Building Hoist (Model:SC(D)270, SC(D)270/270)

Ref Price:
$1,800.00 - 20,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Construction Hoist Description

(1)Creativeintroduce design philosophy single reducer dual output, the successful trial of a recyclable waste rack unit modular dual output construction lifts, lift the rack and pinion contact stress decreased by 50%, the transmission of the modular units can maximize the elimination of the error superimposed gear pair in the rack height direction, so that the whole movement is very smooth, greatly improving the rack and pinion and other key pieces of the life of this technological innovation for three national patents.

(2)A kind of automatic leveling floor, overload protection control and floor call, the three-in-one smart console application. Construction hoist intelligent automatic leveling floor, to ensure that the hoist can accurately place, to reduce machine wear and impact, and also slow down the drivers frequent operation of the degree of fatigue.

(3)Integrated operating room, frequency control system integration cabin. To strengthen safety and real using of hoist cage top job, at the same time greatly improve the aesthetic effect of the engine, the technology won the national patent.

(4)Advanced frequency control system. The construction elevator VVVF frequency control electrical control system adopts the most advanced frequency control and microcomputer programmable logic controller (PLC) control. Frequency control technology make the motor start, the braking process variable speed, ease the mechanical impact, and increased running stability, extended machine life. Brake can be achieved a zero speed, thereby extending the life of the brake. Frequency control system with a current limiting function, leaving the motor difficulty in starting the motor starting current, reducing the impact on the grid to ease the impact of the site electrical equipment, not because of the long distance power supply cable voltage drop. Frequency control system further comprising: overvoltage, undervoltage, overcorrect, overload, prevent stalling and other security features.

(5)Two Hardened reducerreached transmission efficiency up to 94%, big carrying capacity, long life. Efficient hardened gear together with the the advanced frequency electronic control system to lift the use of more energy-efficient. Construction ladder down the gravitational potential energy and kinetic energy is almost equivalent conversion, so that the motor operating current is almost zero, year-on-year ordinary domestic construction lift a nearly 50% reduction in energy-saving effect.

 

Construction Hoist Specifiction:

Name

Building Hoist

Model

 SC100, SC100/100

Certificate

ISO9001:2000

Capacity

1000kg/cage

Lifting speed

36m/min,or 0~63m/min,or 0~96m/min

Mast section:

Paint or hot dipping zinc

Cage

Single cage or twin cage

Cage size

(L x W x H) (m): 2.5 x 1.3 x 2.5; 3.0 x 1.3 x 2.5; 3.2 x 1.5 x 2.5; 3.6 x 1.5 x 2.5; 3.8 x 1.5 x 2.5; 4.0 x 1.5 x 2.5; 4.2 x 1.5 x 2.5, cage dimension is according to requirement of customer and special project

Motor

Top brand of China,also can be SEW motor.

Reducing device

Top brand of China

Counterweight

With or without counterweight

The colors of cage

 yellow, or red, or blue

 

Images of construction hoist

 

FAQ of Construction Hoist

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance& exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The working principle of construction elevator
The construction elevator is a kind of common name, its standard name should be the construction elevator, this is a kind of crane machine equipment. Construction lifter adopts modular structure, because it is used in construction process, the elevator needs to be constantly shift with the construction project, therefore its structure must be easy to disassembly and assembly. For example, after the site is used, the elevator is disintegrated and transported to another site for reassembly of construction elevators. So how does the construction elevator work? The construction elevator mainly carries the structural self-forming system, and the construction dependence is low. It more driven by force, drive devices are installed on the hanging basket, through the gear and rack drive system, the mutual cooperation, so as to realize the rise and fall of the elevator. You may have seen gear and rack in the mechanical clock, the gear is round, the rack is straight, and the two bite together to achieve the motion. The elevator work that is common in our residential and commercial buildings is different from the construction elevator. Most of the elevator parts are fixed in buildings, which are mainly carried by buildings. Its movement is achieved through wire rope.
Q:The maximum allowable deviation of the vertical is the vertical degree when the construction elevator is installed
The development of the elevator is in a peak state, because most of the manufacturers or individuals to improve the utilization efficiency of space, more options for multistory buildings, which also need a device to convenient up and down by the goods. Due to the common elevator cost is high, bearing capacity is low, not suitable for carrying dozens of tons or hundreds of tons of cargo, so developed a high bearing capacity of hydraulic lift to assist in the production and transportation of goods. The elevators are both safe and super loadable, and convenient for maintenance, making the special industry grow faster.
Q:Safety device for construction elevator
When the cage is in an emergency for various reasons during the operation, the driver can press the stop switch at any time, making the cage stop running. The fast stop must be a non-self-restoring safety device, usually installed in the top of the cageConstruction lifter lifting door, protective enclosure door are equipped with electric interlock switch, which can effectively prevent because of hoisting cage or protective enclosure door open it up and running and materials caused by falling, only when the hoisting cage door and protective enclosure fully closed to start running.
Q:The safety officer shall be responsible for the work of the construction elevator
Certificate of factory, whether the elevator is inspected by the competent authority, the operator has the evidence. Conduct safety techniques for operators.
Q:How many meters or how many layers should the construction elevator be installed?
In the guangdong area, the first installation and acceptance of the equipment will be below 7 levels, and more than 7 floors will be charged for the inspection. Another 9 meters per wall, the most suitable installation time is a building at least 12 meters, which can be installed at 21 meters in the evening.
Q:Is the elevator detail a construction plan? Do you have a detailed picture of the elevator?
You're talking about the elevator or the elevator shaft, the elevator is the equipment, the elevator manufacturer has the working paper. As for the elevator well according to the data of zxtech figure design, general construction diagram and structure diagram, industry make a steel cylinder or cone steel structure party sometimes out construction diagram, according to the structure of the construction
Q:Where is the location of the elevator in the project
Hard to answer, I think should combine the construction plan, adjacent to roadway facilitate material transport, and combining with the construction progress, do not put in sample area, in addition to combined with the construction interface classification and so on into consideration, to say.
Q:Is there a specification requirement for the floor door of the elevator to the floor? How high
Layer should be made from steel door frame, Shanghai silk screen, and is equipped with solid and reliable locking device, elevator door layer, the process should be hanging cage crew operations, shall not be under the direct control of elevator lift cage's movement. The net height should not be lower than 1.80 m, and the width of the door should not be greater than 120mm.
Q:Can a construction elevator use a single cage
Can use single hanging cage, an accident is a management issue could not be struck down so many people, if such construction lifter dual-use goods elevator belongs to the people, 19 people find this elder brothers say batter to death then top with manned elevator nor safe, in fact is a regular inspection, site do not have an accident can only say that the site is too lax
Q:The staff on the construction platform shall not exceed the number of people
There is no specific specification that should be more platform-specific

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range