Building Hoist (Model:SC(D)270, SC(D)270/270)

Ref Price:
$1,800.00 - 20,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Construction Hoist Description

(1)Creativeintroduce design philosophy single reducer dual output, the successful trial of a recyclable waste rack unit modular dual output construction lifts, lift the rack and pinion contact stress decreased by 50%, the transmission of the modular units can maximize the elimination of the error superimposed gear pair in the rack height direction, so that the whole movement is very smooth, greatly improving the rack and pinion and other key pieces of the life of this technological innovation for three national patents.

(2)A kind of automatic leveling floor, overload protection control and floor call, the three-in-one smart console application. Construction hoist intelligent automatic leveling floor, to ensure that the hoist can accurately place, to reduce machine wear and impact, and also slow down the drivers frequent operation of the degree of fatigue.

(3)Integrated operating room, frequency control system integration cabin. To strengthen safety and real using of hoist cage top job, at the same time greatly improve the aesthetic effect of the engine, the technology won the national patent.

(4)Advanced frequency control system. The construction elevator VVVF frequency control electrical control system adopts the most advanced frequency control and microcomputer programmable logic controller (PLC) control. Frequency control technology make the motor start, the braking process variable speed, ease the mechanical impact, and increased running stability, extended machine life. Brake can be achieved a zero speed, thereby extending the life of the brake. Frequency control system with a current limiting function, leaving the motor difficulty in starting the motor starting current, reducing the impact on the grid to ease the impact of the site electrical equipment, not because of the long distance power supply cable voltage drop. Frequency control system further comprising: overvoltage, undervoltage, overcorrect, overload, prevent stalling and other security features.

(5)Two Hardened reducerreached transmission efficiency up to 94%, big carrying capacity, long life. Efficient hardened gear together with the the advanced frequency electronic control system to lift the use of more energy-efficient. Construction ladder down the gravitational potential energy and kinetic energy is almost equivalent conversion, so that the motor operating current is almost zero, year-on-year ordinary domestic construction lift a nearly 50% reduction in energy-saving effect.

 

Construction Hoist Specifiction:

Name

Building Hoist

Model

 SC100, SC100/100

Certificate

ISO9001:2000

Capacity

1000kg/cage

Lifting speed

36m/min,or 0~63m/min,or 0~96m/min

Mast section:

Paint or hot dipping zinc

Cage

Single cage or twin cage

Cage size

(L x W x H) (m): 2.5 x 1.3 x 2.5; 3.0 x 1.3 x 2.5; 3.2 x 1.5 x 2.5; 3.6 x 1.5 x 2.5; 3.8 x 1.5 x 2.5; 4.0 x 1.5 x 2.5; 4.2 x 1.5 x 2.5, cage dimension is according to requirement of customer and special project

Motor

Top brand of China,also can be SEW motor.

Reducing device

Top brand of China

Counterweight

With or without counterweight

The colors of cage

 yellow, or red, or blue

 

Images of construction hoist

 

FAQ of Construction Hoist

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance& exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Does the new approach builder need a localizer test report
According to the current national standard "construction lifter safety regulation GB10055-2007 the provisions of article 11.1.9: for safety device can only be valid for use within the period of validity of calibration, the effective calibration period shall not exceed one year. According to the current industry standard "progressive construction lifter gear cone drum for safety device, the regulation of JG 121-2000: for safety device, no matter use or not, after the expiration of the valid inspection must be back to check calibration. The life of the safety device is five years. In order to ensure the safe use of the construction elevator, the construction elevator should be carried out every three months - the fall test and the formation record. It is recommended to refer to jgj215-2010, the safety technology regulations for building construction elevators.
Q:The construction elevator always jumps
Possible causes include: 1, the area that has broken skin in the line, leak the electric trip. There's something wrong with the switch Loose contact points in the line, and bad contact may also jump. It is best to do a thorough examination before closing the lock, and the forced closing is dangerous
Q:The construction elevator can not operate during the use of several stages of wind power
Well, there are no definite rules. It's up to you to decide whether to use it or not
Q:Can construction elevators be taken by people or by goods
 yes, you can! It is to pass the authority authority to issue use card to be able to use! Construction lifts are also called elevators
Q:What is the meaning of double straps in the construction elevator?
With double cage for heavy, namely SCD200/200 series Is the two cages, each cage has a corresponding weight, the weight up and down in the elevator cage rise to energy conservation and reduce the reaction between the up and down, when you imagine front-rear door principle is about the same
Q:How to set up the construction elevator?
Direct contact with the elevator company, and they give you a plan for the construction of a pre-buried piece, and the parameters of each elevator are different,
Q:What's going on with the decline in construction lift
Check whether the brake contactor and normal, contactor adhesion conditions will decline, brake pads have the problem not only rise to fall, fall in the same slide. If the contactor is ok, you can see that there is a groove on the brake pad, and it is only replaced if the brake is not damaged, such as cracking. If it's a frequency conversion elevator, if you're down, see if the converter has any fault code, if you have a consulting manufacturer. The assumption is that the anchuan frequency converter, which may be a real SE failure, means that the timing error is not normal for controlling the contact of the receiver.
Q:How many guides are in the construction elevator
A guide frame on each side of the construction elevator, which is formed by using the section of the standard section in section 1.
Q:How does the driver of the construction elevator do the search for a sudden power failure
When the elevator in the operation of the midway stop due to power outages or other reasons, the manual can be decreased, the end of a motor brake electromagnet manual release slowly shake handshandle pull outward, slowly slide down the ladder cage, ladder cage fall shall not exceed the rated speed, manually drop must be conducted by professional maintenance personnel.
Q:What is the need for the sc200/200 construction elevator cable?
The company now USES 3X25 + 2x10 cables

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range