warm how good carbon crystal wall warm advantages and disadvantages
Carbon crystal wall warm how good carbon crystal wall warm advantages and disadvantages
Q:Use the boiler is often used to adjust the minimum number of degrees
Water temperature is 60 degrees minimum
Q:Solar water heater mixing valve pressure balance
Mixing water valve as a temperature control components, mainly for solar energy engineering, to warm the project and other large and medium-sized heating project in the temperature control system Chang Fu Qi Hao Hao Tong Tong profile; solar water heaters, electric water heaters and other products, water temperature control components ; Home, hospital, hotel, nursing home, office and bath bath center, such as independent or centralized central hot water system.
Q:Heat pump air conditioning principle:
When the air conditioner is in the cooling operation, the low-temperature and low-pressure refrigerant gas is sucked by the compressor and pressurized into a high-temperature and high-pressure refrigerant gas. The high-temperature and high-pressure refrigerant gas exothermic (condensed by the condenser) in the outdoor heat exchanger Into the medium temperature and pressure of the liquid (heat through the outdoor air to take away), the temperature and pressure of the liquid and then through the throttling components throttle down after the low temperature and low pressure into the liquid, low temperature and low pressure liquid refrigerant in the indoor heat exchanger heat (The indoor air is cooled and cooled by the surface of the heat exchanger to achieve the purpose of lowering the indoor temperature), and the low-temperature and low-pressure refrigerant gas is sucked by the compressor and circulated as described above. Air conditioning in the heating operation, through the two four-way electromagnetic valve, reverse Carnot cycle, to achieve heating.
Q:What are the disadvantages of carbon fiber heating panels?
Q:Can drive two bedrooms, two groups of small heating furnace heating
Should be based on the area, not between the units

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range