BULLDOZER CLGB160 (weichai),Operator Safety and Comfort

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 SPEC

EngineWeichai
Gross Power128 kW (174 hp ) @ 1,850 rpm
Net Power120 kW (163 hp ) @ 1,850 rpm
Maximum Torque830 N.m
Blade Capacity4.5 m3
Operating Weight17,000 kg

FEATURES

Operator Safety and Comfort

  • Spacious cab with excellent view of blade.


  • GRAMMAR suspension seat is ergonomic and adjustable to operator specifications.


  • Shock absorber between wing plate and chassis greatly reduces vibrations felt.


  • Redesigned cab with improved upholstery and sound proofing.


  • ROPS/FOPS cab.

Reliability

  • Reliable turbocharged Weichai engine.


  • Control box for bulk of electrical equipment simplifies maintenance.


  • Parts, service, and attachments you can count on.


  • Very large maintenance space at rear of machine.


  • Optional pressure managements system helps diagnosis malfunctions and simplifies repair.


  • Cap type connection between blade and blade lift cylinder ease maintenance.

Easy to Maintain

  • Control box for bulk of electrical equipment simplifies maintenance.


  • Very large maintenance space at rear of machine.


  • Optional pressure managements system helps diagnosis malfunctions and simplifies repair.


  • Cap type connection between blade and blade lift cylinder eases maintenance.


  • Air, oil and water filter easily accessible.


  • Monitoring system automatically checks machine status, provides error codes and warnings when needed.

Built for Efficiency

  • 5-8% better fuel economy than domestic competition.


  • Long tracks with high stability and maneuverability.


  • Ultra-high crushing force parallelogram ripper.


  • Meets EU stage II/EPA Tier 2 emission standards.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can a private project manage the construction machinery?
At present, the construction machinery market is very large, engineering machinery product varieties, large quantity, high mobility, wide distribution and related system of laws and regulations and the lack of specific management standards has become a short board to restrict the development of construction machinery industry. Due to the lack of effective supervision, the purchase of debt disputes, construction disputes, robbery cases and pollution monitoring and other issues to emerge in an endless stream.
Q:Tianjin Construction Machinery Research Institute?
China Construction Machinery Corporation was founded in December 2005 by the Tianjin Research Institute of engineering machinery and China Construction machinery complete sets of companies, under the China National Machinery Industry Corp. Headquartered in Tianjin, is located in Tianjin hi tech Industrial Park, covers an area of 400 acres. Existing enterprises 12, the total assets of 1 billion 800 million yuan, the total number of workers 3000 people.
Q:Requirements for construction engineering personnel
4., according to the construction needs and mechanical equipment, reasonable allocation of construction machinery, and constantly improve the utilization rate of construction machinery and construction machinery efficiency
Q:What are the differences between mechanical engineering and mechanical design, manufacturing and automation?
Each school according to their own circumstances, in the professional refinement of differences, reflected in the professional name of some differences. Mechanical engineering and automation, covering a more comprehensive. Mechanical design, manufacture and automation focus on "design"". Mechanical manufacturing and automation focus on manufacturing". If you are not interested in electricity, study the latter. If you are interested in electrical control, you can study before you can.
Q:What are the five major cost components of the project cost?
Material cost means the amortization of the raw material, structural parts and semi-finished products, auxiliary materials, and turnover materials and the rental costs of the raw materials, components, fittings and semi-finished products, auxiliary materials, which are included in the budget. Mechanical use fees refer to the contents of the quota included in the budget, the mechanical use fees incurred in the construction process and the rental fees of the construction machinery leased by the outside units, and the fees for installation, disassembly and entry and exit
Q:The difference between mechanical engineering and automation and electrical engineering
The main part of electrical engineering is circuit, electronic technology, electrical control, electrical machinery, power system, and so on. The destination of graduation is the power plant and some electronic related enterprises, which are very different
Q:Who can introduce the famous domestic machinery enterprises?!
2007 China top 500 list of enterprises, the national machine group ranked seventy-eighth. Is the most well-known enterprises, but also participated in the "Chang E" project". This is the main several, other machinery manufacturing enterprises, there are many home.
Q:Urgent! Is mechanical engineering major or special?
The mechanical engineering is not necessarily a special master, there may be a master, because some graduate students in Colleges and universities is in accordance with the level of subject enrollment, strictly speaking, is a mechanical engineering disciplines, including mechanical design and theory, mechanical and electronic engineering, mechanical manufacturing and automation of the three two subjects
Q:The mechanic distinguishes himself from the equipment manager
Report the equipment management, maintenance and technical status to the Department in charge and the leader in charge regularly, and put forward suggestions for improvement. Device manager. As the name suggests, it is a manager of equipment management.
Q:Registration process of a construction machinery maintenance plant in Tangshan? What information should be prepared and which departments should be handled?
To register a company, first of all want to operate well, how to manage well, and then register. Otherwise, it is useless to register. It takes a lot of cost to register a company. It is not a "fun" thing.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range