Cantilever Formwork with Durable Using Time and Trustful Quality

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
200 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Structure of  Cantilever Formwork Description 

 

Cantilever Formwork is  mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical.  A single pouring height is high and the finished concrete surface is perfect. Cantilever formwork has several types, the structure is similar, and has its own different characteristic. Can use them according to actual demand.

Main cantilever FormworkPJ200 & PJ240,CB-240 etc.

 

2. Main Features of  Cantilever Formwork

 

-easy to assemble 

-simple structure.

-easy, rapid and economical.

 

3.  Cantilever Formwork Images

 

 

Cantilever Formwork with Durable Using Time and Trustful Quality

 

Cantilever Formwork with Durable Using Time and Trustful Quality

 

 

4.   Cantilever Formwork Specifications

 

Anchor  system

Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring.

Tensile bolt M30/L= 110

Anchor shoe

Bowl-climbing cone M30/D15

High-strength rod D15

⑤Ancor plate D15

 

Cantilever Formwork with Durable Using Time and Trustful Quality

 

Cantilever Formwork with Durable Using Time and Trustful Quality

 

 

5.FAQ of  Cantilever Formwork

     

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

4) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, 

     it may need 2weeks.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is swelling in a scaffold piercing okay?
this is real, in spite of the undeniable fact that it is a good worse concept to have an commercial achieved with rings. this is by using the fact your physique can pass your piercings extremely, to handle the perspective that works maximum suitable on your physique. usually, that isn't a bad element, yet with industrials, this is a situation. you may discover that an commercial healed with rings would possibly no longer accommodate a bar properly; the piercing might heal unaligned, and donning a bar could be painful or impossible. Plus any save that thinks changing from rings to a bar at 6 to eight weeks will make any distinction from getting a bar initially, you mustn't have faith to poke needles in you. Industrials take 6 months to a year or extra to heal. At 8 weeks, the piercings are nevertheless very lots therapeutic. So in case you have your rings switched at that factor, you would be stressful the piercing, placing back therapeutic, and you will could manage each and all the rigidity and hypertrophic scarring issues besides. It in certainty comes right down to this, industrials suck to heal. Bars are difficult to heal. yet rings will often bring about undesirable commercial placement and alignment. in basic terms get pierced with a bar and manage the matters as they arrive. it is nevertheless very lots a danger to heal an commercial, it in basic terms takes time, persistence, and an exceedingly stable piercer (and prefer I reported come across a extra beneficial save, whoever advised you it would artwork to alter the jewellery from rings to a bar at 8 weeks is an fool).
Q:PHYS !!!A scaffold of mass 53 kg and length 6.5 m is supported in a?
Static Equilibrium: ΣTorques: 53g(3.5) + 80g(4.8) = T(6.5) {where T = ANS (a) (53)(9.8)(3.5) + (80)(9.8)(4.8) = 6.5T 1817.9 + 3763.2 = 6.5T 5581.1 = 6.5T T = 5581.1/6.5 = 859 N ANS (a) Total weight = (53 + 80)(9.8) = 1303 ANS (b) = 1303.4 - 858.6 = 444 n
Q:Attached to the lifting scaffolding installation site how to write
All threaded connections nuts have been tightened.It should be removed from the live construction load have been evacuated after.
Q:Scaffold piercing still throbing?
Ear cartilage piercings generally take longer to heal than lobe piercings. This is often due to a combination of things, such as the location of the piercing in the cartilage, the type of jewellery used and the tension that jewellery creates to the structure of the cartilage. Using biocompatible plastics (like PTFE), cleaning cartilage regularly, and increasing your intake of minerals will certainly benefit your piercing; however a piercing will almost always be doomed to failure if improper jewellery and poor planning are used and left unmonitored.
Q:Scaffolding steel pipe, the number of fasteners?Small wall scaffolding, formwork scaffolding support, the number of steel pipe and fastener calculation,
You can simply think that 5 meters per square meter
Q:Bowl buckle scaffold construction needs to pay attention to what problems
Bowl buckle scaffold construction need to pay attention to the problem is:Safety technical clarification before construction.  Strictly in accordance with the requirements of the construction plan and set up in accordance with the JGJ59-99 scaffold inspection requirements for acceptance
Q:How to calculate the quantity of steel pipe in the support system of the bowl buckle scaffold
According to the bearing capacity of the vertical bar, according to the gravity of the beam and slab, the stress analysis of the horizontal member is carried out
Q:If the guillotine operator walked away from the scaffold where would he be headed?
lol, i have no answer for this...just laughter..
Q:What is the purpose of scaffolding and a thigh bone?
It is a way of making a bone strong enough to support body weight without having to be solid heavy bone.
Q:Ear scaffold piercing?
well if you rally want to get a piercing that bad i think you should get it ,but if you don't want a piercing then don't get a piercing at all well i hope you make the right choice well talk to you later.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range