Car Port B3

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Car Port B3


Unser Carport System Park@Sol basiert auf der konsequenten Weiterentwicklung der Schletter-FS-Freiland-Montagesysteme, mit denen bereits viele Projekte im Bereich von mehreren hundert MW realisiert wurden. Besondere Erfahrungen bestehen hier nicht nur im Bereich der individuellen statischen Optimierung für unterschiedlichste regionale Schnee- und Windverhältnisse, sondern auch in der Befestigung beliebiger Modulbauarten. Wir konstruieren, planen und fertigen individuell geplante Carports schon ab einem Stellplatz.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a high-profile template system?
Large template support system refers to the construction of the construction site concrete component template support height of more than 8m, or erection span of more than 18m, or the total load of more than 15kN / ㎡, or concentrated line load greater than 20kN / m template support system.
Q:What is the difference between a shock support and a conventional stent?
support hanger, and then change its design and selection. , Strengthening, anchoring, etc .; 3) seismic support hanger vertical, horizontal hanger, its force, laying, anchoring and so on seismic engineering, structural engineering, mechanical engineering, water supply and drainage and other multi-disciplinary knowledge.
Q:How does the hydraulic support work
he hydraulic support in the course of the work not only to be able to reliably support the roof and should be able to move along with the propulsion forward movement, requiring hydraulic support must have up, down, push, move four basic movements,
Q:What are the benefits of finished stents?
Through the assembly of different parts can be flexible with a variety of production needs of the design to meet a variety of construction environment.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Design drawings and other technical documents complete, and reported by the owners and supervision and approval. Construction plan has been approved, and made to the team at the end. Temporary facilities and water supply, power supply to meet the normal construction requirements. Related equipment has been fitted and into the scene, with construction conditions.
Q:What is the support frame at the bottom of the car?
The rear end of the ear through the steel plate spring hanging pin and the rear hanging ear hanging ear holder connected to the rear end can be free to swing, the formation of activities lugs
Q:How to remove the climbing bag bracket
Climbing bag of the bracket, is a part of the carrying system, took the words, carrying a backpack will be very tired, that the role of mountaineering bag is meaningless.
Q:Is the template and stent two or one?
Material staff, that is, the contractor to see the words in accordance with the quota on it. The template is the contact area, the stent is the building area.
Q:What is a finished stent?
Have shortened construction time, reduce maintenance time and so on. The main applications are mainly used in building water supply
Q:What are the characteristics of the hydraulic support hydraulic system?
Of the reverse, that must ensure that the hydraulic system of self-protection, that is, in the hydraulic system to take certain security measures, such as hydraulic cylinders can take the way of hydraulic lock or some occasions can be used to reduce the incidence of accident valve ;

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range