Cantilever Formwork with Durable Performances and Trustful Quality

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
300 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Structure of  Cantilever Formwork Description 

 

Cantilever Formwork is  mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical.  A single pouring height is high and the finished concrete surface is perfect. Cantilever formwork has several types, the structure is similar, and has its own different characteristic. Can use them according to actual demand.

Main cantilever FormworkPJ200 & PJ240,CB-240 etc.

 

2. Main Features of  Cantilever Formwork

 

-easy to assemble 

-simple structure.

-easy, rapid and economical.

 

3.  Cantilever Formwork Images

 

 

Cantilever Formwork with Durable Performances and Trustful Quality

 

Cantilever Formwork with Durable Performances and Trustful Quality

 

 

4.   Cantilever Formwork Specifications

 

Anchor  system

Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring.

Tensile bolt M30/L= 110

Anchor shoe

Bowl-climbing cone M30/D15

High-strength rod D15

⑤Ancor plate D15

 

Cantilever Formwork with Durable Performances and Trustful Quality

 

Cantilever Formwork with Durable Performances and Trustful Quality

 

 

5.FAQ of  Cantilever Formwork

     

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Scaffolding plug (90, outside the 400), this is what ah? How to use ah?
The welding rod is welded on the transverse rod and the diagonal rod, and the transverse rod and the inclined rod are inserted into the lower bowl buckle when the assembly is assembledA bowl type steel tube scaffold column horizontal distance is 1.2 m, the vertical distance according to the load of scaffold is 1.2 m; 1.5 m; 1.8 m; 2.4 m, step away from 1.8 m and 2.4 M. when erecting pole connecting joints should be staggered, staggered first layer vertical rod 1.8 m long and 3 m the vertical bar,
Q:More than 3 floors of the building can be erected with bamboo scaffolding
3, the structure of the scaffold, the components of the initial defects, such as the initial bending of the rod, corrosion, erection size error, eccentric load, etc.;4, and the wall of the connection point, the binding of the scaffold variation. The study of the above issues and lack of systematic accumulation of statistical data, does not have the independent probability analysis of the conditions and structure of the resistance is less than 1 of the adjusted coefficient multiplied by the value determined by calibrating system and safety coefficient used in the past. Therefore, the design method used in this specification is essentially a semi probabilistic, semi empirical. Scaffolding to meet the requirements of this specification is the basic requirements of the design calculation.
Q:Cost of rent per day per month per ton of scaffolding
, so it is difficult to make it clear here, to see where you are in which company rented
Q:Height in the number of scaffolding should be set up scissors
. Starting from the base of the scaffold, the height of the scaffold is set up continuously, the width is not less than 6 meters, and the span is at least over the span of 4 spans, and the span is up to a maximum of 6 spans
Q:why the scaffold nned to be inspected within the preceding seven(7) days?
To make sure that it is constructed properly and things haven';t slipped out
Q:Fastener type steel pipe scaffold wall parts of the lateral spacing is less than the number of
Should be less than or equal to 3 times the vertical pole of the scaffolding.
Q:Should I work Offshore or Scaffold?
offshore for sure buddy,,scaffolding is a pain sometimes,,
Q:Is angkor wat still under restoration with scaffolding?
Basically Angkor Wat is always under construction. The green tarpaulin is still there on the left side, it does ruin the photo opportunity a little bit.
Q:scaffold/industrial piercing help!?
Depends on where you live- I live in Michigan and the tattoo parlors around here are $25.00 for all peircings above the waist. I dont think Ive seen anywhere for more than that. But if you live in California or Florida, it will probably be more because its a big tourist/spring break spot and a lot of college kids get tattoos/peircings on Spring Break, so they jack up the price of everything
Q:What are scaffolding poles usually made of?
They are usualy made form Aluminium.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range