Cable Tray z90

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
5ton m.t.
Supply Capability:
10000 ton/year m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Cable Tray, Perforated Cable Tray, stainless steel cabletray of Cable Tray Z90

 Perforated cable trays have three load carrying capabilities: Heavy Duty Return Flange, Medium Duty Return Flange and Light Duty. 

Features of Cable Tray Z90

-- Increase the current carrying capacity of cables

-- Takes up to 25 percent less space than ladder

-- Hole pattern designed to provide maximum flexibility for positioning cable ties

-- Speed of installation

Specification of Cable Tray Z90

-- Thickness: 0.5 mm - 2.0 mm (22 - 27 Gauge)

-- Height: 15 mm - 75 mm (Light, Medium, Heavy Duty)

-- Width: 50 mm - 900 mm

-- Length: 2-6M (can be produced according to appointed length)

-- Finished: Pre-galvanized (Z80 - Z275), hot dipped galvanized, power coating

Range

Height

Width

Thickness

Light Duty Cable Tray

15-20

50 - 900

0.8 – 2.0

Medium Duty Cable Tray

25

50 - 900

1.0-2.0

Heavy Duty Cable Tray

≥35

50 - 900

1.0-2.0

Other Shapes & Sizes Are Available Upon Request.

 Cable Tray Z90

 Cable Tray Z90

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Buy Taipower c 450P with remote control to add audio and video cable
And I answered the other person's question is very similar: . the line of the banding distance of not more than 1.2 meters, the two ends of the wire box outlet tube 15CM should be ligation; . casing embedded, then through the basement wall, the surface must be installed rigid Waterproof casing, that is, steel pipe + water ring; through the fire pool, living pool: flexible waterproof casing; (wing ring specific practices can be collected online related Atlas); through the floor, according to whether the design requirements , Under normal circumstances PVC casing on it. Note: . rigid waterproof casing, flexible waterproof casing is a one-time reserved in place, through the floor of the casing of the flower lamb to suppress the barge of Xi Jie Xi Xi shou, is the first stay hole, when the installation of riser Casing, because the floor casing has every layer, the location of the reservation will always be biased, in order to ensure vertical vertical pipe, and finally unified hanging line repair hole and then install the riser and casing. . now most of the bathroom are dirty, waste and diversion, and more of the riser, and so on, the air conditioning casing of all the shear wall should be embedded, to avoid the subsequent damage to the structure of drilling (no stay can only drill) Note that the location of the hole and the installation of the riser will affect the opening of the toilet window. . the casing is the casing, riser is the riser, casing than the riser model 1 to 2 level. . plate at the end of flat, board 2 to 5CM higher to see if you need to do leveling layer.
Q:Home wiring is a good line or a good line? Talk about the difference
LCD TV can not be connected to the top of the box and DVD reasons: the connection line is wrong, you need to re-connect the video cable or high-definition multimedia interface line, component color line. . the first audio and video cable to DVD and LCD TV ("video 1" or "DVD" signal source); . Moreover, the set-top box and LCD TV (HDMI1 . the LCD TV, DVD and set-top box power are open; . according to the source selection, if you want to watch the DVD program, put the signal source to switch to the "high-definition multimedia interface cable (HDMI cable) Video 1 ", if it is to see the set-top box program, put the signal source to switch to" HDMI1 ". . so that put DVD and set-top boxes are also connected to the TV.
Q:Seeking the basement of the outer wall piercing the cable after the casing, how to solve the water (200 points online)
To be considered is the Great Wall power line is not long enough, the power is not big enough to see the power on the label, if the 12V to 15A or more I think will be more stable, my Dell machine power cord surprisingly short, but also To buy the extension line again.
Q:What is the current good computer configuration on the market? The price of 4000 yuan or so no more than 4000 assembly parts to write down the price Thank you.
There must be no room for consultation I did not have to do for seven years lazy they want to do nothing irresponsible
Q:What is the difference between wires and cables?
The introduction of the device is to introduce the cable into the electrical equipment, without changing the explosion-proof type of explosion-proof equipment
Q:Wire printed on the word what way to erase
If you need an unqualified wire, you can contact this part
Q:What does the letter of the computer cable model mean?
(The difference between the two cables: WDZ and WDZC are the combustion characteristics of the cable, both halogen-free low smoke flame retardant cable, but the former is a single vertical flame retardant test, which is bundled combustion C class flame retardant Test, but the flame retardant performance requirements are not the same. The meaning of the letter: W refers to the halogen-free; D refers to the low smoke; Z refers to the flame retardant WDZ is halogen-free low smoke flame retardant jacket power cable. WDZC refers to halogen-free low smoke C-class flame retardant reference )
Q:Galvanized wire tube buried to do anti - corrosion do
Galvanized pipe itself with anti-corrosion coating, you can not do anti-corrosion.
Q:What is the cable for rvv? Is it a power cable or a control cable? What is the cable?
The installation process is a certain requirement, high and low voltage cable bridge should be installed separately as usual, a wall laying vertical pipeline (slot) or installation equipment, the power distribution between the depth of D1 = 1200 ~ 1500mm; weak Between the deep distance from the D2 = 1100 ~ 1400mm more reasonable. The length L1 and L2 between the power distribution and the weak can be determined according to how much electrical equipment and pipelines (slots) are installed in the room. "Civil building electrical design specifications" proposed "shaft size in addition to meet the wiring spacing and terminal box, distribution box layout must be the size, but also in the box before the left not less than 0.8m operation, maintenance distance" requirements. In the weak equipment, the operation and maintenance distance is not specified in the provisions of the Code for Electrical Design of Civil Buildings, but it should not be less than 0.8m. Cable to wear steel pipe wiring, should be reserved in the floor steel pipe, wiring should be completed after the plug fire fire blocking material. Cable bridge installation should be horizontal, the maximum sag should not be greater than 10 mm; proposed separate installation
Q:What kind of KVM switch is this configuration below?
Hello according to your request can be used two sets of ordinary 16 cascade, to a control terminal control 32 hosts. Is the cheapest solution. According to my understanding of the domestic Haikang series of products cost-effective, you can understand the next.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range