Ce And Rohs Approved Famous Led Copper String Light
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 10000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product name: | Christmas LED Copper String Lights |
Length: | 10m-100m(Can be customized accoring customers specification) |
LED Color: | Red, Yellow ,Blue,Green,Warm White,Cool White,Pink,Purple,Multi-color |
LED Space: | 5.6cm,10cm,20cm |
Voltage: | 12V,36V,48V,110V,220V |
Line Color: | Sliver,Black,Green,Red,Copper |
Function: | Flash&Static on&Timer&Remote control |
Package: | Safety export package or customized package |
Certificate: | CE & CPSIA & RoHS&UL |
Feature: | 1.Powered by DC 12V (power adapter NOT included). Durable and heat-resistant silver wire 2.Flexible copper wire can easily build the shapes you want. Can last for 40000+ hours! If one light goes out the rest remain lit! 3.This string light is great for Christmas, party, wedding and other celebration activities |
Product Show:
Our Service:
Need more information about the CE And RoHS Approved Famous Led Copper String Light , please contact our sales team , we will reply you within 10 hours.
- Need find the CE And RoHS Approved Famous Led Copper String Light supplier in China and get the CE And RoHS Approved Famous Led Copper String Light wholesales price ? contact us right now !
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
Factory:
- Q:Building lighting in lighting, lighting should pay attention to what details?
- Like the direction of lighting, we should design a particular direction as the main direction of view in the design.
- Q:What are the energy saving measures for lighting and distribution?
- : the main light source of the building is the fluorescent lamp, and the higher places, such as the lobby, the atrium, the performing hall and so on, should use the ceramic metal halide lamp
- Q:What are some good suggestions for plant energy saving lighting modification?
- The factory is the national advocate energy-saving lighting transformation,
- Q:About the brightness of LED lighting
- LED he's transparent, except for angle astigmatism. Apart from the angle, there is still scattered light.
- Q:How to choose lamps and lanterns? Inventory factors affecting consumer spending
- Data: 68% how to choose lighting: the most popular light channels -- how to buy building materials, lamps lighting decoration: the supermarket to buy things, the owners tend to gather enough patience and wisdom, as to our home decoration into the ideal paradise
- Q:LED lighting energy-saving transformation really good?
- Ed lighting energy-saving transformation, the general use of LED lamps instead of the original fluorescent lamps, metal halide lamps, halogen lamps and other high-power old lamps
- Q:In the application of the following electrical appliances, what is said is incorrect
- Between A, all the lights in a lighting circuit are connected in parallel, so the option A either.
- Q:CREE semiconductor lighting pay no
- The month payment last month wages can be, but Kuayue is illegal; if the company owed wages, workers can go to the labor supervision by the labor inspection brigade brigade complaints, the employing units ordered deadline for payment of wages, fails to pay, have to pay compensation.
- Q:Aomori Festival
- Nebuta (nebuta Festival): Nebuta, it is representative of the resistant cloth, summer festival, Aomori Aomori Hirosaki City, five Sichuan original stand, Mutsu ominato area.
- Q:Does the lighting for the workshop use energy-saving lamps or LED lights?.
- there is mercury pollution in the process of production and after the use of waste;
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Ce And Rohs Approved Famous Led Copper String Light
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 10000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords