Casting Ductile Iron Top Cup and Pressed Steel Bottom Cup for Cuplock Scaffolding System

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Material:

Ductile Iron, Steel Q235/Q345

Surface:

Electro Galvanized/Painted/HDG

Weight:

0.5kgs

Name:

Casting Ductile Iron Top Cup and Pressed Steel Bottom Cup

Catagory:

Scaffolding System

Process:

Casting, Forged, Pressed

Component:

Top/Bottom Cup,Ledger Blade, Standard, Ledger, Bracket, etc

Application:

Highways/Subways, Bridges, Tunnels

Advantage:

Durable, Stable, Skid-proof, Antirust

Manufacturer:

OEM Service is Available





Packaging & Delivery

Packaging Detail:As the Requirment of Clients
Delivery Detail:20days

Specifications

Casting Ductile Iron Top Cup and Pressed Steel Bottom Cup 
Material: Ductile Iron/Steel 
Process: Casting/Pressed/Forged 
OEM

 

 


Product Description


Name:  Casting Ductile Iron Top Cup and Pressed Steel Bottom Cup

Category: Scaffolding system

Material: Ductile Iron/Steel (Q235/Q345)

Weight: 0.5kgs

Surface:  Electro Galvanized/Self Color/Painted/HDG

Component: Standard, Ledger, Strengthened ledger, Transom Beam, Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc. 

Application: Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering 

Advantage: Durable, Stable, Skid-proof, Antirust, Easy to assemble & Dismantle

OEM service is available 

Items or goods can be manufactured according to your standards


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range