Building Machinery Factory Topkit Trolleying Tower Crane Motor

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Descriptions of our Building Machinery Factory Topkit Trolleying Tower Crane Motor


1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our Building Machinery Factory Topkit Trolleying Tower Crane Motor


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our Building Machinery Factory Topkit Trolleying Tower Crane Motor

ItemParameter
Free standing height (m)50
Max height with attachment (m)200
Working range can be adjusted(m) 50/55/60/65/70
Min working range(m) 2.5
Max lifting capacity(t)20
Tip load @ 70m(t)5
Hoist mechanism (VFD+PLC)Falls24
Lifting capacity(t)0-50-100-100-20
Speed(m/min)0-800-400-400-20
MotorYZPBF280S-4-75KW
Trolleying mechanism (VFD+PLC)Speed(m/min)0-60
MotorYPBE132M-4-11KW
Slewing mechanism (VFD+PLC)Speed(r/min)0-0.6
MotorYTRVF 132M2-4-9KW×3
Climbing speed(m/min)0.45
Counterweight(t)25
Mast section size(L×W×H)mm2450×2450×5000/2500×2590×6000
Working temperature-40-+60°C
Max working wind(m/s)20
Total power(KW)115
Rated working voltage & current380V/273A

Building Machinery Factory Topkit Trolleying Tower Crane MotorBuilding Machinery Factory Topkit Trolleying Tower Crane MotorBuilding Machinery Factory Topkit Trolleying Tower Crane MotorBuilding Machinery Factory Topkit Trolleying Tower Crane Motor

Building Machinery Factory Topkit Trolleying Tower Crane Motor


Building Machinery Factory Topkit Trolleying Tower Crane Motor

FAQ Building Machinery Factory Topkit Trolleying Tower Crane Motor

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:National standards for tower cranes
GB/T 5031-2008 GB 5144-2006 tower crane safety code for tower crane safety GB mechanical and electrical equipment thirty-second 5226.2-2002 mechanical parts: requirements for hoisting machines GB 5802-1986 lifting short chain hoists and other lifting equipment for the T (8) test specification level calibration chain GB 5905-1986 hoisting machine test code and procedures GB/T 5905-2011 crane and GB/T program 5972-1986 lifting wire rope for examination and discard utility specification GB/T 5972-2006 crane wire rope inspection and scrap utility specification GB/T 5972-2009 crane wire rope maintenance, maintenance, installation, inspection and disposal GB/T 5973-1986 wire rope with wedge joint GB/T 5973-2006 wire rope with wedge joint
Q:Construction tower crane operator certificate expires, how to verify?
Two, training contentThe crane safety regulations and operation management; classification and main parameters of the crane; the structure and the working principle and the safety protection device of lifting up; the installation and removal of heavy machinery; the whole debugging and acceptance of heavy machinery; the operational and command signal of lifting and repair; and maintenance of heavy machinery.Three, training hours and full-time training arrangement: 5 days, annual training enrollment.Four, training fees450 yuan / person, including registration fees, training fees, books, information, assessment, assessment fees, accommodation, self-care.Five, training certificationStudents complete the prescribed courses, through the examination, after passing the examination by the Municipal Construction Commission issued a number printed and stamped with the "Chongqing City Construction Management Committee of" legal. "Chongqing construction tower crane operator qualification certificate".
Q:Notice of tower crane
Installation condition of 3.2 tower crane3.2.1 tower crane has special equipment manufacturing license, product certification, manufacturing supervision and inspection certificate, the tower crane manufactured abroad should have product certification, and has been in the construction administrative departments for registration.3.2.2 tower cranes shall be of complete structure and conform to the provisions of GB5144 "safety regulations for tower cranes".3.2.3 under the following circumstances, tower cranes are not allowed to use:If the state has been eliminated from the designated period of time, exceeding the prescribed service life assessment, the safety devices and safety facilities can not meet the safety and technical standards of the state or industry; there is no complete safety technical file.3.2.4 tower cranes must be maintained and fully checked before they are installed. Structural parts with visible cracks, severe corrosion, overall or partial deformation, connecting shafts (pins), Kong You, severe wear and tear should be repaired or replaced, in accordance with the provisions of the installation.3.2.5 tower crane foundation should meet the requirements of the use manual, the carrying capacity of the foundation must meet the requirements of tower crane design, installation should be carried out before the hidden project acceptance, qualified before installation. Slope and drainage facilities should be built around the foundation.The track foundation and track laying of 3.2.6 walking tower crane shall be carried out according to the instruction manual and shall comply with the provisions of GB5144.
Q:How often should the crane be inspected regularly?
Lifting machines are inspected regularly every two years, and explosion-proof lifting machines shall be inspected regularly every year. Must have the corresponding inspection qualification inspection.
Q:What is the definition of lifting, slewing and luffing of tower cranes?
Rotary is cantilever tower crane tower crane rotary shaft winding;Is the hook shaft distance amplitude change;
Q:What should the sub contractor do before the installation of the bridge crane in the workshop?
Baidu search [tower crane tower demolition, lowering section safety technical disclosure]. If it is installed, remove the "two words" to "installation", and other contents are adjusted slightly.
Q:Tower crane railing height is greater than or equal to meters
GB 6067 requires the height of the railings of the crane to be 1050mm, and a horizontal bar with a spacing of 350mm shall be provided. The bottom should be set at a height of not less than 70mm.
Q:How to improve the stability of tower crane
Increase the overall weight of the base and weight, the tower structure to be strengthened.Crane wire rope is phosphate coated steel wire, galvanized steel wire, stainless steel wire rope, the use of atmospheric environment, patented technology to produce manganese phosphating coating of steel wire rope has the longest lifespan, heavy corrosion environment optimization of hot galvanized wire rope double - phosphating coating.
Q:What's the difference between QTZ63 and qtz630, isn't it the same kind of tower crane?
It's the same kind of tower crane, but it's only a unit of rated lifting torque. The former unit is 63 tons. M, the latter is 630 kn m. According to the latest national standard "tower crane", GB/T5031-2008 and QTZ63 are written correctly.
Q:Do self lifting tower cranes allow a small swing of the boom in jacking operation?
The upper crossbeam of the jack is connected with the jacking frame, and the lower cross beam is provided with a movable claw, and the lower supporting point can fall on the step of the standard section of the tower body. During lifting, first trim jib and balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range