Car Port B4

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Car Port B3


Unser Carport System Park@Sol basiert auf der konsequenten Weiterentwicklung der Schletter-FS-Freil

andMontagesysteme, mit denen bereits viele Projekte im Bereich von mehreren hundert MW realisiert wurden.

Besondere Erfahrungen bestehen hier nicht nur im Bereich der individuellen statischen Optimierung für unterschiedlichste regionale Schnee- und Windverhältnisse, sondern auch in der Befestigung beliebiger Modulbauarten.

Wir konstruieren, planen und fertigen individuell geplante Carports schon ab einem Stellplatz.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the full support system
Full-frame construction is a long-term method, construction requires a lot of template stent. The construction of the bracket is to erect the bracket at the bridge, pour the concrete on the bracket, and remove the template and the bracket after the concrete reaches the strength.
Q:What are the benefits of finished stents?
Through the assembly of different parts can be flexible with a variety of production needs of the design to meet a variety of construction environment.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Design drawings and other technical documents complete, and reported by the owners and supervision and approval. Construction plan has been approved, and made to the team at the end. Temporary facilities and water supply, power supply to meet the normal construction requirements. Related equipment has been fitted and into the scene, with construction conditions.
Q:How to build an effective teaching stent
Teaching design to reflect the learner as the center, it must be based on the cognitive needs of learners to design the corresponding activities. Students need knowledge of the reserves, the need for background schema activation, demand strategy skills based on the basis, otherwise learning is difficult to carry out. In other words, the teacher in the teaching design should be based on the needs of students for students to learn and develop stent.
Q:What is the support frame at the bottom of the car?
The rear end of the ear through the steel plate spring hanging pin and the rear hanging ear hanging ear holder connected to the rear end can be free to swing, the formation of activities lugs
Q:Specification for installation of fire pipe support
The height and spacing of the fire pipe support shall be in accordance with the requirements of the design and construction specifications.
Q:What is the metal material for the RESOLUTE bracket?
The role of drugs is anticoagulant, the coating is the drug wrapped up the polymer carrier. Vascular tissue is hydrophilic, hydrophilic polymers and vascular tissue can be physically compatible, which can greatly reduce the vascular tissue for the stenosis of the inflammatory reaction;
Q:Is the template and stent two or one?
The requirements of the stent support: stable, will not be displaced due to pouring and vibrating, bearing capacity, can support the weight of the board after pouring, and demolition of all the pouring parts on the load, safe, will not collapse, or fall Wounding.
Q:What is a finished stent?
Finished stents are directly from the factory to produce stereotypes of the channel and a variety of connectors, and then by the construction staff on-site assembly of the stent system.
Q:What are the characteristics of the hydraulic support hydraulic system?
Third, the hydraulic support can be replaced lines and substitutability must be strong, that is, after the failure, can be replaced in the shortest possible time and maintenance, thereby reducing the loss and protect the safety of workers!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range