Building Tunnel Formwork System

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Building Tunnel Formwork:

A compositional steel formwork system mainly used in the building which has regular structure

without beams, the excellent formwork system can make the integral pouring for the wall & slab

easily achieved.


Characteristics:

◆ No assembling, easy operation with formed formwork.

◆ High stiffness, make perfect shape for concrete.

◆ Repeatedly turnover is available.

◆ Widely applied range, such as building, bridge, tunnel, etc.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Who can give me detailed tunnel construction process
Tunnel construction process, the first branch is a temporary payment, two lining is a permanent support.1, the hole before the edge, the construction of the slope (including drainage, electricity, etc.);2, the construction of large pipe shed3, measurement positioning line;4, drilling, blasting;5, slag, playing anchor, steel, injection (including the initial spray and spray)6, ahead of the anchor (after the pipe section)7, measuring the line;
Q:Where is the B-B section of the tunnel invert reinforcement
This part of the tunnel lining is generally the first pouring, pouring formwork trolley can be placed on the inverted arch concrete and support, to the construction of the tunnel arch wall concrete.
Q:How to arch the arch concrete pouring
Two concrete tunnel lining, template is used according to the size and shape of the tunnel design custom-made, I-beam welded frame, welded steel plate, known as the "two trolley liner" (hydraulic jack lifting and installation of steel wheel moving on the rail), is generally the length of 9~12m, concrete pouring pump concrete.
Q:There are no recycling tunnel templates
If you want another company for the recovery of tunnel two lining trolley, the specific type of price and the address of the template of the trolley that would be able to better the template of the trolley recovery, to play its due value template trolley.
Q:On the measurement of total station
The first instrument identification, according to the drawings issued by the tunnel portal design to determine, determine the portal after the slope portal to lofting, tunnel excavation and excavation contour checking (i.e. overexcavation measurement)
Q:What is the simple calculation method of the tunnel excavation unit price
Parameter valuationThe valuation of parameter method is the method of calculating the multiplication coefficient according to a certain cardinal number or the custom formula. This method is simple and clear, but the biggest difficulty is the scientific formula, accuracy is difficult to grasp. This method is mainly applicable to the construction process must occur, but it is difficult to predict the specific items in the bidding, but can not separate the project content of the project measures. If the valuation night construction fees, two handling fee, rain during construction can be used in this method.
Q:12 meters of the tunnel car, under normal circumstances, one of the two months to be able to cast a few models?
If the reinforcement in advance or tied to the design of no reinforcement, the normal situation down the car, plus the plug plate, pouring concrete
Q:When the tunnel fight, there is no provision for the number of meters hit
Fixed strip: the use of additional reinforcement fixation; special fixture fixed; the wire and the fixed template (Figure 2).
Q:The bridge template that the highway needs, probably with what kind of thickness can satisfy
Hello, highways, bridges, tunnels, dams, railways and other projects, are generally used in bridge plate 12/15/18MM specifications
Q:Main diseases and prevention of tunnel
Insufficient anchor tensionPhenomenon: anchor installation is not strong, pulling force is not enough.The reason analysis: anchor length is not enough; mortar grouting is not full; mortar wrapped anchor thickness is not enough or not at all; holes in the debris is not clean; the depth of the hole with the length of the bolt is not matching.Preventive measures: the hole diameter should be matched with the bolt diameter; strictly according to design deep hole drilling; grouting pressure and wind pressure water rinse perforations; bolt rust, straightening, ensure the bolt and hole center line on the same line of installation; the hole from the bottom of the hole, uniform and continuous. Midway not interrupt; using earlystrong medicine package bolt, the bolt diameter should be treated with perforation diameter matching.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range