Cantilever Formwork with Cost Savngs for Large Projects

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
300 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Structure of  Cantilever Formwork Description 

 

Cantilever Formwork is  mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical.  A single pouring height is high and the finished concrete surface is perfect. Cantilever formwork has several types, the structure is similar, and has its own different characteristic. Can use them according to actual demand.

The formwork can be moved backward by 600mm for cleaning the formwork and fixing the reinforcing steel bar. Waler connector is used for connecting the form to ensure form alignment.

Form can be pushed to the already cast concrete by turning the adjust carriage to avoid concrete offset or leakage.The formwork can be moved freely as you request. The formwork can be inclined backward and forward. Max. angle: 30°. High standard elements can be widely used.

 

2. Main Features of  Cantilever Formwork

 

-easy to assemble 

-simple structure.

-easy, rapid and economical.

The M30/D20 climbing cones have been designed especially for single-sided concreting using cantilever formwork in dam construction, and to allow the transfer of high tensile and shear forces into the still fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.

 

3.  Cantilever Formwork Images

 

 

Cantilever Formwork with Cost Savngs for Large Projects

 

Cantilever Formwork with Cost Savngs for Large Projects

 

 

4.   Cantilever Formwork Specifications

 

Anchor  system

Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring.

Tensile bolt M30/L= 110

Anchor shoe

Bowl-climbing cone M30/D15

High-strength rod D15

⑤Ancor plate D15

 

Cantilever Formwork with Cost Savngs for Large Projects

 

 

Cantilever Formwork with Cost Savngs for Large Projects

 

 

5.FAQ of  Cantilever Formwork

     

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How long for a scaffold piercing to heal?
Scaffold is a cartilage piercing and cartilage piercings need 1 full year to fully heal if treated properly for the whole healing period. They are nothing like other piercings, they are not easy to heal and they have their ups and downs while doing so. They can stay irritated, swollen and painful for long, bumps can be formed around them which also can get infected. All this goes away after proper care but can happen again days or even months later. So you need to be extra careful with it and follow your piercers after care instructions by the book if you want to keep yourself and the piercing healthy. You need to do sea salt soaks 2 times a day for the whole healing period and never stop. How to do : Warm water (8oz) + non iodized salt (1/4 teaspoon) mixed in a cup. Soak the piercing in for 10 minutes, 2 times a day. Use a q-tip to clean around the piercing thoroughly, rinse with water and pat it dry with a paper towel. Until the piercing is fully healed don't : Touch it, twist the jewelry, play with it, sleep on it, change the jewelry or take it out but only touch it with freshly washed hands to clean it. Do not twist the jewelry. If a piercing is freshly cleaned it can easily slide in and out with the slightest push. Some kids mistakenly think that if you don't twist the jewelry it will somehow get stuck to the skin and never move again. This is a bad myth and can never happen. If you keep twisting the jewelry the crusties that are naturally created and attacked to the jewelry will keep scratching the inside part of the piercing ( the actual wound ) causing trauma again and again, irritating the piercing and dealing the healing process. A new piercing , especially cartilage ones need cleaning, time to heal and avoid touching.
Q:Scaffolding steel pipe, the number of fasteners?Small wall scaffolding, formwork scaffolding support, the number of steel pipe and fastener calculation,
Fasteners with 6. According to the proportion of 70:15:15 were calculated cross, steering, joint fasteners
Q:why the scaffold nned to be inspected within the preceding seven(7) days?
To make sure that it is constructed properly and things haven';t slipped out
Q:a 65 kg painter paints a side of a house while standing on a 5.5m long board w/c rests on a scaffold. the end?
good one babe. Heres yet another for ya An airline captain became breaking in an extremely extraordinarily new blonde stewardess. The path they have been flying had a stay-over in yet another city. Upon their arrival the captain confirmed the stewardess the ultimate place for airline workers to consume, save and stay in a single day. the subsequent morning because of the fact the pilot became preparing the group for the day's path, he observed the hot stewardess became lacking. He knew which room she became in on the hotel and called her up thinking what occurred to her. She replied the telephone, crying, and stated she could no longer get out of her room. you may no longer get out of your room? the captain asked, Why no longer? The stewardess replied, There are in uncomplicated terms 3 doorways in right here, she sobbed, one is the bathing room, one is the closet, and one has a demonstration on it that pronounces 'do no longer Disturb'!
Q:Why the scaffolds need to be inspected within the preceding 7 days and after adverse weather condition?
So you don't fall. The reason you want the inspection to be recent is that people change things when you're not looking. Or, the wind could move something that you're not expecting.
Q:JGJ 130-2011 as well as the specification of woodworking scaffolding
Technical code for safety of steel tubular scaffold with couplers in construction of JGJ 130-2011
Q:How can i fing scaffolding turnarounds online?
Assuming you mean fling and that you only want to fling them virtually you could use Java.
Q:Painters on a scaffold?
I know where he should stand, but where he is standing is by the lunch truck when he should be getting his fat-*** back to work.
Q:musical elements of March to the Scaffold by Hector Berlioz and Danse Macabre by Saint Saens?
Here is a good bibliographic index:
Q:Steel pipe scaffold scaffolding components which are composed of
Classification of steel pipe scaffoldThe domestic steel pipe scaffold material production with steel tubular scaffolding, bowl button steel scaffolding, socket type steel pipe scaffolding, scaffolding doors, and every kind of the scaffolding, hanging scaffold steel pipe scaffolding and other materials. Proceed from its material and structure, and can be roughly divided as follows:

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range