• Ceiling Roof Material System 1
Ceiling Roof Material

Ceiling Roof Material

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

ceiling roof material1.5mx50m
Waterproof Class W1
SD-value 0.02m
Vapor permeability: 2250g/m2/24h
UV re

1) Introduction of  ceiling roof material

  1.    Breathable Membrane is a water resistant membrane but with high vapour permeability, use as diffusion open roofing felts under pitched roof tile or vapour permeable barrier housewraps on timber frame walls

  2.    Breather membrane functions as a weather-resistant barrier, preventing rain from getting into the roof or wall assembly while allowing water vapor to pass to the exterior.

  3.    Breather membrane may also serve as an air barrier if it is sealed carefully at seams.

  4.    Breathable Membrane have good "water resistance", good "water vapor permeability", and good "air barrier properties".

2) ceiling roof material Specification
13-layers laminatedPP nonwoven+PE film+PP nonwoven
2Products range80g,90g,100g,120g,140g,160g/m2.
3Roll size1.5m x 50m
4Water resistantClass W1
5SD-value0.02m
6Vapor permeability>2250g/m2/24h
7UV resistant>3month
8Test to EN13859-1Pass -- CE mark available

3)Key Features of ceiling roof material

1CE certificated, high quality with competitive price
2Waterproof & vapour permeable
3Excellent tensile and nail tear strength
4Good flexibility and ductility
5Light weight and thin, slip-resistant surface
6Simple handling and easy to use
7Energy saving
8Long term durability
9Totally recyclable
10For both wall and roof applications


Q:Bathroom first leveling or do waterproof, what is the difference
Is the first water and then leveling. Home improvement toilet ground specific process practice: 1. The base layer, and which layer with the structural board, with cement mortar wipe. It is recommended to set the floor drain, the grassroots level should be flat and the direction of the leak to the slope. Against the wall and the root of the root should be wiped rounded.
Q:Slope roof drains do not need to be waterproof
In addition, according to conventional settings vertical and horizontal sub-grid, complex structure easy to leak.
Q:How can the toilet waterproof works fail?
Can only do a new waterproof, and now have engaged in the base of the waterproof coating, the effect is very good. It is best to ask professionals to do their own difficult.
Q:Cabinet is to buy finished products, or directly to the decoration company to do?
Do the cabinet can be in accordance with your size, finished cabinet moldy, which is not necessarily. You have to buy some of the Well
Q:What are the materials used in the ceiling?
Kitchen bathroom ceiling material 2: aluminum plate material ????Aluminum buckle board is based on aluminum alloy as the main substrate, through the process to get the finished product, and now the aluminum plate in the use of integrated ceiling in the larger. In the home improvement specifications are generally 300MM * 300MM, 300 * 450mm, 300 * 600mm and other different sizes, because of its excellent board layer, with noise, heat insulation, light weight characteristics, while its color is also more Kind of choice, to meet the different needs of consumers.
Q:Roof sunscreen waterproof layer leakage, brush milk white plastic can solve it?
How to deal with the roof leakage, the roof leaks to find the first leak, looking for the main leak from the roof to the lower to find leakage. The first is to see if there is no cracks in the roof, the original waterproof layer is not aging, the roof of the original SBS waterproofing membrane has no bubbles, there are bubbles to prove that the water has entered the bottom of the waterproof layer, and thus leaking. There is a block on the roof of the gutter is not blocked in the countryside, there are still a large number of tile-roofed house, when the tiles due to damage caused by the roof leakage, as long as the replacement of tiles can be, this step is also known as "
Q:What are the key points and contents of the quality control of waterproof material?
2, ordinary two-component polyurethane: A material is similar to the appearance of edible oil translucent yellowish curing agent from polyether and isocyanic acid by polycondensation of polyurethane prepolymer (about 20,000 yuan / t), B material For the plasticizer, coagulant, fillers and other components of the black liquid (about 3900 yuan / t), after mixing the polyurethane coating is also black. But also because of A, B material of the huge spread so often the following two kinds of fraud: ① with a very cheap black oil (priced at only about 1,200 yuan / t), diluted with xylene after thin coating twice. Cold oil is not easy to dry after the coating, after each coating must be drying a few days, in the winter with roasted, and then do not sprinkle dry powder cement, so a long time paint are dry. ② is often used to expand the proportion of A, B components such as 1: 4-6 (usually 1: 2), but also in the polyurethane mixing process by adding cement powder as a filler, if the stirring is not added xylene diluted Agents and other methods of fraud.
Q:What decoration materials, light and water, and the wall, the perfect combination of glass
Four, pressure glue Hold the 45 ° angle along the gap to press out the glass compound to ensure that the glass compound is in close contact with the substrate surface. Glue gun moving speed according to the size of the gap, the depth of the line evenly move the glue gun, cloth evenly full, do not pile material and broken. When the seam width is greater than 15 mm, need to repeatedly glue.
Q:What is the difference between finished mortar and cement mortar?
Finished mortar white lime compounds, and cement mortar dark gray black.
Q:How to do waterproof bathroom, construction process is what
Second, the construction process: 1, grass-roots treatment: grass-roots surface must be smooth and smooth, there must be no pit phenomenon may not loose, trachoma or hole exists. If the above phenomenon should be smooth and smooth after the construction, the surface must be dry, there must be a pipe at the root of the head must be wiped into a circular arc, the pipe must be strong. 2, brushing the primary treatment agent, the "Liang wall" waterproof primer at the end of uniform mixing, and then use a long brush or rubber brush scraper, scratching the waterproof material, even brush to the grass-roots level, brushing Can not be stacked and exposed white bottom, brushing the amount of each time to 0.4kg / square meters is appropriate, the first time after the full dry before brushing the second time. 点击图标下载 App

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords