Cable Tray Z110

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
5ton m.t.
Supply Capability:
10000 ton/year m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Cable Tray, Perforated Cable Tray, stainless steel cabletray of Cable Tray Z110

 Perforated cable trays have three load carrying capabilities: Heavy Duty Return Flange, Medium Duty Return Flange and Light Duty. 

Features of Cable Tray Z110

-- Increase the current carrying capacity of cables

-- Takes up to 25 percent less space than ladder

-- Hole pattern designed to provide maximum flexibility for positioning cable ties

-- Speed of installation

Specification of Cable Tray Z110 

-- Thickness: 0.5 mm - 2.0 mm (22 - 27 Gauge)

-- Height: 15 mm - 75 mm (Light, Medium, Heavy Duty)

-- Width: 50 mm - 900 mm

-- Length: 2-6M (can be produced according to appointed length)

-- Finished: Pre-galvanized (Z80 - Z275), hot dipped galvanized, power coating

Range

Height

Width

Thickness

Light Duty Cable Tray

15-20

50 - 900

0.8 – 2.0

Medium Duty Cable Tray

25

50 - 900

1.0-2.0

Heavy Duty Cable Tray

≥35

50 - 900

1.0-2.0

Other Shapes & Sizes Are Available Upon Request.

 Cable Tray Z110

 Cable Tray Z110

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the difference between a trunking and a bridge in a weak construction?
Mainly to distinguish the ground which is the ground, the color of the ground is generally yellow-green; wire two is the fire line L and zero line N, no ground wire, look at the plug on the LN mark, the corresponding good.
Q:How to distinguish between power cables and electrical wiring on drawings
According to the control cable and the power of the different layers of laying, if the power cable to be multi-layer need to have 300mm spacing (or load capacity is large enough), if it is control cable, casually laying, if the laying of power cable laying below Layer, above the laying of control cable, but not too much affect the power cable cooling. If the high-voltage cable and low-voltage cable in principle do not allow common laying.
Q:Will the extension of the output of the electric vehicle charger wire affect the voltage?
Is not the home of the bus box? Generally put a cat, a router, a power outlet, two transformers, the other is the network cable and telephone, the key space to be enough
Q:2.5 square copper (green, with the threading tube) can withstand the highest power of several kilowatts,
Do not know why not mislead. The The The The The Fire resistance is IECGBBS6387. GB is the general principle of flame retardant and fire resistant wire and cable, quoted the above criteria...............
Q:Wire printed on the word what way to erase
If you need an unqualified wire, you can contact this part
Q:Why this cable has not yet been certified
Electromechanical products are usually used to be assembled into parts, multiple parts and then assembled into a single product, the number of products or the number of pieces measured
Q:What is the difference between wires and cables?
The introduction of the device in the form of: sealing ring (sealing ring is to achieve the required protection level of the shell and the use of cash-saving brush to help find the silent material or elastic material parts) type of introduction device; casting solidified packing seal Type introduction device; metal seal ring introduction device
Q:What kind of KVM switch is this configuration below?
Direct selection of reton's 32-port digital KVM, model is: KS-2032C. Fast transmission, wiring is simple. Want to know the price to ask their website on it.
Q:Galvanized wire tube buried to do anti - corrosion do
No need. Galvanized flat iron to do when the grounding grid is not anti-corrosion, but if there is welding or damaged place to become anti-corrosion.
Q:Wire pipe inlet air switch trip how to do?
The middle of the line is not a problem where there is a problem in the place where the joints check the place of the joints can not do the lines are out to check the time and effort

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range